Home / Browse projects / Pune, Maharashtra / GURMEHARS Silver and Devi Co-operative housing society
GURMEHARS Silver and Devi Co-operative housing society
RG-MH-31239 · RERA P52100079573 · Last updated on MahaRERA portal: 26 May 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GURMEHARS Silver and Devi Co-operative housing society is a Residential / Group Housing project by GURMEHAR CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100079573 on 17 Mar 2025. The registration is recorded completed; possession was promised by 30 Jun 2026. 0 of the 42 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameGURMEHARS Silver and Devi Co-operative housing society
- TypeResidential / Group Housing
- Location
- PIMPRI COLONY
- SADHU WASWANI GARDEN
- PIMPRI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411017
- Pincode411017
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100079573
- ReraGenie IDRG-MH-31239
Builder
- NameGURMEHAR CONSTRUCTIONS
- Entity typePartnership
- Authorised PartnerSanjay Hiranand Nagdev
- PartnersKailash Tindumal Kukreja, Ramchand Rupchand Duseja, Murli Navalmal Sukheja
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Mar 2025
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings2 building records
- Documents filed70 files
Current status
Figures as on 26 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING 1 | NA | 8 | 7 | 21 | 0 | 21 |
| WING 2 | NA | 8 | 7 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
WING 182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING 282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed85
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING 1 | 43 | 43 |
| WING 2 | 42 | 42 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SILVER C0-OP HOUSING SOCIETY | Pimpri Chinchawad (M Corp.) | Pune |
| DEVI CO-OP HOUSING SOCIETY | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING 1 | NA | Rs 5.00 cr | Rs 4.04 cr |
| WING 2 | NA | Rs 5.00 cr | Rs 4.04 cr |
| - | NA | Rs 1.77 cr | Rs 1.09 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | OPTIMA ARCHITECTS & ENGINEERS |
| Engineer | OPTIMA ARCHITECTS & ENGINEERS |
| Chartered Accountant | VMN & CO |
| Chartered Accountant | A N J K & CO LLP |
| Chartered Accountant | RV Nevatia & Co |
| Partner | Role in project |
|---|---|
| GURMEHAR CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Mar 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Withdrawal Application Form1.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2.pdf | 26 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 26 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate.pdf | 26 May 2026 |
| Occupational CertificateFile: Full Occupancy Certificate.pdf | 26 May 2026 |
| Layout approvalFile: Layout Approval.pdf | 27 Mar 2026 |
| Building plan approvalFile: Building Plan 1.pdf | 27 Mar 2026 |
| Building plan approvalFile: Building Plan 2.pdf | 27 Mar 2026 |
| Building plan approvalFile: Building Plan 3.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form 1.pdf | 6 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form 2.pdf | 6 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form 3.pdf | 6 Feb 2026 |
| Form 1File: Form 1 Architect Certificate.pdf | 31 Dec 2025 |
| Form 2File: Form 2 Engineer Certificate.pdf | 31 Dec 2025 |
| Form 3File: Form 3 CA Certificate.pdf | 31 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate.pdf | 31 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 CA Certificate.pdf | 31 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate.pdf | 31 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 RERA Audit Report.pdf | 17 Nov 2025 |
| Other - TechnicalFile: CC Verification Mail.pdf | 4 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Declaration for secured unsecured loans.pdf | 3 Feb 2025 |
| Other - LegalFile: Authority Letter.pdf | 3 Feb 2025 |
| Other - FinanceFile: End Use Certificate - Silver.pdf | 3 Feb 2025 |
| Other - FinanceFile: End Use Certificate - Devi.pdf | 3 Feb 2025 |
| Other - TechnicalFile: DP Remarks Declaration.pdf | 3 Feb 2025 |
| CERSAI detailsFile: Cersai Declaration .pdf | 1 Feb 2025 |
| Other - FinanceFile: Declaration of NIL Land Cost for Redevelopment of Project.pdf | 1 Feb 2025 |
| Other - TechnicalFile: Declaration cum Undertaking for Multiple Registration of same project.pdf | 1 Feb 2025 |
| Copy of the legal title reportFile: 1 Copy of the legal title report.pdf | 31 Oct 2024 |
| Proforma of Allotment letterFile: Allotment Letter Final.pdf | 26 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Declaration Format B for Bank.pdf | 25 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: NO LEGAL ENCUMBRANCE.PDF | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 22 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration Format A for Promoter.pdf | 22 Oct 2024 |
| Details of encumbrances concerned to LegalFile: NO LEGAL ENCUMBRANCE.PDF | 22 Oct 2024 |
| Declaration about Commencement CertificateFile: FORMAT D - GURMEHAR.pdf | 7 Oct 2024 |
| Proforma of Agreement for saleFile: Agreement Draft_Gurmeher Devi and Silver Residency.pdf | 16 Aug 2024 |
| Deviation Report with respect to Allotment letterFile: Allotment letter Deviation Report.pdf | 15 Aug 2024 |
| Deviation Report with respect to model copy of AgreementFile: Agreement deviation report .pdf | 15 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: KAILASH DISCLOUSURE OF INTERESTS IN ANY OTHER REAL ESTATE ORGANIZATION.PDF | 15 Aug 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for secured_unsecured finance availed for the project.pdf | 15 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE FINANCE.PDF | 5 Aug 2024 |
| Declaration about Commencement CertificateFile: CC DECLARATION.PDF | 5 Aug 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE FINANCE.PDF | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RAMCHAND ANNEXURE GURMEHAR CONSTRUCTIONS.pdf | 5 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A MURLI SUKHEJA.PDF | 5 Aug 2024 |
| Declaration in FORM BFile: declartaion form b_compressed.pdf | 4 Jul 2024 |
| CERSAI detailsFile: Assets Based Search Report.pdf | 2 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 26 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 26 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOUSURE OF INTRESTS IN ANY OTHER REAL ESTATE .pdf | 26 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Comisement_compressed.pdf | 19 Jun 2024 |
| Layout approvalFile: Sanction Plan 1.pdf | 18 Jun 2024 |
| Building plan approvalFile: Sanction Plan 2.pdf | 18 Jun 2024 |
| Building plan approvalFile: Sanction Plan 3.pdf | 18 Jun 2024 |
| PAN CardFile: Pan Card Gurmehar Constructions.pdf | 18 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Sanction Plan 1.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 2.pdf | 18 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan 3.pdf | 18 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
Keep GURMEHARS Silver and Devi Co-operative housi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SADHU WASWANI GARDEN , PIMPRI13,700+ in Pune
Filed coordinates, straight-line distance. 247 registered projects within 2 km.
VARDHAMAN SKYTOWN
VARDHAMAN ASSOCIATES
Tamara
Goldfinger Kataria Urban Developments
Sindhu Skies
G K Wonders
Legacy Kairos A and B Building
Legacy Lifespaces LLP
Amberwood Phase 1
SMP NAMRATA ASSOCIATES
121 Paradise Phase I
Wamanbhau & Daga Realtors LLP
Builder: GURMEHAR CONSTRUCTIONS
GURMEHAR CONSTRUCTIONS has 1 registration on MahaRERA, including GURMEHARS Silver and Devi Co-operative housing society. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GURMEHARS Silver and Devi Co-operative housing society is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GURMEHARS Silver and Devi Co-operative housing society?
The registered promoter entity is GURMEHAR CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GURMEHARS Silver and Devi Co-operative housing society?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GURMEHARS Silver and Devi Co-operative housing society?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GURMEHARS Silver and Devi Co-operative housing society?
The professionals named in the filing: Architect: OPTIMA ARCHITECTS & ENGINEERS; Engineer: OPTIMA ARCHITECTS & ENGINEERS; Chartered Accountant: VMN & CO; Chartered Accountant: A N J K & CO LLP; Chartered Accountant: RV Nevatia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GURMEHARS Silver and Devi Co-operative housing society?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.