Green Rossette, Viva, Pirangut
By K Raheja Corp Real Estate Private Limited
RG-MH-41506 · RERA P52100053865 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 11 months past the filed date
- Litigation declared, 6 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Rossette, Viva, Pirangut is a Plotted project by K Raheja Corp Real Estate Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100053865 on 5 Dec 2023. Possession was promised by 15 Nov 2025 and is now 11 months past that date. 20 of the 22 units on this registration are recorded sold or booked.
At a glance
Project
- NameGreen Rossette, Viva, Pirangut
- TypePlotted
- Location
- Lavle Paud Road
- Aditya Nisarg
- Pirangut
- Mulshi
- Pune
- 412115
- Pincode412115
- RERA no.P52100053865
- ReraGenie IDRG-MH-41506
Builder
- NameK Raheja Corp Real Estate Private Limited
- Entity typeCompany
- CINU40300MH2007PTC287012
- GSTIN27AABCF1838M1ZF
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorsRavi Chandru Raheja, Neel Chandru Raheja, Sunil Madhav Hingorani, Ramesh Ranganathan
- Company SecretoryJignasha Thakkar
- Other registrations20 more →
- Completed1 of 21
- No longer live8 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Dec 2023
- Promised completion15 Nov 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed80 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 98% |
| Water conservation /Rain water harvesting | Yes | 88% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 4.78 cr | Rs 4.27 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Crystal Arch |
| Architect | Monali Bhagat |
| Engineer | Satish Vishnu Marathe |
| Engineer | Rahul Dalvi |
| Chartered Accountant | S N Doshi & Associates |
| Chartered Accountant | G.M. Kapadia &Co. |
| Chartered Accountant | G. M. Kapadia & Co. |
| Chartered Accountant | AKPJ & Associates |
| Partner | Role in project |
|---|---|
| K Raheja Corp Real Estate Private Limited | - |
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 2085/2010 | Civil Juge Senior Division | Ongoing |
| 224/2016 | Additional District Court | Ongoing |
| 972/2010 | High Court Bombay | Ongoing |
| 8022/2022 | High Court Bombay | Closed |
| 8023/2022 | High Court Bombay | Closed |
| 2085/2010 | Civil Judge Senior Division | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A Green Rossette.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 15102025.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 04122025.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 08122025.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Green Rossette 16072025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2_Green Rossette.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Green Rossette.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Green Rossette.pdf | 30 Sep 2025 |
| Form 2A (FY 2024-2025) | 27 Jun 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Green Rossette.pdf | 17 Apr 2025 |
| Layout approvalFile: Layout Viva compressed.pdf | 15 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Viva compressed.pdf | 15 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Viva.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Green Rossette.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration Green Rossette.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration Green Rossette.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration Green Rossette.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Green Rossette.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 The Glades.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Green Rossette.pdf | 12 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Condo Declaration Green Rossette.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Green Rossette.pdf | 16 Jan 2025 |
| Home Buyer /Allottee Grievance Redressal CellFile: Green Rossette.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Declaration GR.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration GR.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Declaration GR.pdf | 18 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Green Rossette.pdf | 18 Oct 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Green Rossette.pdf | 18 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Green Rossette.pdf | 10 Oct 2024 |
| Form 5 (FY 2023-2024)File: Form 5 Green Rossette.pdf | 30 Sep 2024 |
| PAN CardFile: PAN.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory disclosure_Green Rossette.pdf | 18 Jul 2024 |
| Proforma of Agreement for saleFile: AFS Green Rossette.pdf | 18 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - Quality Assurance certificate Green Rossette - March 24.pdf | 18 Jun 2024 |
| Other - LegalFile: Correction Application Green Rossette.pdf | 4 Jun 2024 |
| Other - LegalFile: Order Green Rossette.pdf | 4 Jun 2024 |
| Declaration in FORM BFile: Form B Green Rossette.pdf | 30 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Green Rossette.pdf | 30 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Green Rossette KRCREPL.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Green Rossette.pdf | 30 May 2024 |
| Other - LegalFile: NCLT Order.pdf | 30 May 2024 |
| Other - LegalFile: Scheme of Demerger compresseddd.pdf | 30 May 2024 |
| Disclosure of sold/ booked inventoryFile: Green_20240417162309.pdf | 18 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Mortgage Update Green Rossette.pdf | 19 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Mortgage Update Green Rossette.pdf | 19 Jan 2024 |
| Declaration about Commencement CertificateFile: CC Declaration Green Rossette.pdf | 19 Jan 2024 |
| CERSAI detailsFile: CERSAI Declaration Green Rossette.pdf | 19 Jan 2024 |
| Copy of the legal title reportFile: 00012.pdf | 28 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration for Finance with CERSAI.pdf | 14 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: 4 Details of Encumbrance Legal.pdf | 14 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Declaration for Finance with CERSAI.pdf | 14 Aug 2023 |
| Details of encumbrances concerned to LegalFile: 4 Details of Encumbrance Legal.pdf | 14 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200277282843_For_Asset_Based_Search_14_08_2023_11_40_39_225.pdf | 14 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Valecha.pdf | 14 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_001.pdf | 14 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank Account.pdf | 14 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf | 14 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: 11 Deviation Report Schedules.pdf | 14 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: 10 AFS Highlight 03082023.pdf | 14 Aug 2023 |
| Other - TechnicalFile: ARCHITECT CERTIFICATE GREEN ROSSETTE 14-08-2023.pdf | 14 Aug 2023 |
| Declaration about Commencement CertificateFile: Declaration for NA.pdf | 9 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Aug 2023 |
| Other - TechnicalFile: 3A Plan highlighted.pdf | 9 Aug 2023 |
| Other - TechnicalFile: DP Layout Highlight.pdf | 9 Aug 2023 |
| Other - TechnicalFile: Declaration for NA.pdf | 9 Aug 2023 |
| Building plan approval or NA orderFile: Declaration for NA.pdf | 8 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Declaration for NA.pdf | 8 Aug 2023 |
| Declaration about Commencement CertificateFile: 5 Declaration for CC.pdf | 8 Aug 2023 |
| Declaration in FORM BFile: 2 Form B.pdf | 8 Aug 2023 |
| Proforma of Allotment letterFile: 6 Allotment Letter.pdf | 8 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: 7 Deviation to Allotment Letter.pdf | 8 Aug 2023 |
| Layout approvalFile: Layout.pdf | 3 Aug 2023 |
| Building plan approval or NA orderFile: NA order dated 09092014.pdf | 3 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 3 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA order dated 09092014.pdf | 3 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 3 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 Aug 2023 |
| Proforma of Agreement for saleFile: AFS 03082023.pdf | 3 Aug 2023 |
| PAN CardFile: Pact PAN Card.pdf | 2 Aug 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PLOT NO.7, VIVA, PIRANGUTP52100002681 | Pirangut, Pune | Aug 2017 | Certificate Signed | Dec 2023 | Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 20 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Green Rossette, Viva, Pirangut on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Aditya Nisarg13,700+ in Pune
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: K Raheja Corp Real Estate Private Limited
K Raheja Corp Real Estate Private Limited has 21 registrations on MahaRERA, including Estrella, Viva, Pirangut and Orion, Viva, Pirangut. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 16 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Green Rossette, Viva, Pirangut shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Green Rossette, Viva, Pirangut is delayed beyond 15 Nov 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Rossette, Viva, Pirangut?
The registered promoter entity is K Raheja Corp Real Estate Private Limited, a company as per the filing. Its CIN U40300MH2007PTC287012 and GSTIN 27AABCF1838M1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Rossette, Viva, Pirangut?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green Rossette, Viva, Pirangut?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Rossette, Viva, Pirangut?
The professionals named in the filing: Architect: Crystal Arch; Architect: Monali Bhagat; Engineer: Satish Vishnu Marathe; Engineer: Rahul Dalvi; Chartered Accountant: S N Doshi & Associates; Chartered Accountant: G.M. Kapadia &Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Rossette, Viva, Pirangut?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback