Red flags
- 62 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Greenwoods is a Others project by BKS galaxy realtors Pvt ltd in Raigarh, Maharashtra, registered with MahaRERA as P52000001151 on 26 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2023. The completion date has moved by 30 months from the original filing. 62 complaints are on record with the regulator.
At a glance
Project
- NameGreenwoods
- TypeOthers
- Location
- Sector- 35E
- Kharghar
- Panvel
- Raigarh
- 410210
- Pincode410210
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000001151
- ReraGenie IDRG-MH-09669
Builder
- NameBKS galaxy realtors Pvt ltd
- Entity typeCompany
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 Jul 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed140 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 34 | 0 | 0 | 0 | 0 |
| Wing B | NA | 34 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 9 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.
Wing A96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Wing B96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 9 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 90% |
| Open Parking | Yes | 90% |
Parking filed179
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Wing A | 82 | 8 | 90 |
| Wing B | 81 | 8 | 89 |
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S Rekhi Sai Realty | Navi Mumbai (M Corp.) | Thane |
| M/S Proviso Builders and developers | Navi Mumbai (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Designo Architects |
| Engineer | Dr BL Agrawal and Associates |
| Partner | Role in project |
|---|---|
| BKS galaxy realtors Pvt ltd | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDelay in obtaining necessary NOC's from the respective competent authorities due to Covid-19 pandemic, thereby leading to delay in obtaining occupancy certificate.
Reason as filed by the promoterWe hereby apply for extension of registration of project ‘Greenwoods registered with the regulatory authority vide project registration certificate bearing no. P52000001151. Delay in delivering possession of units to their purchasers is due to following reasons: i. Delay by the Aviation Ministry in issuing NOC: a. Aviation Ministry erroneously imposed height restriction in to our Project. After due follow up by Govt. of Maharashtra, Urban Development Minister with the Aviation Minister vide their letter dated 13/04/2022, we have obtained Aviation NOC dated 18/08/2022 from the competent authori
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 574/2018 | Civil Court Panvel | Pending |
Complaints filed with MahaRERA62
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000199203 | Mr. Avinash Jadhav and Mrs. Arati Jadhav | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199212 | Mr.Vijaysinh Vaghela and Mrs. Kalpanaba Vaghela | BKS Galaxy Realtors Pvt.Ltd | 08/12/2021 |
| CC006000000199213 | Surekha Arun Wedhikar and Tushar Arun Wedhikar | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199215 | Mrs. Swati Abhimanyu Bade and Mr. Abhimanyu Arjun Bade | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199219 | Mr. M B Naveen Kumar Balaiyya and Mrs. G Krishna Mahathi | BKS Galaxy Realtors Pvt Ltd | 13/01/2022 |
| CC006000000199220 | Nadeem Adam Kundlik | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199263 | MR Priyanshu Vajpeyi and Mrs. Smriti Vajpeyi | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199228 | Mr. Vasant Mahadevrao Shende, Dr. Sunit Vasant Shende and Dr. Priyanka Sunit Shende | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199231 | Mr. Sreenivas Puttagunta and Mrs. Padmasri Puttagunta | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199234 | Mr. Prosanta Kumar Chakraborty and Mrs.Sutapa Chakraborty | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199237 | Mr. Ajit Mansingrao Patil and Mrs.Suprita Ajit Patil | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199238 | Mr. Amol Mahadev Pawar | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199255 | Mrs. Tejswini Shamsunder Giripunje and Mr. Pranav Sanjay Gulhane | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199239 | Mr. Anand Krishna Bhandari and Mrs Priyadarshini Anand Bhandari | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199240 | Mr Pankaj Solanki and Mrs. Teena Solanki | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199241 | Mr. Vivek Venugopal Nair and Mrs.Hinduja Vivek Nair | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199243 | Mr. Sanjay Waskar and Mrs. Bhavna Waskar | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199245 | Mr. Vijay Krishnarao Nikam | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199252 | Mr. Pankaj Ojha | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199259 | Mr. Rejy John and Mrs. Donna K. Mathai | BKS Galaxy Realtors Pvt Ltd | 18/12/2021 |
| CC006000000199260 | Mr. Bibin Babu Nair and Mrs. Letha Babu Nair | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199272 | Vivek Narayan Ghule and Sandhya Vivek Ghule | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199274 | Suresh Ganpat Jadhav and Suvarna Suresh Jadhav | BKS Galaxy Realtors Pvt Ltd | 10/12/2021 |
| CC006000000199275 | Dhondu Soma Parate and Housabai Dhondu Parate | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199277 | Mr. Dontu Pandurangaiah and Mrs. D.S.Gowri | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199280 | Ashok Pandurang Thete and Jyoti Ashok Thete | BKS Galaxy Realtors Pvt Ltd | 18/12/2021 |
| CC006000000199279 | Mr N Shankararao and Mrs Nhv Adi Lakshami | M/S BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199282 | M Krishnamoorthy | BKS Galaxy Realtors Pvt Ltd | 09/01/2022 |
| CC006000000199284 | Mr. Asif Mahamud Kumandan | BKS Galaxy Realtors Pvt Ltd | 18/12/2021 |
| CC006000000199286 | Baby Shivaji Kakad | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199292 | Prakash Ganpat Kadam | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199294 | Ajay Shantaram Awate and Sandhya Ajay Awate | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199296 | Mr. Uddhav Jayram Phalke and Mrs. Yogita Uddhav Phalke | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199298 | Someshwar Tukaram Khatpe and Sheetal Someshwar Khatpe | BKS Galaxy Realtors Pvt Ltd | 18/12/2021 |
| CC006000000199300 | Nisma Shaikh Mohideen and Shaikh Mohideen Rajameeran | BKS Galaxy Realtors Pvt Ltd | 09/12/2021 |
| CC006000000199302 | Mr. Hemant Ramesh Nemade | BKS Galaxy Realtors Pvt Ltd | 22/12/2021 |
| CC006000000199304 | Mrs. Prachee Bhabal and Mr. Pradeep Shripat Bhabal | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199303 | Subrat Kumar Pattnaik and Bidyut Prava Routary | BKS Galaxy Realtors Pvt Ltd | 18/12/2021 |
| CC006000000199313 | Mr Sidram D Jadhav and Mrs Sakshi Sidram Jadhav | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199337 | Mr. Nainesh Mehta and Mrs. Manisha Mehta | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000199343 | Mr. Nanabhau Indore and Mr. Nilesh Indore | BKS Galaxy Realtors Pvt Ltd | 08/12/2021 |
| CC006000000209357 | Mr. Sayed Faisal Abdul Salam | BKS Galaxy Realtors Pvt Ltd | 10/12/2021 |
| CC006000000209470 | Mr. Shamit B Chavan and MrsTrupti S Chavan | BKS galaxy realtors Pvt ltd | 31/12/2021 |
| CC006000000209542 | Mr. Chandra Pratap Pal | BKS galaxy realtors Pvt ltd | 31/12/2021 |
| CC006000000209574 | Mr Raunak Suresh Singh and Mrs Amrita Singh | BKS galaxy realtors Pvt ltd | 31/12/2021 |
| CC006000000210395 | MR MOHAMMEDI DALAL MRS TASNEEM DALAL MR MURTAZA DALAL | BKS Galaxy Realtors Pvt Ltd | 07/04/2022 |
| CC006000000210503 | RAMRAO MOHAN NADKARNI | BKS Galaxy Realtors Pvt Ltd | 07/04/2022 |
| CC006000000221005 | Mrs. Jemy Romany and Mr. Romany John Pathalil | BKS Galaxy Realtors Pvt. Ltd. | 29/04/2022 |
| CC006000000221006 | Mr. Nikhil Sureshkumar Gadewal and Mrs. Alka Nikhil Gadewal | BKS Galaxy Realtors Pvt Ltd | 29/04/2022 |
| CC006000000251434 | Mr. Prashant Kailash Panigrahi and Mrs. Abhilasha Prashant Panigrahi | BKS Galaxy Realtors Pvt. Ltd. | 11/06/2022 |
| CC006000000251436 | Mrs. Neha Sharma and Mr. Parvesh Kalra | BKS Galaxy Realtors Pvt Ltd | 11/06/2022 |
| CC006000000292504 | Mr. Prashantt Sadashiv Sonavane and Mrs. Jyoti Prashantt Sonavane | BKS Galaxy Realtors Pvt Ltd | 02/09/2022 |
| CC006000000292525 | Mrs.Priyanka Jagdishsingh Rawat | BKS Galaxy Realtors Pvt. Ltd. | 03/09/2022 |
| CC006000000292563 | Mrs. Rupali Shailesh Bhangale Mr. Shailesh Vasant Bhangale Mr. Vasant Shaligram Bhangale | BKS Galaxy Realtors Pvt Ltd | 07/09/2022 |
| CC006000000292604 | Mr. Arvind Sawarkar and Mrs. Shrutika Sawarkar | BKS Galaxy Realtors Pvt Ltd | 09/09/2022 |
| CC006000000292606 | Mr. Kalpesh Satish Nemade and Mrs. Rajashri Kalpesh Nemade | BKS Galaxy Realtors Pvt Ltd | 09/09/2022 |
| CC006000000364730 | MR AMIT MAKKAR | BKS GALAXY REALTORS PVT LTD | 16/03/2023 |
| CC006000000364756 | MRS ASHA BRAMHA PAWAR | BKS GALAXY REALTORS PVT LTD | 16/03/2023 |
| CC006000000364729 | MR TARESH VARSHNEY AND MRS CHARU CHANDRA VARSHNEY | BKS GALAXY REALTORS PVT LTD | 16/03/2023 |
| CC006000000364727 | MRS CHARU PAL, MR MOHAN SINGH PAL AND MRS PRAMILA PAL | BKS GALAXY REALTORS PVT LTD | 16/03/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Feb 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Jul 2023
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_5_Mar23 (1).pdf | 9 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate - Greenwoods.pdf | 7 Jul 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf | 7 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 30 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 18 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_ Architect Certificate.pdf | 13 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep'22.pdf | 11 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE SEP'22.pdf | 11 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greenwoods Form II Dec'22.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Form-3-Sep22.pdf | 11 Jan 2023 |
| Certificates of CA (Form 3)File: Form-3-Dec22.pdf | 11 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Greenwoods 21-22.pdf | 9 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf | 5 Aug 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate - Greenwoods.pdf | 5 Aug 2022 |
| Certificates of CA (Form 3)File: Form 3_Greenwoods.pdf | 5 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Greenwoods March'21.pdf | 19 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate March'22.pdf | 1 Jul 2022 |
| Proforma of Allotment letterFile: Revised GREENWOOD RERA Agreement draft.pdf | 21 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf | 3 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate - Greenwoods March'22.pdf | 3 May 2022 |
| Certificates of CA (Form 3)File: Form 3 Greenwoods March'22.pdf | 3 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Greenwoods.pdf | 4 Apr 2022 |
| Certificates of CA (Form 3)File: Form-3_sign.pdf | 4 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Greenwoods.pdf | 25 Mar 2022 |
| Certificates of CA (Form 3)File: Form-3_sign.pdf | 25 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE Greenwoods.pdf | 15 Nov 2021 |
| Certificates of CA (Form 3)File: form 3_Sep'21 Greenwoods.pdf | 15 Nov 2021 |
| Declaration about Commencement CertificateFile: Form D- 07_06_2021.pdf | 19 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer's Certificate (Form 2A).pdf | 19 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure for sold_unsold booked inventory- 30_06_2021.pdf | 19 Jul 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect's Completion Certificate 13_03_2021.pdf | 19 Jul 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Form I.pdf | 8 Jul 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Form II.pdf | 8 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA FORM 2A.pdf | 8 Jul 2021 |
| Certificates of CA (Form 3)File: Form III June'21.pdf | 8 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA FORM-5 GREENWOOD 2019-20.pdf | 25 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BKS Greenwood Engineer's Certificate.pdf | 17 May 2021 |
| Certificates of CA (Form 3)File: Greenwoods Form III.pdf | 17 May 2021 |
| OtherFile: Greenwoods- Removal of wrong document.pdf | 17 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GREENWOOD ENGINEERS CERTIFICATE 31ST DEC 2020.pdf | 3 Mar 2021 |
| Certificates of CA (Form 3)File: Form 3_Greenwoods.pdf | 3 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: GREENWOOD PROJECT FORM-5 (18-19).pdf | 3 Mar 2021 |
| Layout approvalFile: Amended layout plan-1.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-2.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-3.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-4.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-5.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-6.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-7.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-8.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-9.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-10.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-11.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-12.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-13.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-14.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-15.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-16.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-17.pdf | 3 Feb 2021 |
| Layout approvalFile: Amended layout plan-18.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-1.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-2.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-3.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-4.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-5.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-6.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-7.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-8.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-9.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-10.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-11.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-12.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-13.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-14.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-15.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-16.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-17.pdf | 3 Feb 2021 |
| Copy of Layout Approval (in case of layout)File: Amended layout plan-18.pdf | 3 Feb 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: county amended cc 4th floor.pdf | 25 Jan 2021 |
| Declaration in FORM BFile: Declaration for fourth floor amendment.pdf | 25 Jan 2021 |
Promoter's earlier projects6
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Proviso Heights | plot no 179 sector 17 ulwe | 135 | Completed | Jun 2016 | May 2016 |
| Proviso Corner | plot no 224 sector 23 Ulwe | 62 | Completed | Jun 2016 | Late, Aug 2016 |
| Carina | plot no 10 sector 15 at kharghar | 89 | Completed | Dec 2015 | May 2015 |
| Proviso complex | plot no 5 6 7 sector 35 E kharghar | 159 | Completed | Sep 2014 | Jul 2013 |
| Galaxy Orion | plot no 50 A sector 35 D Kharghar | 93 | Completed | Dec 2013 | Jul 2013 |
| Galaxy Nebula | plot no 220 and 221 sector 10 Kharghar | 80 | Completed | Jun 2013 | Late, Jul 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
Keep Greenwoods on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kharghar5,900+ in Raigarh
Filed coordinates, straight-line distance. 83 registered projects within 2 km.
KHARGHAR HILLS
TODAY PRACHAR DEVELOPERS LLP, BHADRESH RAJ
Gami Bhagwati Orelia
GAMI VISION PRIVATE LIMITED
ANANDAM - II
TODAY GLOBAL HOMES
Godrej Varanya Phase 1
Godrej Properties Limited
Sai World Empire Phase III
paradisesuperstructures
SATYAM TRINITY TOWERS
SATYAM INFRA REALTY LLP
See every Raigarh project, with the district possession charts
Builder: BKS galaxy realtors Pvt ltd
BKS galaxy realtors Pvt ltd has 1 registration on MahaRERA, including Greenwoods. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Greenwoods is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Greenwoods?
The registered promoter entity is BKS galaxy realtors Pvt ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Greenwoods?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Greenwoods?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Greenwoods?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Greenwoods?
The professionals named in the filing: Architect: Designo Architects; Engineer: Dr BL Agrawal and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Greenwoods?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback