Home / Browse projects / Aurangabad, Maharashtra / HAPPY CITY PHASE THREE

Registered No litigation declared Residential / Group Housing project

HAPPY CITY PHASE THREE

By SHANTAMA BUILD TEC

RG-MH-50529 · RERA PR1043032501926 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 3.31 crore secured on the land, in favour of SHREE GANESH URBAN COOPERATIVE SOCIETY LIMITED
  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
8 of 27Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 75%
15 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 11 documents Report an error

HAPPY CITY PHASE THREE is a Residential / Group Housing project by SHANTAMA BUILD TEC in Aurangabad, Maharashtra, registered with MahaRERA as PR1043032501926 on 29 Dec 2025. Possession is promised by 31 Dec 2030. 17 of the 32 units on this registration are recorded sold or booked, and 8 of 27 construction stages are filed complete.

At a glance

Project

  • NameHAPPY CITY PHASE THREE
  • TypeResidential / Group Housing
  • Location
    • PATODA ROAD
    • GEVRAI PAITHAN ROAD
    • Georai
    • Aurangabad
    • 431105
  • Pincode431105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1043032501926
  • ReraGenie IDRG-MH-50529

Builder

  • NameSHANTAMA BUILD TEC
  • Entity typePartnership
  • PartnerAnkit Agrawal
  • Partner And Authorised SignatoryANIL RATANLAL AGRAWAL
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Dec 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed11 files

Current status

53%17 of 32 units booked
44.1%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B5NA2212012
B6NA2212012
A1NA32808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 27 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

B542%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B642%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A129%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor60%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo80%
Water SupplyNo55%
Sewerage (Chamber, Lines, Septic Tank , STP)No30%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNo30%
Street LightingNo30%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo10%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Stilt / Ground48
BuildingStilt / GroundTotal
B51818
B61818
A11212

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area15,197 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSHREE GANESH URBAN COOPERATIVE SOCIETY LIMITED
Secured amountRs 3.31 crore
CERSAI search filedYes
Declared on19 Dec 2025

Approvals and building plan

Sanctioning authorityChhatrapati Sambhajinagar Metropolitan Region Development Authority, Chhatrapati Sambhajinagar
Permissible FSI1882.13
Proposed, not sanctioned1,882 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT 323/324,N.3-CIDCO,AURANGABAD 431003
Estimated costRs 3.22 cr
Cost incurredRs 1.42 cr
Work done44.13%
BuildingWingEstimatedIncurred
B5NARs 1.11 crRs 61.31 lakh
B6NARs 1.11 crRs 61.31 lakh
A1NARs 82.94 lakhRs 16.59 lakh
-NARs 16.10 lakhRs 2.90 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAMOL KSHIRSAGAR
EngineerAMOL KSHIRSAGAR
EngineerRajendra Jadhav
Chartered AccountantBKPS and Associates
PartnerRole in project
SHANTAMA BUILD TEC-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed11

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate happy 3.pdf21 May 2026
Withdrawal Update Form 2File: Engineer certificate.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 with declaration.pdf21 May 2026
Withdrawal Update Form 1File: 1 FORM-1 DEC 25.pdf16 Jan 2026
Withdrawal Update Form 2File: 2 FORM-2 DEC 25.pdf16 Jan 2026
Withdrawal Update Form 3File: 3 FORM-3 DEC 25.pdf16 Jan 2026
Layout approvalFile: Plan Copy.pdf6 Dec 2025
Building plan approvalFile: Plan Copy.pdf6 Dec 2025
Building plan approvalFile: happy city 251125.pdf3 Dec 2025
Layout approvalFile: Layout Marked with Unit Details.pdf21 Nov 2025
Declaration and undertaking (Annexure A)File: Annexure-A.pdf6 Nov 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
HAPPY CITYP51500031654GEVRAI, Aurangabad138Nov 2021Certificate SignedDec 2025Not delivered

How this compares with Aurangabad

53%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep HAPPY CITY PHASE THREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GEVRAI PAITHAN ROAD1,400+ in Aurangabad

2 kmHAPPY CITY PHASE THREELapsed / revoked 2Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: SHANTAMA BUILD TEC

SHANTAMA BUILD TEC has 4 registrations on MahaRERA, including HAPPY CITY and Aarambh Commercial Spaces. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if HAPPY CITY PHASE THREE is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HAPPY CITY PHASE THREE?

The registered promoter entity is SHANTAMA BUILD TEC, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HAPPY CITY PHASE THREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HAPPY CITY PHASE THREE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HAPPY CITY PHASE THREE?

The professionals named in the filing: Architect: AMOL KSHIRSAGAR; Engineer: AMOL KSHIRSAGAR; Engineer: Rajendra Jadhav; Chartered Accountant: BKPS and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HAPPY CITY PHASE THREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HAPPY CITY PHASE THREE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HAPPY CITY PHASE THREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.