Home / Browse projects / Pune, Maharashtra / Green Meadows Phase 1
Green Meadows Phase 1
By NANDAN RAINBOW REALTIES LLP
RG-MH-84041 · RERA P52100054816 · Last updated on MahaRERA portal: 11 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Litigation declared, 2 cases
- Completion date moved by 12 months
- 1 extension taken
- Rs 30.00 crore secured on the land, in favour of ICICI Bank
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green Meadows Phase 1 is a Residential / Group Housing project by NANDAN RAINBOW REALTIES LLP in Pune, Maharashtra, registered with MahaRERA as P52100054816 on 12 Feb 2024. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 15 of the 51 units on this registration are recorded sold or booked, and 63 of 77 construction stages are filed complete.
At a glance
Project
- NameGreen Meadows Phase 1
- TypeResidential / Group Housing
- Location
- Pachane
- Mawal
- Pune
- 412115
- Pincode412115
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054816
- ReraGenie IDRG-MH-84041
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on12 Feb 2024
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
- Buildings7 building records
- Documents filed104 files
Current status
Figures as on 11 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row House No 01 to 05 | NA | 2 | 2 | 5 | 0 | 5 |
| Row House No 06 to 10 | NA | 2 | 2 | 5 | 0 | 5 |
| Row House No 11 to 15 | NA | 2 | 2 | 5 | 0 | 5 |
| Row House No 43 to 51 | NA | 2 | 2 | 9 | 0 | 9 |
| Row House No 34 to 42 | NA | 2 | 2 | 9 | 0 | 9 |
| Row House NO 25 to 33 | NA | 2 | 2 | 9 | 0 | 9 |
| Row House No 16 to 24 | NA | 2 | 0 | 9 | 0 | 9 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
63 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Basement (if any), at 0%.
Row House No 01 to 0582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House No 06 to 1082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House No 11 to 1582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House No 43 to 5182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House No 34 to 4282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House NO 25 to 3382%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Row House No 16 to 2482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Row House No 01 to 05 | 5 | 5 |
| Row House No 06 to 10 | 5 | 5 |
| Row House No 11 to 15 | 5 | 5 |
| Row House No 43 to 51 | 9 | 9 |
| Row House No 34 to 42 | 9 | 9 |
| Row House NO 25 to 33 | 9 | 9 |
| Row House No 16 to 24 | 9 | 9 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Row House No 43 to 51 | NA | Rs 3.60 cr | Rs 3.38 cr |
| Row House No 34 to 42 | NA | Rs 3.60 cr | Rs 3.38 cr |
| Row House NO 25 to 33 | NA | Rs 3.60 cr | Rs 3.38 cr |
| Row House No 16 to 24 | NA | Rs 3.60 cr | Rs 3.38 cr |
| Row House No 01 to 05 | NA | Rs 2.00 cr | Rs 1.88 cr |
| Row House No 06 to 10 | NA | Rs 2.00 cr | Rs 1.88 cr |
| Row House No 11 to 15 | NA | Rs 2.00 cr | Rs 1.88 cr |
| - | NA | Rs 1.32 cr | Rs 1.20 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CRYSTAL ARCH |
| Engineer | SANTOSH RUNWAL |
| Chartered Accountant | PRITESH R NAHAR & ASSOCIATES |
| Chartered Accountant | SPCM and Associates |
| Partner | Role in project |
|---|---|
| NANDAN RAINBOW REALTIES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoteri)Due to Heavy Rainfall Roads leading to the site are usually flooded or damaged, thus restricting material transportation and worker movement ii) Wet and muddy conditions increase the risk of accidents, halting operations iii) Prolonged rain washed away work already completed or lead to water-logging, requiring rework iv) Workers from remote areas do not show up regularly due to transport issues, personal commitments, or weather conditions v) Last year being election year majority of labour went to their hometowns for voting, and also when the labour goes to hometown for festivals they are no
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 273/2019 | Civil Judge Jr Division Vadgaon Maval | Pending for WS |
| 116/2024 | Vadgaon Maval | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Feb 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - RH.pdf | 11 Jun 2026 |
| Withdrawal Update Form 2File: RH Form 2-.pdf | 11 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 11 Jun 2026 |
| Form 2A (FY 2026-2027)File: Form 2A- GM-RH-6-4-26.pdf | 11 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - RH.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: RH Form 2-.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 17 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_FINAL_GMP1 Dec25.pdf | 15 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Architech Certificate -July-25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Architech Certificate -Oct-25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Form - 2 Aug 2025_.pdf | 30 Oct 2025 |
| Withdrawal Update Form 2File: Form - 2 Oct 2025_.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Form - 3 Aug 25.pdf | 30 Oct 2025 |
| Withdrawal Update Form 3File: Form - 3 Oct 2025.pdf | 30 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form -2A-2024.pdf | 30 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form -2A-2023.pdf | 30 Oct 2025 |
| Form 2A (FY 2025-2026)File: Form - 2A Aug 2025.pdf | 30 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 Architech Certificate -July-25.pdf | 29 Oct 2025 |
| Withdrawal Update Form 2File: Form - 2 Aug 2025_.pdf | 29 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE.pdf | 29 Oct 2025 |
| Declaration in FORM BFile: Form B.pdf | 21 Jun 2025 |
| Declaration in FORM BFile: New Form B.pdf | 21 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New-Form 1.pdf | 21 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3.pdf | 21 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: new -Form -3.pdf | 21 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: new- Discolsure of sold -book inventory.pdf | 21 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: New-Form 5.pdf | 21 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 18 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: NEW SOLD UNSOLD.pdf | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 pdf.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nanadan Rainbow Realties LLP -Form 3-Sept-24- RH.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 .pdf | 5 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 5 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A.pdf | 5 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Dec-24.pdf | 17 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf | 17 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory.pdf | 17 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 17 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Engineer Certificate_compressed.pdf | 25 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 25 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 25 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- Quality Assurance.pdf | 25 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SIGNED- Green Meadows Phase-1.pdf | 25 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Exh- 1 and Order_compressed.pdf | 24 Oct 2024 |
| Details of encumbrances concerned to LegalFile: Exh- 1 and Order_compressed.pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crystal Arch Form 1 Architect's Certificate.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed (1).pdf | 26 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTARY.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 26 Jul 2024 |
| Copy of the legal title reportFile: Title Opinion Compressed.pdf | 14 May 2024 |
| Copy of the legal title reportFile: Supplementary Title Opinion Compressed.pdf | 14 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Green Meadows Ph 1 Form 1.pdf | 14 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Green Meadows Ph 1 - Form 2 08042024 Compressed.pdf | 14 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Green Meadows Ph 1 - Form 2A 08042024.pdf | 14 May 2024 |
| Disclosure of sold/ booked inventoryFile: Green Meadows Ph 1 Sold Booked.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Green Meadows Ph 1 - Form 3 18042024.pdf | 14 May 2024 |
| Proforma of Agreement for saleFile: Revised Agreement for sale of Row House 25-04-2024.pdf | 14 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised NA order.pdf | 21 Feb 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200297611713_For_Debtor_Based_Search_21_02_2024_12_56_15_029.pdf | 21 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement for sale of Row House.pdf | 21 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Phase 1.pdf | 21 Feb 2024 |
| Layout approvalFile: 02_06_page-0001 Edited Newest-2-1.pdf | 14 Feb 2024 |
| Building plan approvalFile: 03_06_GREEN_page-0001 Edit.pdf | 14 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: 02_06_page-0001 Edited Newest-2-1.pdf | 14 Feb 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 03_06_GREEN_page-0001 Edit.pdf | 14 Feb 2024 |
| Proforma of Agreement for saleFile: Agreement for sale of Row House Revised 14022024.pdf | 14 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report 14-02-2024.pdf | 14 Feb 2024 |
| Other - TechnicalFile: Annexure A.pdf | 31 Jan 2024 |
| Other - TechnicalFile: Declaration regarding plot area.pdf | 30 Jan 2024 |
| Other - TechnicalFile: Declaration regarding permissible and proposed FSI.PDF | 30 Jan 2024 |
| Layout approvalFile: Layout Plan.pdf | 26 Dec 2023 |
| Building plan approvalFile: Plan.pdf | 26 Dec 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 26 Dec 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf | 26 Dec 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Green Meadows Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pachane13,700+ in Pune
Avian Valley - Solaire
KAKADE ESTATE DEVELOPERS PVT. LTD.
Park Pebbles Phase I
M/s Rainbow Purple Construction LLP
Mahindra Rivenza Phase 2
Mahindra Lifespace Developers limited
Mahindra Rivenza Phase 1
Mahindra Lifespace Developers limited
FOREST TRAILS ATHASHRI B3
LAVIM DEVELOPERS PVT LTD
KOHINOOR WOODSHIRE
INTOFINITY PROMOTERS PRIVATE LIMITED
Builder: NANDAN RAINBOW REALTIES LLP
NANDAN RAINBOW REALTIES LLP has 3 registrations on MahaRERA, including Green Meadows Phase 2 and Green Meadows Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Green Meadows Phase 1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Green Meadows Phase 1 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green Meadows Phase 1?
The registered promoter entity is NANDAN RAINBOW REALTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green Meadows Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green Meadows Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green Meadows Phase 1?
The professionals named in the filing: Architect: CRYSTAL ARCH; Engineer: SANTOSH RUNWAL; Chartered Accountant: PRITESH R NAHAR & ASSOCIATES; Chartered Accountant: SPCM and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green Meadows Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback