ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Greenwoods

Completed No litigation declared Others project

Greenwoods

By BKS galaxy realtors Pvt ltd

RG-MH-09669 · RERA P52000001151 · Last updated on MahaRERA portal: 9 Jan 2024

Source: official MahaRERA filing

Red flags

  • 62 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
62Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Greenwoods is a Others project by BKS galaxy realtors Pvt ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000001151 on 26 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 30 months from the original filing. 62 complaints are on record with the regulator.

At a glance

Project

  • NameGreenwoods
  • TypeOthers
  • Location
    • Sector- 35E
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001151
  • ReraGenie IDRG-MH-09669

Builder

  • NameBKS galaxy realtors Pvt ltd
  • Entity typeCompany
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed140 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA340000
Wing BNA340000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 9 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

Wing A96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Wing B96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 9 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%

Parking filed179

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots179
Closed/Covered163
Open Space16
BuildingClosed/CoveredOpen SpaceTotal
Wing A82890
Wing B81889

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
M/S Rekhi Sai RealtyNavi Mumbai (M Corp.)Thane
M/S Proviso Builders and developersNavi Mumbai (M Corp.)Thane

Approvals and building plan

Permissible FSI9824.35
Proposed, not sanctioned9,824 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Plot no 1 Moraj Residency Sector 16, Sanpada, Navi Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesigno Architects
EngineerDr BL Agrawal and Associates
PartnerRole in project
BKS galaxy realtors Pvt ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000010223Jun 2021 → Jun 2022

Reason as filed by the promoterDelay in obtaining necessary NOC's from the respective competent authorities due to Covid-19 pandemic, thereby leading to delay in obtaining occupancy certificate.

EXT52000013576Jun 2021 → Dec 2023

Reason as filed by the promoterWe hereby apply for extension of registration of project ‘Greenwoods registered with the regulatory authority vide project registration certificate bearing no. P52000001151. Delay in delivering possession of units to their purchasers is due to following reasons: i. Delay by the Aviation Ministry in issuing NOC: a. Aviation Ministry erroneously imposed height restriction in to our Project. After due follow up by Govt. of Maharashtra, Urban Development Minister with the Aviation Minister vide their letter dated 13/04/2022, we have obtained Aviation NOC dated 18/08/2022 from the competent authori

Litigation declared1

CaseCourtStatus
574/2018Civil Court PanvelPending

Complaints filed with MahaRERA62

Case no.ComplainantRespondentFiled
CC006000000199203Mr. Avinash Jadhav and Mrs. Arati JadhavBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199212Mr.Vijaysinh Vaghela and Mrs. Kalpanaba VaghelaBKS Galaxy Realtors Pvt.Ltd08/12/2021
CC006000000199213Surekha Arun Wedhikar and Tushar Arun WedhikarBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199215Mrs. Swati Abhimanyu Bade and Mr. Abhimanyu Arjun BadeBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199219Mr. M B Naveen Kumar Balaiyya and Mrs. G Krishna MahathiBKS Galaxy Realtors Pvt Ltd13/01/2022
CC006000000199220Nadeem Adam KundlikBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199263MR Priyanshu Vajpeyi and Mrs. Smriti VajpeyiBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199228Mr. Vasant Mahadevrao Shende, Dr. Sunit Vasant Shende and Dr. Priyanka Sunit ShendeBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199231Mr. Sreenivas Puttagunta and Mrs. Padmasri PuttaguntaBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199234Mr. Prosanta Kumar Chakraborty and Mrs.Sutapa ChakrabortyBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199237Mr. Ajit Mansingrao Patil and Mrs.Suprita Ajit PatilBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199238Mr. Amol Mahadev PawarBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199255Mrs. Tejswini Shamsunder Giripunje and Mr. Pranav Sanjay GulhaneBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199239Mr. Anand Krishna Bhandari and Mrs Priyadarshini Anand BhandariBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199240Mr Pankaj Solanki and Mrs. Teena SolankiBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199241Mr. Vivek Venugopal Nair and Mrs.Hinduja Vivek NairBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199243Mr. Sanjay Waskar and Mrs. Bhavna WaskarBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199245Mr. Vijay Krishnarao NikamBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199252Mr. Pankaj OjhaBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199259Mr. Rejy John and Mrs. Donna K. MathaiBKS Galaxy Realtors Pvt Ltd18/12/2021
CC006000000199260Mr. Bibin Babu Nair and Mrs. Letha Babu NairBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199272Vivek Narayan Ghule and Sandhya Vivek GhuleBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199274Suresh Ganpat Jadhav and Suvarna Suresh JadhavBKS Galaxy Realtors Pvt Ltd10/12/2021
CC006000000199275Dhondu Soma Parate and Housabai Dhondu ParateBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199277Mr. Dontu Pandurangaiah and Mrs. D.S.GowriBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199280Ashok Pandurang Thete and Jyoti Ashok TheteBKS Galaxy Realtors Pvt Ltd18/12/2021
CC006000000199279Mr N Shankararao and Mrs Nhv Adi LakshamiM/S BKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199282M KrishnamoorthyBKS Galaxy Realtors Pvt Ltd09/01/2022
CC006000000199284Mr. Asif Mahamud KumandanBKS Galaxy Realtors Pvt Ltd18/12/2021
CC006000000199286Baby Shivaji KakadBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199292Prakash Ganpat KadamBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199294Ajay Shantaram Awate and Sandhya Ajay AwateBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199296Mr. Uddhav Jayram Phalke and Mrs. Yogita Uddhav PhalkeBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199298Someshwar Tukaram Khatpe and Sheetal Someshwar KhatpeBKS Galaxy Realtors Pvt Ltd18/12/2021
CC006000000199300Nisma Shaikh Mohideen and Shaikh Mohideen RajameeranBKS Galaxy Realtors Pvt Ltd09/12/2021
CC006000000199302Mr. Hemant Ramesh NemadeBKS Galaxy Realtors Pvt Ltd22/12/2021
CC006000000199304Mrs. Prachee Bhabal and Mr. Pradeep Shripat BhabalBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199303Subrat Kumar Pattnaik and Bidyut Prava RoutaryBKS Galaxy Realtors Pvt Ltd18/12/2021
CC006000000199313Mr Sidram D Jadhav and Mrs Sakshi Sidram JadhavBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199337Mr. Nainesh Mehta and Mrs. Manisha MehtaBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000199343Mr. Nanabhau Indore and Mr. Nilesh IndoreBKS Galaxy Realtors Pvt Ltd08/12/2021
CC006000000209357Mr. Sayed Faisal Abdul SalamBKS Galaxy Realtors Pvt Ltd10/12/2021
CC006000000209470Mr. Shamit B Chavan and MrsTrupti S ChavanBKS galaxy realtors Pvt ltd31/12/2021
CC006000000209542Mr. Chandra Pratap PalBKS galaxy realtors Pvt ltd31/12/2021
CC006000000209574Mr Raunak Suresh Singh and Mrs Amrita SinghBKS galaxy realtors Pvt ltd31/12/2021
CC006000000210395MR MOHAMMEDI DALAL MRS TASNEEM DALAL MR MURTAZA DALALBKS Galaxy Realtors Pvt Ltd07/04/2022
CC006000000210503RAMRAO MOHAN NADKARNIBKS Galaxy Realtors Pvt Ltd07/04/2022
CC006000000221005Mrs. Jemy Romany and Mr. Romany John PathalilBKS Galaxy Realtors Pvt. Ltd.29/04/2022
CC006000000221006Mr. Nikhil Sureshkumar Gadewal and Mrs. Alka Nikhil GadewalBKS Galaxy Realtors Pvt Ltd29/04/2022
CC006000000251434Mr. Prashant Kailash Panigrahi and Mrs. Abhilasha Prashant PanigrahiBKS Galaxy Realtors Pvt. Ltd.11/06/2022
CC006000000251436Mrs. Neha Sharma and Mr. Parvesh KalraBKS Galaxy Realtors Pvt Ltd11/06/2022
CC006000000292504Mr. Prashantt Sadashiv Sonavane and Mrs. Jyoti Prashantt SonavaneBKS Galaxy Realtors Pvt Ltd02/09/2022
CC006000000292525Mrs.Priyanka Jagdishsingh RawatBKS Galaxy Realtors Pvt. Ltd.03/09/2022
CC006000000292563Mrs. Rupali Shailesh Bhangale Mr. Shailesh Vasant Bhangale Mr. Vasant Shaligram BhangaleBKS Galaxy Realtors Pvt Ltd07/09/2022
CC006000000292604Mr. Arvind Sawarkar and Mrs. Shrutika SawarkarBKS Galaxy Realtors Pvt Ltd09/09/2022
CC006000000292606Mr. Kalpesh Satish Nemade and Mrs. Rajashri Kalpesh NemadeBKS Galaxy Realtors Pvt Ltd09/09/2022
CC006000000364730MR AMIT MAKKARBKS GALAXY REALTORS PVT LTD16/03/2023
CC006000000364756MRS ASHA BRAMHA PAWARBKS GALAXY REALTORS PVT LTD16/03/2023
CC006000000364729MR TARESH VARSHNEY AND MRS CHARU CHANDRA VARSHNEYBKS GALAXY REALTORS PVT LTD16/03/2023
CC006000000364727MRS CHARU PAL, MR MOHAN SINGH PAL AND MRS PRAMILA PALBKS GALAXY REALTORS PVT LTD16/03/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Jul 2023

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_5_Mar23 (1).pdf9 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - Greenwoods.pdf7 Jul 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf30 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ Architect Certificate.pdf13 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep'22.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE SEP'22.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greenwoods Form II Dec'22.pdf11 Jan 2023
Certificates of CA (Form 3)File: Form-3-Sep22.pdf11 Jan 2023
Certificates of CA (Form 3)File: Form-3-Dec22.pdf11 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Greenwoods 21-22.pdf9 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf5 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Greenwoods.pdf5 Aug 2022
Certificates of CA (Form 3)File: Form 3_Greenwoods.pdf5 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Greenwoods March'21.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March'22.pdf1 Jul 2022
Proforma of Allotment letterFile: Revised GREENWOOD RERA Agreement draft.pdf21 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf3 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Greenwoods March'22.pdf3 May 2022
Certificates of CA (Form 3)File: Form 3 Greenwoods March'22.pdf3 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Greenwoods.pdf4 Apr 2022
Certificates of CA (Form 3)File: Form-3_sign.pdf4 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Greenwoods.pdf25 Mar 2022
Certificates of CA (Form 3)File: Form-3_sign.pdf25 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Greenwoods.pdf15 Nov 2021
Certificates of CA (Form 3)File: form 3_Sep'21 Greenwoods.pdf15 Nov 2021
Declaration about Commencement CertificateFile: Form D- 07_06_2021.pdf19 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate (Form 2A).pdf19 Jul 2021
Disclosure of sold/ booked inventoryFile: Disclosure for sold_unsold booked inventory- 30_06_2021.pdf19 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect's Completion Certificate 13_03_2021.pdf19 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf8 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form II.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA FORM 2A.pdf8 Jul 2021
Certificates of CA (Form 3)File: Form III June'21.pdf8 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM-5 GREENWOOD 2019-20.pdf25 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BKS Greenwood Engineer's Certificate.pdf17 May 2021
Certificates of CA (Form 3)File: Greenwoods Form III.pdf17 May 2021
OtherFile: Greenwoods- Removal of wrong document.pdf17 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GREENWOOD ENGINEERS CERTIFICATE 31ST DEC 2020.pdf3 Mar 2021
Certificates of CA (Form 3)File: Form 3_Greenwoods.pdf3 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: GREENWOOD PROJECT FORM-5 (18-19).pdf3 Mar 2021
Layout approvalFile: Amended layout plan-1.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-2.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-3.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-4.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-5.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-6.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-7.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-8.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-9.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-10.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-11.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-12.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-13.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-14.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-15.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-16.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-17.pdf3 Feb 2021
Layout approvalFile: Amended layout plan-18.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-1.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-2.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-3.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-4.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-5.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-6.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-7.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-8.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-9.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-10.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-11.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-12.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-13.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-14.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-15.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-16.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-17.pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: Amended layout plan-18.pdf3 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: county amended cc 4th floor.pdf25 Jan 2021
Declaration in FORM BFile: Declaration for fourth floor amendment.pdf25 Jan 2021

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Proviso Heightsplot no 179 sector 17 ulwe135CompletedJun 2016May 2016
Proviso Cornerplot no 224 sector 23 Ulwe62CompletedJun 2016Late, Aug 2016
Carinaplot no 10 sector 15 at kharghar89CompletedDec 2015May 2015
Proviso complexplot no 5 6 7 sector 35 E kharghar159CompletedSep 2014Jul 2013
Galaxy Orionplot no 50 A sector 35 D Kharghar93CompletedDec 2013Jul 2013
Galaxy Nebulaplot no 220 and 221 sector 10 Kharghar80CompletedJun 2013Late, Jul 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Greenwoods on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar5,900+ in Raigarh

2 kmGreenwoodsCompleted 29Lapsed / revoked 12Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: BKS galaxy realtors Pvt ltd

BKS galaxy realtors Pvt ltd has 1 registration on MahaRERA, including Greenwoods. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Greenwoods is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Greenwoods?

The registered promoter entity is BKS galaxy realtors Pvt ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Greenwoods?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Greenwoods?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Greenwoods?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Greenwoods?

The professionals named in the filing: Architect: Designo Architects; Engineer: Dr BL Agrawal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Greenwoods?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Greenwoods. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Greenwoods to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.