ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GULMOHAR CITY

Registered No litigation declared Residential / Group Housing project

GULMOHAR CITY

By GURUDATTA BUILDERS AND DEVELOPERS CHAKAN

RG-MH-18450 · RERA P52100077275 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
8 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

GULMOHAR CITY is a Residential / Group Housing project by GURUDATTA BUILDERS AND DEVELOPERS CHAKAN in Pune, Maharashtra, registered with MahaRERA as P52100077275 on 2 Aug 2024. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameGULMOHAR CITY
  • TypeResidential / Group Housing
  • Location
    • TALEGAON CHAKAN ROAD
    • RANUBAI MALA
    • Chakan (CT)
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • RERA no.P52100077275
  • ReraGenie IDRG-MH-18450

Builder

  • NameGURUDATTA BUILDERS AND DEVELOPERS CHAKAN
  • Entity typePartnership
  • PartnersGANESH GULAB GORE, GANESH VILAS WADEKAR, DEEPAK SHIVAJI GORE

Key dates

this monthRegisteredAug 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA120000
WING BNA120000
WING CNA120000
WING DNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

WING A41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed220

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots220
Closed/Covered220
BuildingClosed/CoveredTotal
WING A5050
WING B6060
WING C6060
WING D5050

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SURESH BAJIRAO BIRADWADEChakan (CT)Pune
ANANDA BAJIRAO BIRADWADEChakan (CT)Pune

Approvals and building plan

Permissible FSI17189.11
Proposed, not sanctioned17,189 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1548 BY A SADASHIV PETH OFF TILAK ROAD PUNE 411030

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRECISION ARCHITECTS & PLANNER
EngineerSANKET S HOGE
Chartered AccountantN D KALOKHE AND ASSOCIATES
PartnerRole in project
GURUDATTA BUILDERS AND DEVELOPERS CHAKAN-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1.pdf27 Apr 2026
Form 2File: Form-2.pdf27 Apr 2026
Form 3File: Form-3.pdf27 Apr 2026
Disclosure of Sold and Booked InventoryFile: Summery.pdf27 Apr 2026
Form 1File: Form- 1 GULMOHAR CITY.pdf19 Jan 2026
Form 2File: Form 2 GULMOHAR CITY.pdf19 Jan 2026
Form 3File: Form 3-4 (2)GULMOHAR CITY.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Summery GULMOHAR CITY.pdf19 Jan 2026
Form 1File: form 1 july-sept 2025.pdf15 Oct 2025
Form 2File: form 2 july-sept 2025.pdf15 Oct 2025
Form 3File: Adobe Scan Oct 06, 2025 (1).pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Adobe Scan Oct 14, 2025 (5).pdf15 Oct 2025
Form 1File: GURUDATTA FORM 1.pdf6 Aug 2025
Form 2File: GURUDATTA FORM 2.pdf6 Aug 2025
Form 3File: GURUDATTA FORM 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: GURUDATTA SOLD UNSOLD.pdf6 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf12 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Mar 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf6 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf6 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf6 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE OF SECURED AND UNSECURED FINANCE.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf7 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 Oct 2024
Other - TechnicalFile: ANNEXURE A.pdf7 Jul 2024
Layout approvalFile: LAYOUT.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 1.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 2.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 3.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 4.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 5.pdf29 Jun 2024
Building plan approvalFile: PLAN COPY 6.pdf29 Jun 2024
PAN CardFile: PAN CARD.pdf29 Jun 2024
Copy of the legal title reportFile: TITLE REPORT.pdf29 Jun 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES DETAILS.pdf29 Jun 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCES DETAILS.pdf29 Jun 2024
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 1.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 2.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 3.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 4.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 5.pdf29 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY 6.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf29 Jun 2024
Declaration about Commencement CertificateFile: COMMENCEMENT DECLARATION.pdf29 Jun 2024
Declaration in FORM BFile: FORM B BUILDER.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jun 2024
CERSAI detailsFile: CERSAI DETAILS.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER ORGANISATION DETAILS 1.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER ORGANISATION DETAILS 2.pdf29 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER ORGANISATIONS DETAILS.pdf29 Jun 2024
Proforma of Agreement for saleFile: AGREEMENT TO SELL.pdf29 Jun 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf29 Jun 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: BANK DECLARATION.pdf29 Jun 2024
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT.pdf29 Jun 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf29 Jun 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GULMOHAR CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RANUBAI MALA13,700+ in Pune

Builder: GURUDATTA BUILDERS AND DEVELOPERS CHAKAN

GURUDATTA BUILDERS AND DEVELOPERS CHAKAN has 1 registration on MahaRERA, including GULMOHAR CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GULMOHAR CITY is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULMOHAR CITY?

The registered promoter entity is GURUDATTA BUILDERS AND DEVELOPERS CHAKAN, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULMOHAR CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GULMOHAR CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULMOHAR CITY?

The professionals named in the filing: Architect: PRECISION ARCHITECTS & PLANNER; Engineer: SANKET S HOGE; Chartered Accountant: N D KALOKHE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULMOHAR CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULMOHAR CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULMOHAR CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one