ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / GREEN VIEW APARTMENT

Registered No litigation declared Others project

GREEN VIEW APARTMENT

By DELIGHT DEVELOPERS

RG-MH-57300 · RERA P99000049207 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
16 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 60%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

GREEN VIEW APARTMENT is a Others project by DELIGHT DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000049207 on 3 Feb 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameGREEN VIEW APARTMENT
  • TypeOthers
  • Location
    • VILLAGE NILMORE
    • NA
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000049207
  • ReraGenie IDRG-MH-57300

Builder

  • NameDELIGHT DEVELOPERS
  • Entity typePartnership
  • PartnerMATHEW CORREIA
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3 WING CNA1514000
BUILDING NO 3 WING DNA1414000
BUILDING NO 3 WING ENA1514000
BUILDING NO 3 WING FNA1414000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 60%.

BUILDING NO 3 WING C36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING D47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks37%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING E36%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 WING F47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises16%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks37%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1388

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,388
Closed/Covered84
Open Space1,304
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 3 WING C21326347
BUILDING NO 3 WING D21326347
BUILDING NO 3 WING E21326347
BUILDING NO 3 WING F21326347

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,513 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SUMATINATH REALTORSVasai-Virar City (M Corp)Palghar
MR NARESH SUNDERLAL JAINVasai-Virar City (M Corp)Palghar
MS SUMATINATH REALTORSVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI-VIRAR CITY MUNICIPAL CORPORATION
Permissible FSI20005.92
Proposed, not sanctioned20,006 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNALLASOPARA WEST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA
EngineerMUKESH KUMAR
Chartered AccountantCA ANIL PARMAR
Chartered AccountantD D JAIN & CO
PartnerRole in project
DELIGHT DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1_ SEPT 25_ GREEN VIEW APARMENT.pdf5 Jun 2026
Form 2File: FORM 2_ SEPT 25_ GREEN VIEW APARMENT.pdf5 Jun 2026
Form 3File: FORM 3_ SEPT 25_ GREEN VIEW APARMENT_compressed.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEPT 25_ GREEN VIEW APARTMENT_compressed.pdf5 Jun 2026
Form 1File: FORM 1_MARCH 2026_ GREEN VIEW APARMENT.pdf5 Jun 2026
Form 2File: FORM 2_MARCH 2026_ GREEN VIEW APARMENT.pdf5 Jun 2026
Form 3File: FORM 3_MARCH 2026_ GREEN VIEW APARMENT_compressed.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 2026_ GREEN VIEW APARMENT_compressed.pdf5 Jun 2026
Form 1File: FORM 1_ DEC 25_ GREEN VIEW APARMENT.pdf18 Mar 2026
Form 2File: FORM 2_ DEC 25_ GREEN VIEW APARMENT.pdf18 Mar 2026
Form 3File: FORM 3_ DEC 25_ GREEN VIEW APARMENT_compressed.pdf18 Mar 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 25_ GREEN VIEW APARMENT_compressed.pdf18 Mar 2026
Form 1File: FORM 1_ SEPT 25_ GREEN VIEW APARMENT.pdf19 Jan 2026
Form 2File: FORM 2_ SEPT 25_ GREEN VIEW APARMENT.pdf19 Jan 2026
Form 3File: FORM 3_ SEPT 25_ GREEN VIEW APARMENT_compressed.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEPT 25_ GREEN VIEW APARTMENT_compressed.pdf19 Jan 2026
Form 1File: FORM 1_ JUNE 25_ GREEN VIEW APARMENT.pdf10 Oct 2025
Form 2File: FORM 2_ JUNE 25_ GREEN VIEW APARTMENT.pdf10 Oct 2025
Form 3File: FORM 3_ JUNE 25_ GREEN VIEW APARTMENT_compressed.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ GREEN VIEW APARTMENT_compressed.pdf10 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ DELIGHT DEVELOPER.pdf29 Sep 2025
Form 1File: FORM 1_ MARCH 25_ DELIGHT DEVELOPERS.pdf18 Jul 2025
Form 2File: FORM 2_ MARCH 25_ DELIGHT DEVELOPERS.pdf18 Jul 2025
Form 3File: FORM 3_ MARCH 25_ DELIGHT DEVELOPERS_compressed.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ DELIGHT DEVELOPERS_compressed.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24_compressed.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ dec 24_compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24_compressed.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24_compressed.pdf16 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_ MARCH 24_compressed.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ MARCH 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ JUNE 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 24_compressed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ JUNE 24_compressed.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ JUNE 24.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 24_compressed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ JUNE 24_compressed.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-GREEN VIEW APARTMNET_DEC 23.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-GREEN VIEW APARTMNET_DEC 23.pdf1 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-GREEN VIEW APARTMNET_DEC 23_compressed.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GREEN VIEW APARTMNET_DEC 23_compressed.pdf1 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-GREEN VIEW_MAR 23.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-GREEN VIEW_MAR 23.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-GREEN VIEW_22 23.pdf17 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-GREEN VIEW_22 23_compressed.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GREEN VIEW_MAR 23.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-GREEN VIEW_22 23.pdf17 Oct 2023
Building plan approvalFile: EF WING -SHEET 2 OF 3 (1).PDF27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: EF WING -SHEET 2 OF 3 (1).PDF27 Jan 2023
Other - TechnicalFile: EF WING -SHEET 2 OF 3.PDF20 Jan 2023
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf19 Jan 2023
Copy of the legal title reportFile: Flow of the title - Format A (2)_compressed.pdf19 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM -3 -1-7.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM -3 -8-14.pdf17 Jan 2023
Layout approvalFile: LAYOUT WITH MARKING_compressed.pdf14 Jan 2023
Building plan approvalFile: 1.pdf14 Jan 2023
Building plan approvalFile: 2.PDF14 Jan 2023
Building plan approvalFile: 3_compressed.pdf14 Jan 2023
Building plan approvalFile: 4.PDF14 Jan 2023
Building plan approvalFile: 5.PDF14 Jan 2023
PAN CardFile: COMPANY PAN.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES FINANCE.pdf14 Jan 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES FINANCE.pdf14 Jan 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL.pdf14 Jan 2023
Copy of Layout Approval (in case of layout)File: LAYOUT WITH MARKING_compressed.pdf14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 2.PDF14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.PDF14 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 5.PDF14 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC1 _compressed.pdf14 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC2 _compressed.pdf14 Jan 2023
Declaration about Commencement CertificateFile: C C.pdf14 Jan 2023
Declaration in FORM BFile: FORM B PROMOTER.pdf14 Jan 2023

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GREEN VIEW APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA3,200+ in Palghar

2 kmGREEN VIEW APARTMENTCompleted 58Lapsed / revoked 44Other 113Dot size: filed unitsN

Filed coordinates, straight-line distance. 215 registered projects within 2 km.

Builder: DELIGHT DEVELOPERS

DELIGHT DEVELOPERS has 6 registrations on MahaRERA, including ECO PARK and DREAM PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GREEN VIEW APARTMENT is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREEN VIEW APARTMENT?

The registered promoter entity is DELIGHT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREEN VIEW APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GREEN VIEW APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREEN VIEW APARTMENT?

The professionals named in the filing: Architect: SANAT MEHTA; Engineer: MUKESH KUMAR; Chartered Accountant: CA ANIL PARMAR; Chartered Accountant: D D JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN VIEW APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN VIEW APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN VIEW APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.