Home / Browse projects / Raigarh, Maharashtra / GURUJI RESIDENCY

Registered No litigation declared Residential / Group Housing project

GURUJI RESIDENCY

By KISHAN RAJPAT MEDESIA

RG-MH-05294 · RERA P52000050544 · Last updated on MahaRERA portal: 26 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Stilt Floor, 95%
2 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

GURUJI RESIDENCY is a Residential / Group Housing project by KISHAN RAJPAT MEDESIA in Raigarh, Maharashtra, registered with MahaRERA as P52000050544 on 21 Apr 2023. Possession is promised by 31 Dec 2026. 0 of the 2 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameGURUJI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 288
    • SECTOR 24
    • PUSHPAK
    • ULWE
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000050544
  • ReraGenie IDRG-MH-05294

Builder

  • NameKISHAN RAJPAT MEDESIA
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

0%0 of 2 units booked

Figures as on 26 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GURUJI RESIDENCYNA33022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

GURUJI RESIDENCY: 47% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor95%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area700 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
NAMDEV R GAIKWAD AND 5 OTHERSNavi Mumbai (M Corp.)Thane
CHANDRABHAGA NAMDEV GAIKWADNavi Mumbai (M Corp.)Thane
NANDKUMAR NAMDEV GAIKWADNavi Mumbai (M Corp.)Thane
CHETAN NAMDEV GAIKWADNavi Mumbai (M Corp.)Thane
DEVKUBAI RAMCHANDRA GAIKWADNavi Mumbai (M Corp.)Thane
SIDDHARTH NAMDEV GAIKWADNavi Mumbai (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI1049.68
Proposed, not sanctioned1,050 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 8,9 AND 10, BHUMIRAJ RETREAT, SEC 14, SANPADA, 400705

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIL H SAKARIA
EngineerB S SUKTHANKAR AND ASSOCIATES
EngineerVIJAY KUMAR SINGH
EngineerSaqlain Shaikh
Chartered AccountantBHAVESH BHANUSHALI AND ASSOCIATES
Chartered AccountantHuzaifa S Sanawadwala
Chartered AccountantDanish Akbani
PartnerRole in project
KISHAN RAJPAT MEDESIA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 1File: Form 1.pdf26 Sep 2025
Form 2File: Form 2.pdf26 Sep 2025
Form 3File: Form 3.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Inventory.pdf26 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 2324.pdf26 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A 2425.pdf26 Sep 2025
Form 2A (FY 2025-2026)File: Form 2A 2526.pdf26 Sep 2025
Form 5 (FY 2023-2024)File: From 5 2324.pdf26 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 2425.pdf26 Sep 2025
Building plan approvalFile: APPROVED AMENDED CC PLAN.pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: APPROVED AMENDED CC PLAN.pdf4 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: APPROVED AMENDED CC.pdf4 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architechs Certificate.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed and Scanned.pdf6 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 Signed and Scanned.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guruji Residency form3 Q1 FY 2023-24 SIGNED SCAN.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guruji Residency form3 Q2 FY 2023-24 SIGNED SCAN.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guruji Residency form3 Q3 FY 2023-24 SIGNED SCAN.pdf1 Jun 2024
Declaration in FORM BFile: NAMDEV GAIKWAD fORM B.pdf20 Apr 2023
CERSAI detailsFile: CERSAI.pdf13 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations.pdf13 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow13 Apr 2023
Copy of the legal title reportFile: Legal Title Report Plot 288.pdf6 Apr 2023
Proforma of Allotment letterFile: Model Letter of Allotment - RERA.pdf4 Apr 2023
Proforma of Agreement for saleFile: AFS- DRAFT - model.pdf4 Apr 2023
Details of encumbrances concerned to FinanceFile: Guruji Residency Legal encumbrance.pdf28 Mar 2023
Details of encumbrances concerned to LegalFile: Guruji Residency Legal encumbrance.pdf28 Mar 2023
Layout approvalFile: Guruji Residency Layout plan cidco approved.pdf24 Mar 2023
Building plan approvalFile: Guruji Residency Layout plan cidco approved.pdf24 Mar 2023
PAN CardFile: Kishan Medesia KYC.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: Guruji Residency Financial encumbrance.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: Guruji Residency Legal encumbrance Certificate.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: Guruji Residency Financial encumbrance Certificate.pdf24 Mar 2023
Details of encumbrances concerned to LegalFile: Guruji Residency Financial encumbrance.pdf24 Mar 2023
Details of encumbrances concerned to LegalFile: Guruji Residency Legal encumbrance Certificate.pdf24 Mar 2023
Details of encumbrances concerned to LegalFile: Guruji Residency Financial encumbrance Certificate.pdf24 Mar 2023
Copy of Layout Approval (in case of layout)File: Guruji Residency Layout plan cidco approved.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Guruji Residency Layout plan cidco approved.pdf24 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Guruji Residency CC.pdf24 Mar 2023
Declaration about Commencement CertificateFile: Guruji Residency Format D.pdf24 Mar 2023
Declaration in FORM BFile: KISHAN MEDESIA fORM B.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Guruji Residency Architect cert form 1.pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Guruji Residency engineers certificate form 2.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Guruji Residency RERA Form 3 final.pdf24 Mar 2023
Deviation Report with respect to Allotment letterFile: Guruji Residency model allottment deviation report declaration.pdf24 Mar 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GURUJI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK, ULWE5,900+ in Raigarh

2 kmGURUJI RESIDENCYCompleted 69Lapsed / revoked 10Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 152 registered projects within 2 km.

Builder: KISHAN RAJPAT MEDESIA

KISHAN RAJPAT MEDESIA has 1 registration on MahaRERA, including GURUJI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GURUJI RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GURUJI RESIDENCY?

The registered promoter entity is KISHAN RAJPAT MEDESIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GURUJI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GURUJI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GURUJI RESIDENCY?

The professionals named in the filing: Architect: ANIL H SAKARIA; Engineer: B S SUKTHANKAR AND ASSOCIATES; Engineer: VIJAY KUMAR SINGH; Engineer: Saqlain Shaikh; Chartered Accountant: BHAVESH BHANUSHALI AND ASSOCIATES; Chartered Accountant: Huzaifa S Sanawadwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GURUJI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GURUJI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GURUJI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.