Home / Browse projects / Raigarh, Maharashtra / HARI OM BHAKTI

Registered No litigation declared Residential / Group Housing project

HARI OM BHAKTI

By BHAKTI ENTERPRISES

RG-MH-17685 · RERA P52000056312 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Internal walls, 60%
45 of 58Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

HARI OM BHAKTI is a Residential / Group Housing project by BHAKTI ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000056312 on 25 May 2024. Possession is promised by 31 Dec 2028. 13 of the 58 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHARI OM BHAKTI
  • TypeResidential / Group Housing
  • Location
    • SECTOR-18
    • NAVI MUMBAI
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000056312
  • ReraGenie IDRG-MH-17685

Builder

  • NameBHAKTI ENTERPRISES
  • Entity typePartnership
  • PartnersVALJI LADHA RAVAT, JETHA KARAMSHI BERA, JAGDISH ODHAVJI THAKKAR, CHANDULAL NAVJIBHAI PATEL
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

22%13 of 58 units booked
35.1%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HARI OM BHAKTINA131258058

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

HARI OM BHAKTI: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area950 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 May 2025
LandownerVillageDistrict
HARI OM ENTERPRISESUlaweRaigarh

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI4171.15
Proposed, not sanctioned4,171 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop no-11 and 12, Prathmesh Pride,Plot no-6, sector no-19,Ulwe, Navi Mumbai
Estimated costRs 16.02 cr
Cost incurredRs 5.62 cr
Work done35.08%
BuildingWingEstimatedIncurred
HARI OM BHAKTINARs 13.40 crRs 5.53 cr
-NARs 2.62 crRs 9.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESTINATION ARCHITECTURE INTERIOR DESIGNS AMITKUMAR PATEL
EngineerSTRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED
Chartered AccountantR B SINGH & ASSOCIATES
Chartered AccountantASHOK T UPADHYE
PartnerRole in project
BHAKTI ENTERPRISES-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12400947Shobha Hiraman NaikBHAKTI ENTERPRISES30/11/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MAR26.pdf12 May 2026
Withdrawal Update Form 2File: FORM 2 MAR 26.pdf12 May 2026
Withdrawal Update Form 3File: Form3- Q4.pdf12 May 2026
Withdrawal Update Form 1File: FORM-1 DEC25.pdf4 Feb 2026
Withdrawal Update Form 2File: FORM-2 DEC 25.pdf4 Feb 2026
Withdrawal Update Form 3File: Form 3 - Q3.pdf4 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 FY 24-25 BHAKTI.pdf6 Dec 2025
Withdrawal Update Form 1File: FORM 1- Q2-SEP25.pdf12 Nov 2025
Withdrawal Update Form 2File: FORM 2- Q2-SEP25.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 - Q2_11zon.pdf12 Nov 2025
Withdrawal Update Form 1File: Form 1-Q1-JUNE 25.pdf25 Jul 2025
Withdrawal Update Form 2File: Form 2 - june 25.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3 - Q1 - Bhakti Enterprises - Signed.pdf25 Jul 2025
Form 1File: FORM-1 JUNE.pdf29 May 2025
Form 2File: FORM-2 JUNE.pdf29 May 2025
Form 3File: FORM-3 JULY_11zon (1).pdf29 May 2025
Form 1File: Form 1 Signature Sep 24.pdf29 May 2025
Form 2File: Form 2 sep.pdf29 May 2025
Form 3File: FORM-3 SEPT_11zon (1).pdf29 May 2025
Form 1File: Form 1 December.pdf29 May 2025
Form 2File: form 2 Dec 24 11B.pdf29 May 2025
Form 3File: FORM 3 DEC 24 11B_11zon (1).pdf29 May 2025
Form 1File: FORM 1 11B MARCH 25.pdf29 May 2025
Form 2File: FORM 2 MARCH 25.pdf29 May 2025
Form 3File: FORM-3 MARCH_11zon.pdf29 May 2025
Withdrawal Update Form 1File: FORM 1 11B MARCH 25.pdf29 May 2025
Withdrawal Update Form 2File: FORM 2 MARCH 25.pdf29 May 2025
Withdrawal Update Form 3File: FORM-3 MARCH_11zon.pdf29 May 2025
FORM 1 11B MARCH 2529 Apr 2025
FORM 2 MARCH 2529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 24 11B_11zon.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 24 11B.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 JULY_11zon.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 SEPT_11zon.pdf2 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: FORM-3 SEPT_11zon.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signature Sep 24.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 JUNE.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signature Sep 24.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 JUNE.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEWW_11zon.pdf21 May 2024
Other - TechnicalFile: Declaration cum undertaking promoter.pdf6 Apr 2024
CERSAI detailsFile: No security int chg on project--revised.pdf18 Mar 2024
Proforma of Agreement for saleFile: Agreement for sale revised.pdf18 Mar 2024
Other - LegalFile: AGREEMENT TO LEASE.pdf11 Mar 2024
Layout approvalFile: AMENDED CC DWG_NEW.pdf24 Feb 2024
Building plan approvalFile: 09 AMENDED CC DWG-compressed.pdf24 Feb 2024
Copy of Layout Approval (in case of layout)File: AMENDED CC DWG_NEW.pdf24 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 09 AMENDED CC DWG-compressed.pdf24 Feb 2024
Deviation Report with respect to Allotment letterFile: 33 Devation Letter for Allotment- HARI OM BHAKTI.pdf22 Feb 2024
Deviation Report with respect to model copy of AgreementFile: 31 Devation Letter for Agreement- HARI OM BHAKTI.pdf22 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 38 Disclosure of interest chandu bhai.pdf21 Feb 2024
Copy of the legal title reportFile: Legal Title Report.pdf10 Feb 2024
PAN CardFile: BHAKTI ENT_PAN CARD_COM.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: 18 Decleartion financial encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: 17 Declarationi of legal encumbrances.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 18 Decleartion financial encumbrance.pdf7 Feb 2024
Details of encumbrances concerned to LegalFile: 17 Declarationi of legal encumbrances.pdf7 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 01 AMENDED CC COPY.pdf7 Feb 2024
Declaration about Commencement CertificateFile: 22 Form D cc Bhakti ent.pdf7 Feb 2024
Declaration in FORM BFile: Form B Bhakti Ent (1)_11zon.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arctiect form sign jk.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 ENGINEER'S CERTIFICATE_11zon.pdf7 Feb 2024
CERSAI detailsFile: CERSAI_Search_Report_200296063833_For_Asset_Based_Search_07_02_2024_12_46_53_007.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 38 Disclosure of interest jagdish.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 38 Disclosure of interest vr.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 38 Disclosure of intrest VG.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 38 Disclosure of interest of jk.pdf7 Feb 2024
Proforma of Allotment letterFile: PERFORMA Allotment Letter.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about bank account.pdf7 Feb 2024

How this compares with Raigarh

22%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HARI OM BHAKTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

Builder: BHAKTI ENTERPRISES

BHAKTI ENTERPRISES has 3 registrations on MahaRERA, including HARI SAGAR and BHAKTI AURA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if HARI OM BHAKTI is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI OM BHAKTI?

The registered promoter entity is BHAKTI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI OM BHAKTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against HARI OM BHAKTI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for HARI OM BHAKTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI OM BHAKTI?

The professionals named in the filing: Architect: DESTINATION ARCHITECTURE INTERIOR DESIGNS AMITKUMAR PATEL; Engineer: STRUCTURAL CONCEPT DESIGNS PRIVATE LIMITED; Chartered Accountant: R B SINGH & ASSOCIATES; Chartered Accountant: ASHOK T UPADHYE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI OM BHAKTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI OM BHAKTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI OM BHAKTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.