Home / Browse projects / Nagpur, Maharashtra / Green Nook
Green Nook
RG-MH-12630 · RERA P50500045632 · Last updated on MahaRERA portal: 29 Jan 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Nook is a Residential / Group Housing project by UNIVERSAL HOUSE PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500045632 on 26 May 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 11 of the 18 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameGreen Nook
- TypeResidential / Group Housing
- Location
- NEERI Road
- Plot No. H-7
- Rani Laxmi Nagar
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440022
- Pincode440022
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500045632
- ReraGenie IDRG-MH-12630
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on26 May 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed111 files
Current status
Figures as on 29 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Green Nook | NA | 11 | 0 | 18 | 0 | 18 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
Green Nook: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 96% |
| Podiums (if any) | 0% |
| Plinth | 96% |
| Stilt Floor | 96% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 98% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities16
As on 29 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 93% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 96% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 92% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Passenger Lift | Yes | 92% |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Universal House Private Limited | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prashant Satpute |
| Engineer | Aspect Design |
| Chartered Accountant | Rodi Dabir & Co |
| Chartered Accountant | Akhil Rajendrakumar Darda |
| Partner | Role in project |
|---|---|
| UNIVERSAL HOUSE PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 May 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 May 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 May 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 05 FY202425 Grren Nook.pdf | 29 Jan 2026 |
| Form 1File: Form-01 GreenNook June 2025.pdf | 1 Oct 2025 |
| Form 2File: Form-02 GreenNook June 2025.pdf | 1 Oct 2025 |
| Form 3File: Form-03 GreenNook June 2025.pdf | 1 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Booking Status June 2025 Green Nook.pdf | 1 Oct 2025 |
| Self-declaration of Quarterly ProgressFile: QPR June 2025 Green Nook.pdf | 1 Oct 2025 |
| Occupational CertificateFile: Cert_6_80530_1528353_383_83.pdf | 20 Jul 2025 |
| Form 2A (FY 2024-2025) | 16 Jun 2025 |
| Form 1File: Form 1.pdf | 13 Jun 2025 |
| Form 2File: Form 2.pdf | 13 Jun 2025 |
| Form 3File: Form 03.pdf | 13 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Booking Status GN March2025.pdf | 13 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: QPR GN March2025.pdf | 13 Jun 2025 |
| OthersFile: Parking GN March2025.pdf | 13 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 December 2024_compressed.pdf | 11 Feb 2025 |
| Other - LegalFile: Parking December 2024.pdf | 11 Feb 2025 |
| Other - LegalFile: QPR Dec 2024.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Booking December 2024.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Dec 2024.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Dec 2024.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-05 FY 2023-24 Green Nook.pdf | 18 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-05 FY 2023-24 Green Nook.pdf | 18 Nov 2024 |
| Other - LegalFile: QPR Sept 2024 Green Nook.pdf | 28 Oct 2024 |
| Other - LegalFile: QPR June 2024 Green Nook.pdf | 28 Oct 2024 |
| Other - LegalFile: Parking Status Sept 2024 Green Nook.pdf | 28 Oct 2024 |
| Other - LegalFile: Parking Status June 2024 Green Nook.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Status June 2024 Green Nook.pdf | 28 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Status Sept 2024 Green Nook.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 June2024 Green Nook.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-03 Sept2024 Green Nook.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 June 2024 Green Nook.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Sept 2024 Green Nook.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 June 2024 Green Nook.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Sept 2024 Green Nook.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 7 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY2023-24 Green Nook .pdf | 7 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Status March 2024.pdf | 7 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 7 Jun 2024 |
| Other - LegalFile: Parking Status March 2024.pdf | 7 Jun 2024 |
| Other - LegalFile: QPR March 2024.pdf | 7 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Status GN Dec2023.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -03 Green Nook Dec2023.pdf | 24 Jan 2024 |
| Other - LegalFile: Parking Status GN Dec2023.pdf | 24 Jan 2024 |
| Other - LegalFile: QPR GN Dec2023.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-01 Green Nook Dec-2023.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-02 Green Nook Dec-2023.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-05 Green Nook FY 2022-23.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Booking Status March2023 Green Nook.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booking Status June2023 Green Nook.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Booking Status Sept2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: Booking Status March2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: QPR March2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: Booking Status June2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: QPR June2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: Booking Status Sept2023 Green Nook.pdf | 18 Oct 2023 |
| Other - LegalFile: QPR Sept2023 Green Nook.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01 Green Nook Sept2023.pdf | 10 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 Green Nook Sept2023.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 03 Green Nook Sept2023.pdf | 10 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 01 Green Nook June2023.pdf | 28 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 02 Green Nook June2023.pdf | 28 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Green Nook FY 2022-23.pdf | 28 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 03 Green Nook June2023.pdf | 28 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Green Nook Form-01 March 2023.pdf | 21 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Green Nook Form-02 March 2023.pdf | 21 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Green Nook Form-2A FY 2022-23.pdf | 21 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Green Nook Form-03 March 2023.pdf | 21 Jul 2023 |
| Details of encumbrancesFile: Encumbrance to Finance GN.pdf | 11 Apr 2023 |
| Details of encumbrances concerned to FinanceFile: Encumrance to Legal GN.pdf | 11 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Encumrance to Legal GN.pdf | 11 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Booking Sept2022 GN.pdf | 11 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Booking Dec2022 GN.pdf | 11 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay Kulkarni Annexure A.pdf | 11 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Ashish Kalode Annexure A.pdf | 11 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A GN.pdf | 11 Apr 2023 |
| Other - LegalFile: Booking June2022 GN.pdf | 11 Apr 2023 |
| Other - LegalFile: QPR Sept2022 GN.pdf | 11 Apr 2023 |
| Other - LegalFile: Booking Sept2022 GN.pdf | 11 Apr 2023 |
| Other - LegalFile: QPR Dec2022 GN.pdf | 11 Apr 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| 46 West Avenue | Plot No 46 Shivaji Nagar Nagpur 440010 | 16 | Completed | Dec 2023 | Dec 2023 |
| 11 up Apartments | 157 Shivaji Nagar Nagpur | 22 | Completed | Sep 2023 | Sep 2023 |
| CROSS WIND | PLOT NO 380 CORP HOUSE NO 597 SHEET NO 58 NORTH AMBAZARI ROAD GANDHI NAGAR NAGPUR | 12 | Completed | Dec 2021 | Dec 2021 |
| UNIVERSAL MOTIF | HOUSE NO 112 KHARE TOWN DHARAMPETH NAGPUR 440010 | 24 | Completed | Jun 2016 | Jun 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
Keep Green Nook on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Plot No. H-7, Rani Laxmi Nagar,2,800+ in Nagpur
Filed coordinates, straight-line distance. 81 registered projects within 2 km.
VEDANT BERYL
NANIS BUILDCON PRIVATE LIMITED
SHRILA APARTMENTS
MAXX BUILDER AND DEVELOPERS
USHA DEEPAK THOOL
USHA DEEPAK THOOL
SHREEKRISHNA HEMPRABHA
SHREE KRISHNA INFRAVENTURES
PIONEER ORION
PIONEER INFRASTRUCTURES COMPANY PRIVATE LI
SAPHALYA
DELTA DEVELOPERS
See every Nagpur project, with the district possession charts
Builder: UNIVERSAL HOUSE PVT. LTD.
UNIVERSAL HOUSE PVT. LTD. has 4 registrations on MahaRERA, including CROSS WIND and Universal 11 up Apartments. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Green Nook is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Nook?
The registered promoter entity is UNIVERSAL HOUSE PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Nook?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green Nook?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Nook?
The professionals named in the filing: Architect: Prashant Satpute; Engineer: Aspect Design; Chartered Accountant: Rodi Dabir & Co; Chartered Accountant: Akhil Rajendrakumar Darda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Nook?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.