HAMY PARK
RG-MH-24883 · RERA P52100008145 · Last updated on MahaRERA portal: 20 Mar 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 55 months past the filed date
- 3 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HAMY PARK is a Others project by HAMY CONSTRUCTION PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100008145 on 18 Aug 2017. Possession was promised by 30 Mar 2022 and is now 55 months past that date. 3 complaints are on record with the regulator.
At a glance
Project
- NameHAMY PARK
- TypeOthers
- Location
- Katraj
- Haveli
- Pune
- 411043
- Pincode411043
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100008145
- ReraGenie IDRG-MH-24883
Builder
- NameHAMY CONSTRUCTION PVT LTD
- Entity typeCompany
- Managing DirectorRAFIK SALEH MOHAMMAD JAFRANI
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on18 Aug 2017
- Promised completion30 Mar 2022
- Revised completionNone
- Buildings4 building records
- Documents filed30 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HAMY PARK - A | NA | 16 | 0 | 0 | 0 | 0 |
| HAMY PARK - B | NA | 16 | 0 | 0 | 0 | 0 |
| HAMY PARK - C | NA | 16 | 0 | 0 | 0 | 0 |
| HAMY PARK - D | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 20 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 90%.
HAMY PARK - A90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
HAMY PARK - B90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
HAMY PARK - C90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
HAMY PARK - D90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 20 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed89
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| HAMY PARK - A | 22 | 22 |
| HAMY PARK - B | 22 | 22 |
| HAMY PARK - C | 22 | 22 |
| HAMY PARK - D | 23 | 23 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JEEVAN JYOTI CONSTRUCTION PVT LTD | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIKAS M DHERE |
| Engineer | ARUN GOKHALE |
| Partner | Role in project |
|---|---|
| HAMY CONSTRUCTION PVT LTD | - |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000023402 | Raju Basappa Hegde and 1 ors | M/s Hamy Construction Pvt.Ltd through its directorsMr.Rafik salemohamed Jafrani & Mrs.Arfana Rafik J | 08/09/2019 |
| CC005000000085330 | RAMESH MEHTA | HAMY CONSTRUCTIONS PRIVATE LIMITED | 11/03/2021 |
| CC005000000116872 | Hamy Park Co-operative Housing Society Ltd (Proposed) | M/s. Hamy Construction Private Limited Through its Director 1 Rafik S Jafrani 2 Mrs Arfana R Jafrani | 30/03/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Jul 2021
Documents filed30
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: FORM 3 - 18 Hamy.pdf | 20 Mar 2023 |
| Certificates of CA (Form 3)File: FORM 3 - 19 Hamy.pdf | 20 Mar 2023 |
| Certificates of CA (Form 3)File: FORM 3 - 20 Hamy.pdf | 20 Mar 2023 |
| Certificates of CA (Form 3)File: FORM 3 - 21 Hamy.pdf | 20 Mar 2023 |
| Certificates of CA (Form 3)File: FORM 3 - 22 Hamy.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 - 1718 Hamy.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 - 1819 Hamy.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - 1920 Hamy.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - 2021 Hamy.pdf | 20 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - 2122 Hamy.pdf | 20 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Form 1 Architect's certificate .pdf | 9 Jul 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Hamy Park Shop Completion Certificate.pdf | 9 Jul 2021 |
| Building plan approvalFile: Temp00003.PDF | 4 Aug 2017 |
| Layout approvalFile: Temp00003.PDF | 4 Aug 2017 |
| PAN CardFile: HAMY CONSTRUCTION.pdf | 4 Aug 2017 |
| PAN CardFile: JEEVAN JYOTI pan card.pdf | 4 Aug 2017 |
| Copy of the legal title reportFile: 11.pdf | 4 Aug 2017 |
| Details of encumbrancesFile: FORM -B.pdf | 4 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: Temp00003.PDF | 4 Aug 2017 |
| Building Plan Approval (IOD)File: Temp00003.PDF | 4 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 123.pdf | 4 Aug 2017 |
| Declaration in FORM BFile: FORM -B.pdf | 4 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR 1.pdf | 4 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR 2.pdf | 4 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR 3.pdf | 4 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert.pdf | 4 Aug 2017 |
| Certificates of CA (Form 3)File: UNDERTAKING - CA.pdf | 4 Aug 2017 |
| Proforma of Allotment letterFile: 4 Allotment letter.pdf | 4 Aug 2017 |
| Proforma of Allotment letterFile: 1 sale aggrement.pdf | 4 Aug 2017 |
| OtherFile: 2 Devlopment aggrement.pdf | 4 Aug 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| FLOWER RESIDENCY | SNO.19 HISSA NO 1 TO 4A3 PLOT NO B KATRAJ PUNE | 15 | Completed | Dec 2016 | Oct 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 30 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HAMY PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Katraj13,700+ in Pune
Filed coordinates, straight-line distance. 173 registered projects within 2 km.
4 Taljai Hills Phase 1
Shri Taljai Mata Associates LLP
CHANDRANGAN REVANTA
CHANDRANGAN BUILDCON LLP
PANORA
OM SAI DEVELOPERS
KADAM HERITAGE SURVEY NO.4/7/1 AND 4/7/2
D & T PROPERTIES
TRIDENT
Shamraj Constructions
Bhargav Stella
Bhargav Shelters
Builder: HAMY CONSTRUCTION PVT LTD
HAMY CONSTRUCTION PVT LTD has 1 registration on MahaRERA, including HAMY PARK. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that HAMY PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HAMY PARK is delayed beyond 30 Mar 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HAMY PARK?
The registered promoter entity is HAMY CONSTRUCTION PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HAMY PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HAMY PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HAMY PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HAMY PARK?
The professionals named in the filing: Architect: VIKAS M DHERE; Engineer: ARUN GOKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HAMY PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback