Home / Browse projects / Sangli, Maharashtra / HARI-OM

Completed No litigation declared Residential / Group Housing project

HARI-OM

By PRAJ Developers

RG-MH-16093 · RERA P53100025107 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

HARI-OM is a Residential / Group Housing project by PRAJ Developers in Sangli, Maharashtra, registered with MahaRERA as P53100025107 on 18 Mar 2020. The registration is recorded completed; possession was promised by 30 Mar 2025.

At a glance

Project

  • NameHARI-OM
  • TypeResidential / Group Housing
  • Location
    • Behind New Court Building
    • Wanlesswadi
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100025107
  • ReraGenie IDRG-MH-16093

Builder

  • NamePRAJ Developers
  • Entity typePartnership
  • PartnersPiyush Dhiraj Shah, Rahul Madhukar Shete
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2020PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Mar 2020
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed120 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HARI-OMNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

HARI-OM: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area715 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1430.68
Proposed, not sanctioned1,012 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMarket Yard, Sangli

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Ambernath M Shinde
EngineerSamir Najir Bargir
Chartered AccountantAditya Lahoti
PartnerRole in project
PRAJ Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2025

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2025 03 31 Praj Developers Form 2A.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 06 30 Praj Developers Form 3.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 09 30 Praj Developers Form 3.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 12 31 Praj Developers Form 3.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2025 03 31 Praj Developers Form 3.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024 06 30 Praj Developers Form 2.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024 09 30 Praj Developers Form 2.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024 12 31 Praj Developers Form 2.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2025 03 31 Praj Developers Form 2.pdf1 May 2025
2020 06 30 PRAJ Developers Form 129 Apr 2025
2020 03 31 PRAJ Developers Form 129 Apr 2025
2025 03 31 PRAJ Developers Form 129 Apr 2025
2024 12 31 PRAJ Developers Form 129 Apr 2025
2024 09 30 PRAJ Developers Form 129 Apr 2025
2024 06 30 PRAJ Developers Form 129 Apr 2025
2024 03 31 PRAJ Developers Form 129 Apr 2025
2023 12 31 PRAJ Developers Form 129 Apr 2025
2023 09 30 PRAJ Developers Form 129 Apr 2025
2023 06 30 PRAJ Developers Form 129 Apr 2025
2023 03 31 PRAJ Developers Form 129 Apr 2025
2022 09 30 PRAJ Developers Form 129 Apr 2025
2022 06 30 PRAJ Developers Form 129 Apr 2025
2021 12 31 PRAJ Developers Form 129 Apr 2025
2021 09 30 PRAJ Developers Form 129 Apr 2025
2021 06 30 PRAJ Developers Form 129 Apr 2025
2021 03 31 PRAJ Developers Form 129 Apr 2025
2020 12 31 PRAJ Developers Form 129 Apr 2025
2020 09 30 PRAJ Developers Form 129 Apr 2025
2022 12 31 PRAJ Developers Form 129 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 09 30 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2024 03 31 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2023 12 31 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2023 09 30 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2023 06 30 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2023 03 31 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 12 31 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2022 06 30 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 12 31 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 09 30 Praj Developers Form 3.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2021 06 30 Praj Developers Form 3.pdf29 Apr 2025
2021 06 30 Praj Developers Form 229 Apr 2025
2024 03 31 Praj Developers Form 229 Apr 2025
2023 12 31 Praj Developers Form 229 Apr 2025
2023 09 30 Praj Developers Form 229 Apr 2025
2023 06 30 Praj Developers Form 229 Apr 2025
2023 03 31 Praj Developers Form 229 Apr 2025
2022 09 30 Praj Developers Form 229 Apr 2025
2022 06 30 Praj Developers Form 229 Apr 2025
2021 12 31 Praj Developers Form 229 Apr 2025
2021 09 30 Praj Developers Form 229 Apr 2025
2022 12 31 Praj Developers Form 229 Apr 2025
Disclosure of sold/ booked inventoryFile: 2025 03 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2024 12 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2024 09 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2024 06 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2024 03 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2023 12 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2023 09 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2023 06 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2022 12 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2022 09 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2022 06 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2022 03 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2021 12 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2021 09 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2021 06 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2021 03 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2020 12 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2020 09 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2020 06 30 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: 2020 03 31 PRAJ Developers Sold Inventory.pdf29 Apr 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: 2025 03 21 Declaration Index.pdf28 Mar 2025
Status of ConveyanceFile: 2025 03 21 Deed of Declaration 3MB.pdf28 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2025 03 18 SMKC Authentication.pdf28 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2025 02 27 Occupancy Permission.pdf5 Mar 2025
Details of encumbrances concerned to LegalFile: 2024 03 31 Legal Title Report.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: 2024 03 31 Legal Title Report.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2024 03 31 Form 2A PD.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2024 03 31 Arun Dhondiram Shintre RERA.pdf10 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2024 03 31 Rahul Madhukar Shete.pdf10 Oct 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HariDattaS. No. 42 Plot No 43 Wanlesswadi Vishrambag Sangli16CompletedOct 2017Jun 2017
HariharS. No. 133-2 Plot No.37 Government Colony Sangli6CompletedJul 2014Mar 2014
HaripriyaC.S. No. 6555-33 Near Arwade Park Opposite Sangli Railway Station Sangli10CompletedJul 2013Jun 2013

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep HARI-OM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wanlesswadi790+ in Sangli

2 kmHARI-OMCompleted 52Lapsed / revoked 17Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: PRAJ Developers

PRAJ DEVELOPERS has 2 registrations on MahaRERA, including GURU PRAJAKTA and HARI-OM. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if HARI-OM is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI-OM?

The registered promoter entity is PRAJ Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI-OM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HARI-OM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI-OM?

The professionals named in the filing: Architect: Ar Ambernath M Shinde; Engineer: Samir Najir Bargir; Chartered Accountant: Aditya Lahoti. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI-OM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI-OM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI-OM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.