Home / Browse projects / Mumbai Suburban, Maharashtra / HANUMAN NAGAR AZAD NAGAR SRA CHS

Registered Litigation declared Residential / Group Housing project

HANUMAN NAGAR AZAD NAGAR SRA CHS

By PRATHA CONSTRUCTIONS

RG-MH-18194 · RERA P51800077345 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 10%
222 of 250Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

HANUMAN NAGAR AZAD NAGAR SRA CHS is a Residential / Group Housing project by PRATHA CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077345 on 9 Aug 2024. Possession is promised by 31 Dec 2029. 28 of the 250 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameHANUMAN NAGAR AZAD NAGAR SRA CHS
  • TypeResidential / Group Housing
  • Location
    • Cama Industrial Estate
    • Walbhat Road
    • Goregoan East
    • Mumbai
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400063
  • Pincode400063
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800077345
  • ReraGenie IDRG-MH-18194

Builder

  • NamePRATHA CONSTRUCTIONS
  • Entity typePartnership
  • PartnersShidoji Lala Shinde, Prabhakar Mahabala Shetty

Key dates

this monthRegisteredAug 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Current status

11%28 of 250 units booked
9.5%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WingNA35332500250

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 10%.

B Wing: 11% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed277

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots277
Closed/Covered277

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,192 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY ( SRA )
Permissible FSI18454.66
Proposed, not sanctioned15,569 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRoyal Accord Iv, 120 Feet Road, Lokhandwala Complex, Andheri West, Mumbai, 400 053
Estimated costRs 105.29 cr
Cost incurredRs 9.99 cr
Work done9.49%
BuildingWingEstimatedIncurred
B WingNARs 102.79 crRs 9.99 cr
-NARs 2.50 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPECTRUM DESIGN GROUP
ArchitectAakruti Architects & Consultants
ArchitectSGA ASSOCIATES
ArchitectSHUBHAM SAWANT ARCHITECT & CONSULTANTS
EngineerPLUTONIUM CONSULTANCY
EngineerPRAVIN GALA CONSULTANT PVT LTD
EngineerCreative Consultants
Chartered AccountantJ Manoj & Associates
Chartered AccountantKAMB AND ASSOCIATES
PartnerRole in project
PRATHA CONSTRUCTIONS-

Litigation declared1

CaseCourtStatus
WPL/23019/2023Bombay High CourtClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Pratha Hanuman Nagar 31-03-2026.pdf18 May 2026
Withdrawal Update Form 2File: Form-2- Engineer certificate 31-03-26-Cama project.pdf18 May 2026
Withdrawal Update Form 3File: Form No-3-31-03-26- Hanuman Nagar azad nagar chs--.pdf18 May 2026
Withdrawal Update Form 1File: Form-1 Pratha Hanuman Nagar 30-06-2025.pdf9 Apr 2026
Withdrawal Update Form 1File: Form-1 Pratha Hanuman Nagar 30-09-2025.pdf9 Apr 2026
Withdrawal Update Form 1File: Form-1 Pratha Hanuman Nagar 31-12-2025.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2- Hanuman Nagar Azad Nagar CHS-30-06-25.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2- Hanuman Nagar Azad Nagar CHS-30-09-25.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2- Pratha 31-12-25.pdf9 Apr 2026
Withdrawal Update Form 3File: Form-3 Hanuman Nagar azad nagar 30-06-2025_compressed.pdf9 Apr 2026
Withdrawal Update Form 3File: Form-3 Hanuman Nagar Azad 30-09-2025_compressed.pdf9 Apr 2026
Withdrawal Update Form 3File: Form-3 Pratha 31-12-2025_compressed.pdf9 Apr 2026
Form 1File: form 1 MARCH 25.pdf3 Apr 2026
Form 2File: Form 2- Hanuman Nagar Azad Nagar 31-03-2025.pdf3 Apr 2026
Form 3File: Form-3 Cama 31-03-25_compressed.pdf3 Apr 2026
OthersFile: Draft AFS.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosures Pratha-31-03-2025-.pdf3 Apr 2026
Form 5 (FY 2024-2025)File: Form5_HanumanNagar_Azadnagar_310325.pdf6 Oct 2025
Form 1File: Form 1 Cama (Sept24)_compressed.pdf2 Sep 2025
Form 2File: Form 2 Cama (Sept24).pdf2 Sep 2025
Form 3File: Form 3 Cama Sep 24_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Pratha-30-09-2024_compressed.pdf2 Sep 2025
Form 1File: Form-1 (Cama (Dec24).pdf2 Sep 2025
Form 2File: Form-2 Cama (Dec24).pdf2 Sep 2025
Form 3File: Form-3 Cama ( Dec24)_compressed.pdf2 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosures Pratha-31-12-2024_compressed.pdf2 Sep 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert Cama Project JUL to SEPT 2024.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hanuman Nagar Azad Nagar SRA CHS JUL to SEPT 2024.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cama Project Form 1 for July to September 2024.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cama Project Form 1 for July to September 2024.pdf18 Nov 2024
Building plan approvalFile: Drawing 1 IOA Final.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0002.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0003.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0004.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0005.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0006.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0007.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0008.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0009.pdf3 Aug 2024
Building plan approvalFile: MYSCAN_20240725_0010.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing 1 IOA Final.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0002.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0003.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0004.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0005.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0006.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0007.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0008.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0009.pdf3 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20240725_0010.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CAMA Project Goregoan Revised.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE FORM 1 CAMA Project.pdf2 Jul 2024
Details of encumbrances concerned to FinanceFile: Legal and Finance Encumbrances Certificate.pdf25 Jun 2024
Details of encumbrances concerned to FinanceFile: Legal and Finance Encumbrances Certificate.pdf25 Jun 2024
Details of encumbrances concerned to LegalFile: Legal and Finance Encumbrances Certificate.pdf25 Jun 2024
Details of encumbrances concerned to LegalFile: Legal and Finance Encumbrances Certificate.pdf25 Jun 2024
Declaration about Commencement CertificateFile: 9 Declaration about Commencement Certificate Revised.pdf25 Jun 2024
Copy of the legal title reportFile: pahadi goregaon KJP 28th June 2018.pdf30 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate (CAMA PROJECT).pdf28 May 2024
Other - TechnicalFile: 19 No Pendency of registration Declaration cum Undertaking CAMA Project.pdf10 May 2024
Layout approvalFile: Pratha Construction Revsied LOI.pdf9 May 2024
Layout approvalFile: Amended Letter 30 April 2024.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: Pratha Construction Revsied LOI.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: Amended Letter 30 April 2024.pdf9 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Pratha Construction Revsied CC.pdf9 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 Disclosure of Interest in Other Real Estate Organizations CAMA shidoji.pdf4 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13A Disclosure of Interest in Other Real Estate Organizations CAMA prabhakar.pdf4 May 2024
Copy of the legal title reportFile: 3 Legal Title Report CAMA Goregoan Project.pdf30 Apr 2024
Copy of the legal title reportFile: pahadi goregaon 7-12 .pdf30 Apr 2024
PAN CardFile: 1 PAN Pratha Constructions.pdf22 Apr 2024
PAN CardFile: 2 PAN Shidoji Shinde.pdf22 Apr 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Finance and Legal.pdf22 Apr 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Finance and Legal.pdf22 Apr 2024
Declaration in FORM BFile: 10 Form B Affidavit cum Declaration Pratha Constructions_compressed.pdf22 Apr 2024
CERSAI detailsFile: 11 CERSAI_Search_Report CAMA.pdf22 Apr 2024
Proforma of Agreement for saleFile: 14 Proforma of Agreement for sale CAMA.pdf22 Apr 2024
Proforma of Allotment letterFile: 15 Proforma of Allotment Letter CAMA.pdf22 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 16 Declaration about Separate Bank Account for REal Estate Projects CAMA.pdf22 Apr 2024
Deviation Report with respect to Allotment letterFile: 18 Deviation Report for Allotment Letter CAMA.pdf22 Apr 2024
Deviation Report with respect to model copy of AgreementFile: 17 Deviation Report for Agreement for Sale CAMA.pdf22 Apr 2024

How this compares with Mumbai Suburban

11%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HANUMAN NAGAR AZAD NAGAR SRA CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregoan East, Mumbai6,700+ in Mumbai Suburban

2 kmHANUMAN NAGAR AZAD NAGARCompleted 131Lapsed / revoked 62Other 122Dot size: filed unitsN

Filed coordinates, straight-line distance. 315 registered projects within 2 km.

Builder: PRATHA CONSTRUCTIONS

PRATHA CONSTRUCTIONS has 1 registration on MahaRERA, including HANUMAN NAGAR AZAD NAGAR SRA CHS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if HANUMAN NAGAR AZAD NAGAR SRA CHS is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HANUMAN NAGAR AZAD NAGAR SRA CHS?

The registered promoter entity is PRATHA CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HANUMAN NAGAR AZAD NAGAR SRA CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HANUMAN NAGAR AZAD NAGAR SRA CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HANUMAN NAGAR AZAD NAGAR SRA CHS?

The professionals named in the filing: Architect: SPECTRUM DESIGN GROUP; Architect: Aakruti Architects & Consultants; Architect: SGA ASSOCIATES; Architect: SHUBHAM SAWANT ARCHITECT & CONSULTANTS; Engineer: PLUTONIUM CONSULTANCY; Engineer: PRAVIN GALA CONSULTANT PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HANUMAN NAGAR AZAD NAGAR SRA CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HANUMAN NAGAR AZAD NAGAR SRA CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HANUMAN NAGAR AZAD NAGAR SRA CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.