Home / Browse projects / Mumbai Suburban, Maharashtra / GULRAJ PARADISE

Registered No litigation declared Others project

GULRAJ PARADISE

By M/S RELIABLE CONSTRUCTION

RG-MH-25439 · RERA P51800004371 · Last updated on MahaRERA portal: 16 Jan 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • 15 complaints at MahaRERA
  • Completion date moved by 63 months
  • 5 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 92%
11 of 35Units unsoldnot recorded sold or booked
15Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

GULRAJ PARADISE is a Others project by M/S RELIABLE CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004371 on 9 Aug 2017. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 63 months from the original filing. 24 of the 35 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete. 15 complaints are on record with the regulator.

At a glance

Project

  • NameGULRAJ PARADISE
  • TypeOthers
  • Location
    • MATUNGA
    • Kurla
    • Mumbai Suburban
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004371
  • ReraGenie IDRG-MH-25439

Builder

  • NameM/S RELIABLE CONSTRUCTION
  • Entity typePartnership
  • PartnerTARANATH MAHALINGA SHETTY

Key dates

1 months past promisethis monthRegisteredAug 2017First promiseJun 2021Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed143 files

Current status

69%24 of 35 units booked
60.6%Work done, per cost certificate

Figures as on 16 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULRAJ PARADISE WING A B C D - SALENA252416016
RATNAMAL TOWERNA171711819

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 92%.

GULRAJ PARADISE WING A B C D - SALE52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises91%
Sanitary Fittings within the flats / premises43%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RATNAMAL TOWER52%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises91%
Sanitary Fittings within the flats / premises43%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks91%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered18
Open Space15
BuildingClosed/CoveredOpen SpaceTotal
GULRAJ PARADISE WING A B C D - SALE11516
RATNAMAL TOWER17017

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,693 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jan 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI22367.16
Proposed, not sanctioned22,166 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAMDEVI
Estimated costRs 104.32 cr
Cost incurredRs 63.22 cr
Work done60.6%
BuildingWingEstimatedIncurred
GULRAJ PARADISE WING A B C D - SALENARs 63.62 crRs 35.10 cr
RATNAMAL TOWERNARs 40.21 crRs 28.12 cr
-NARs 50.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATHARVA CONSULTANTS
EngineerHanware Consultants
Chartered AccountantA.K MANTRI & ASSOCIATES
PartnerRole in project
M/S RELIABLE CONSTRUCTION-

Extensions applied for5

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800018366Jun 2021 → Sep 2024

Reason as filed by the promoterDUE TO COVID 19 NOT ABLE TO COMPELTION PROJECT PLEASE GRANT US EXTENSION TILL 30/09/2024

EXT51800008692Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO VERY SLUGGISH REAL ESTATE MARKET AND VERY POOR SALE OF FLATS AND EXTREMELY POOR FUND FLOW OF PROJECT, WE WOULD NOT BE ABLE TO COMPLETE THE PROJECT IN TIME. THEREFORE WE WOULD LIKE TO REQUEST YOU TO PLEASE GRANT US EXTENSION FOR FURTHER 12 MONTHS.

EXT51800013484Jun 2021 → Dec 2023

Reason as filed by the promoterDUE TO VERY SLUGGISH REAL ESTATE MARKET AND VERY POOR SALE OF FLATS AND EXTREMELY POOR FUND FLOW OF PROJECT, WE WOULD NOT BE ABLE TO COMPLETE THE PROJECT IN TIME. THEREFORE WE WOULD LIKE TO REQUEST YOU TO PLEASE GRANT US EXTENSION FOR FURTHER TILL 31/12/2023

EXT51800028385Jun 2021 → Sep 2025

Reason as filed by the promoterDue to shortage of material and labor we are not able to complete project please grant us extension till 30/09/2025

EA09012619380Jun 2021 → Sep 2026

Reason as filed by the promoterDue to shortage of raw material and labour there was delay in project completion. The payments from allottees were irregular due to which the cash flow was affected which in turn resulted in delay of the project. There were issues whereby the slum tenant restricted us from entering the site and completing the project on time. Due to the above mentioned reasons there was delay in project completion

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC006000000303355RAMESH PRABHAKAR PADALARELIABLE CONSTRUCTION17/11/2022
CC006000000303358MAHESH PALAKURTHIRELIABLE CONSTRUCTION17/11/2022
CC006000000303424Shailendra Vishweshwar MandaokarReliable Construction24/05/2023
CC006000000303595Valerian Francis PereiraM/S RELIABLE CONSTRUCTION22/12/2022
CC006000000408549Anand Francis FernandesM/s Reliable Construction partnership firm through partner Mr Sadanand Shetty19/12/2023
CC006000000408629AMOL PRAKASH MOREM/S.RELIABLE CONSTRUCTION THROUGH MR. SADANAND RAJU SHETTY31/12/2023
CC006000000429478SANDESH MOHAN KADM/s. Reliable Construction01/03/2024
CC006000000591018Murugan Subramaniam PillaiM/s Reliable Construction05/07/2024
CC12400707pallavi mayuresh kokateM/S RELIABLE CONSTRUCTION08/11/2024
CC12501108Tushar Nilkanth MaindM/S RELIABLE CONSTRUCTION02/04/2025
CC12504712Mrs Swetalana Anand FernandesM/S RELIABLE CONSTRUCTION31/12/2025
CC12601383Shailendra Vishweshwar MandaokarM/S RELIABLE CONSTRUCTION12/03/2026
CC12602033AMOL PRAKASH MOREM/S RELIABLE CONSTRUCTION06/04/2026
CC12602067ABHAY ASHOK TAMBEM/S RELIABLE CONSTRUCTION08/04/2026
CC12602080RAMESH PADALAM/S RELIABLE CONSTRUCTION09/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Sep 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Sep 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf16 Jan 2026
Withdrawal Update Form 2File: form 2.pdf16 Jan 2026
Withdrawal Update Form 3File: form 3.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1.pdf9 Jan 2026
Withdrawal Update Form 1File: form 1.pdf9 Jan 2026
Withdrawal Update Form 2File: form 2.pdf9 Jan 2026
Withdrawal Update Form 2File: form 2.pdf9 Jan 2026
Withdrawal Update Form 3File: RC CA Certificate 30-06-2025.pdf9 Jan 2026
Withdrawal Update Form 3File: form 3.pdf9 Jan 2026
Declaration in FORM BFile: Form B Gulraj Paradise.pdf28 Jul 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf28 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 25.pdf23 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 MARCH-2025.pdf23 Jun 2025
CERSAI detailsFile: Cersai Declaration Letter Matunga RC Gulraj Paradise.pdf23 Jun 2025
Certificates of CA (Form 3)File: Form 3 Jan 2024 to March 2024 (1).pdf13 May 2025
Certificates of CA (Form 3)File: Form 3 April 2024 to June 2024 (1).pdf13 May 2025
Certificates of CA (Form 3)File: Form 3 July 2024 to Sept 2024 (1).pdf13 May 2025
Certificates of CA (Form 3)File: Form 3 Oct 2024 to Dec 2024 (1).pdf13 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Jan 2024 To March 2024.pdf28 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 April 2024 To June 2024.pdf28 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 July 2024 To Sept 2024.pdf28 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Oct 2024 To Dec 2024.pdf28 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Jan 2024 To March 2024.pdf28 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 April 2024 To June 2024.pdf28 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 July 2024 To Sept 2024.pdf28 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Oct 2024 To Dec 2024.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf28 Apr 2025
Declaration about Commencement CertificateFile: Format D.pdf8 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf10 Jul 2024
Certificates of CA (Form 3)File: form 3.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: RC Matunga form 2A Engineer Certificate March 2020.pdf3 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Inventory Gurlaj Paradise.pdf3 Jan 2024
Declaration in FORM BFile: FORM B.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A RC 31sr March 2022.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A RC 31st March 2023.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 GULRAJ PARADISE.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf20 Oct 2023
Certificates of CA (Form 3)File: FORM 3.pdf20 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT TO DEC 22.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JAN TO MARCH 23.pdf25 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: APRIL TO JUNE 23.pdf25 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: UPTO JUNE 17.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JULY 17 TO SEP 17.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCT TO DEC 17.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JAN TO MARCH 18.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MAY TO SEP 18.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCT TO DEC 18.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JAN TO JUNE 19.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JULY 19 TO SEP 20.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCT 20 TO JUNE 21.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JULY 21 TO SEP 22.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OCT TO DEC 22.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: JAN TO MARCH 23.pdf23 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: APRIL TO JUNE 23.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: UPTO JUNE 17.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JULY TO SEP 17.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT TO DEC 17.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JAN TO APRIL 18.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAY TO SEP 18.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT TO DEC 18.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JAN TO JUNE 19.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JULY 19 TO SEP 20.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OCT 20 TO JUNE 21.pdf23 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: JULY T 21 TO SEP 22.pdf23 Sep 2023
Certificates of CA (Form 3)File: UPTO JUNE 17.pdf23 Sep 2023
Certificates of CA (Form 3)File: JULY TO SEP 17.pdf23 Sep 2023
Certificates of CA (Form 3)File: OCT TO DEC 17.pdf23 Sep 2023
Certificates of CA (Form 3)File: JAN TO APRIL 18.pdf23 Sep 2023
Certificates of CA (Form 3)File: MAY TO SEP 18.pdf23 Sep 2023
Certificates of CA (Form 3)File: OCT TO DEC 18.pdf23 Sep 2023
Certificates of CA (Form 3)File: JAN TO JUNE 19.pdf23 Sep 2023
Certificates of CA (Form 3)File: JULY 19 TO SEP 20.pdf23 Sep 2023
Certificates of CA (Form 3)File: OCT 20 TO JUNE 21.pdf23 Sep 2023
Certificates of CA (Form 3)File: JULY 21 TO SEP 22.pdf23 Sep 2023
Certificates of CA (Form 3)File: OCT TO DEC 22.pdf23 Sep 2023
Certificates of CA (Form 3)File: JAN TO MARCH 23.pdf23 Sep 2023
Certificates of CA (Form 3)File: APRIL TO JUNE 23.pdf23 Sep 2023

How this compares with Mumbai Suburban

69%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 63 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GULRAJ PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATUNGA6,700+ in Mumbai Suburban

2 kmGULRAJ PARADISECompleted 45Lapsed / revoked 21Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: M/S RELIABLE CONSTRUCTION

M/S RELIABLE CONSTRUCTION has 1 registration on MahaRERA, including GULRAJ PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GULRAJ PARADISE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULRAJ PARADISE?

The registered promoter entity is M/S RELIABLE CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULRAJ PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GULRAJ PARADISE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GULRAJ PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULRAJ PARADISE?

The professionals named in the filing: Architect: ATHARVA CONSULTANTS; Engineer: Hanware Consultants; Chartered Accountant: A.K MANTRI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULRAJ PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULRAJ PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULRAJ PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.