Home / Browse projects / Palghar, Maharashtra / GULMOHAR HERITAGE BUILDING NO 3 WING C AND D

Completed No litigation declared Residential / Group Housing project

GULMOHAR HERITAGE BUILDING NO 3 WING C AND D

By VIVA SWASTIK HOMES

RG-MH-21107 · RERA P99000002070 · Last updated on MahaRERA portal: 12 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 11 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
May 2019Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 21 documents Report an error

GULMOHAR HERITAGE BUILDING NO 3 WING C AND D is a Residential / Group Housing project by VIVA SWASTIK HOMES in Palghar, Maharashtra, registered with MahaRERA as P99000002070 on 31 Jul 2017. The registration is recorded completed; possession was promised by 31 May 2019. The completion date has moved by 11 months from the original filing.

At a glance

Project

  • NameGULMOHAR HERITAGE BUILDING NO 3 WING C AND D
  • TypeResidential / Group Housing
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000002070
  • ReraGenie IDRG-MH-21107

Builder

  • NameVIVA SWASTIK HOMES
  • Entity typePartnership
  • PartnersPramod Kashinath Patil, Kishor Dattatray Naik
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseJun 2018Revised toMay 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion31 May 2019
  • Revised completionRevised to 31 May 2019 (originally 1 Jun 2018)
  • Buildings2 building records
  • Documents filed21 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULMOHAR HERITAGE BUILDING NO 3 WING CNA160000
GULMOHAR HERITAGE BUILDING NO 3 WING DNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

GULMOHAR HERITAGE BUILDING NO 3 WING C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GULMOHAR HERITAGE BUILDING NO 3 WING D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes100%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered17
Open Space71
BuildingClosed/CoveredOpen SpaceTotal
GULMOHAR HERITAGE BUILDING NO 3 WING C124456
GULMOHAR HERITAGE BUILDING NO 3 WING D52732

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,660 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI7112.89
Proposed, not sanctioned7,018 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHREE APARTMENT NALLASOPARA WEST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE & ASSOCIATES
PartnerRole in project
VIVA SWASTIK HOMES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000000040Jun 2018 → May 2019

Reason as filed by the promoterRespected Sir/Maam, We M/S Viva Swastik Homes, promoter of project "Gulmohar Heritage Building No.3. Wing C&D" have completed our project in july 2017. We have applied for Consent to Operate with UAN No. MPCB-CONSENT-0000031332 dated 01-08-2017 and we have paid the scrutiny fee of Rs. 2,50,000 for the same. Field Officer of MPCB SRO 2 has also done site visit on 16.08.2017 for the same. On 26.09.2017 CC meeting was conducted but our project was not on agenda and till date after 26.09.2017 no such meeting was conducted by MPCB. Without getting Consent to Operate we cannot Obtain Occupancy Certi

EXT99000000585Jun 2018 → May 2019

Reason as filed by the promoterwe have received Consent To Operate order on dated - 31/05/2018. Now, we have applied for Occupancy Certificate for the above project to vasai virar city municipal corporation [vvcmc] and we are expecting to get the occupancy certificate by 31/12/2018. so we hereby request you to please extend our project date by 31/12/2018.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Dec 2020

Documents filed21

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CERSAI detailsFile: Membership Certificate.pdf12 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Gulmohar heritage wing C and D.pdf12 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERTIFICATE.pdf7 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf8 Dec 2020
Certificates of CA (Form 5)File: CA Aduit Report 17-18.pdf29 Mar 2019
PAN CardFile: DL APPOINTMENT.pdf30 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: new engineer certificate.pdf30 Dec 2017
Building plan approvalFile: building plan approval vsh.pdf26 Jul 2017
Layout approvalFile: layout vsh.pdf26 Jul 2017
PAN CardFile: pan card vsh.pdf26 Jul 2017
Copy of the legal title reportFile: title report vsh.pdf26 Jul 2017
Details of encumbrancesFile: encumbrancs letter vsh.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: layout vsh.pdf26 Jul 2017
Building Plan Approval (IOD)File: building plan approval vsh.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: cc vsh.pdf26 Jul 2017
Declaration in FORM BFile: declaration in FORM B.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer report vsh.pdf26 Jul 2017
Certificates of CA (Form 3)File: ca certificate.pdf26 Jul 2017
Proforma of Allotment letterFile: provisional booking letter vsh.pdf26 Jul 2017
Proforma of Allotment letterFile: agrement for sale new vsh.pdf26 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GULMOHAR HRITAGE B NO 3 WING C AND DNEXT TO FUNFIESTA MULTIPLEX SRIPRATSHA ROAD NALLASOPARA WEST1CompletedDec 2017Late, May 2019

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 11 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GULMOHAR HERITAGE BUILDING NO 3 WING C AND D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmGULMOHAR HERITAGE BUILDICompleted 52Lapsed / revoked 42Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 208 registered projects within 2 km.

Builder: VIVA SWASTIK HOMES

VIVA SWASTIK HOMES has 4 registrations on MahaRERA, including GULMOHAR HERITAGE BUILDING NO 3 WING C AND D and GULMOHAR HERITAGE BUILDING NO 3 WING E PHASE I. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GULMOHAR HERITAGE BUILDING NO 3 WING C AND D is delayed beyond 31 May 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULMOHAR HERITAGE BUILDING NO 3 WING C AND D?

The registered promoter entity is VIVA SWASTIK HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULMOHAR HERITAGE BUILDING NO 3 WING C AND D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GULMOHAR HERITAGE BUILDING NO 3 WING C AND D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULMOHAR HERITAGE BUILDING NO 3 WING C AND D?

The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULMOHAR HERITAGE BUILDING NO 3 WING C AND D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULMOHAR HERITAGE BUILDING NO 3 WING C AND D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULMOHAR HERITAGE BUILDING NO 3 WING C AND D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.