GREEN VIEW
RG-MH-75415 · RERA P52000046604 · Last updated on MahaRERA portal: 25 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 15 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GREEN VIEW is a Residential / Group Housing project by SIDDHIVINAYAK DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000046604 on 25 Aug 2022. The registration is recorded completed; possession was promised by 30 Sep 2026. The completion date has moved by 15 months from the original filing. 12 of the 28 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameGREEN VIEW
- TypeResidential / Group Housing
- Location
- PLOT NO 518/17
- BUNDER ROAD OLD PANVEL
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000046604
- ReraGenie IDRG-MH-75415
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Aug 2022
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 25 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GREEN VIEW | NA | 8 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
GREEN VIEW: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| TRIVENI CO-OP HSG SOCIETY LTD | Panvel | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GREEN VIEW | NA | Rs 2.80 cr | Rs 2.80 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR NEHA PATIL |
| Architect | NEHA |
| Engineer | RUTVIJ PATEL |
| Chartered Accountant | CA DEVYANI SHEJWAL |
| Chartered Accountant | D P Shejwal and Associates |
| Chartered Accountant | MANISH K RAMAWATI AND COMPANY |
| Chartered Accountant | M s Singh Ranjan & Co |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterOnly Fire, Airport and Lift NOC Pending from Government Authorities
Reason as filed by the promoterWe have 100% Completed Our Project. Only Fire, Airport and Lift NOC Pending from Government Authorities
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 25 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 25 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 31-03-2026 greenview.pdf | 25 Jul 2026 |
| Occupational CertificateFile: OC certificate-Triveni CHS.pdf | 25 Jul 2026 |
| Occupational CertificateFile: oc refer Plan 1.pdf | 25 Jul 2026 |
| Occupational CertificateFile: oc refer Plan 2.pdf | 25 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 31-03-2026 greenview.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: Form 3 31-03-2026 greenview.pdf | 18 May 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 GREEN VIEW 24-25 Sign.pdf | 25 Mar 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 31-12-2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 31-12-2025.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 New 30-09-2025 greenview.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 31-12-2025 greenview.pdf | 11 Mar 2026 |
| Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf | 13 Oct 2025 |
| Form 5 (FY 2023-2024)File: FORM 5 Siddhivinayak 23-24 (2).pdf | 13 Oct 2025 |
| Form 2A (FY 2022-2023)File: Form 2A Sys 22-23 singed - New.pdf | 25 Sep 2025 |
| Form 2A (FY 2023-2024)File: Form 2A Sys 23-24 singed - New.pdf | 25 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Sys 24-25 singed - New.pdf | 25 Sep 2025 |
| Form 1File: Form 1 - Green View 30-06-2025 Sign.pdf | 16 Sep 2025 |
| Form 2File: Form 2 - Green View 30-06-2025 Sign.pdf | 16 Sep 2025 |
| Form 3File: Form 3 - Green View 30-06-2025 Sign.pdf | 16 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold - Green View -30-06-2025 Sign.pdf | 16 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf | 6 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GREEN VIEW SIGNED - converted.pdf | 9 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-24 - converted.pdf | 9 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf | 9 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Siddhivinayak 23-24 - converted_1 (3 files merged).pdf | 9 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SIGNED.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf | 4 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Siddhivinayak 31-12-2023.pdf | 4 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-09-2023 signed.pdf | 25 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-09-2023 SIDDDHI.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2023.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf | 7 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 30-03-2023.pdf | 21 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FRom 2_1 (4 files merged).pdf | 21 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_1 (6 files merged) (1).pdf | 21 Sep 2023 |
| Proforma of Allotment letterFile: MODEL SALE AGREEMENT.pdf | 15 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT 1.pdf | 13 Aug 2022 |
| Proforma of Allotment letterFile: ALLOTMENT DRAFT.pdf | 13 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT SID DEV.pdf | 9 Aug 2022 |
| Copy of the legal title reportFile: RERA TITLE WITH FLOW.pdf | 6 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE.pdf | 6 Aug 2022 |
| Details of encumbrances concerned to LegalFile: No encumbrances Certificate legal.pdf | 6 Aug 2022 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 6 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 6 Aug 2022 |
| Layout approvalFile: PLAN 1.pdf | 5 Aug 2022 |
| Layout approvalFile: PLAN 2.pdf | 5 Aug 2022 |
| Building plan approvalFile: PLAN 1.pdf | 5 Aug 2022 |
| Building plan approvalFile: PLAN 2.pdf | 5 Aug 2022 |
| PAN CardFile: PAN CARD.pdf | 5 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN 1.pdf | 5 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 5 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 1.pdf | 5 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN 2.pdf | 5 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMM CERT 1.pdf | 5 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMM CERT 2.pdf | 5 Aug 2022 |
| Declaration about Commencement CertificateFile: declaration about comm cert.pdf | 5 Aug 2022 |
| Declaration in FORM BFile: Form B declaration.pdf | 5 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf | 5 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf | 5 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 45 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
Keep GREEN VIEW on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BUNDER ROAD OLD PANVEL5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SIDDHIVINAYAK DEVELOPERS
SIDDHIVINAYAK DEVELOPERS has 46 registrations on MahaRERA, including VIJAY PLAZA - A and VIJAY PLAZA - B. Its filings disclose 11 earlier MahaRERA projects: declares 6 of 9 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if GREEN VIEW is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GREEN VIEW?
The registered promoter entity is SIDDHIVINAYAK DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEPFS0586N1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GREEN VIEW?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GREEN VIEW?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GREEN VIEW?
The professionals named in the filing: Architect: AR NEHA PATIL; Architect: NEHA; Engineer: RUTVIJ PATEL; Chartered Accountant: CA DEVYANI SHEJWAL; Chartered Accountant: D P Shejwal and Associates; Chartered Accountant: MANISH K RAMAWATI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GREEN VIEW?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback