Home / Browse projects / Nagpur, Maharashtra / GREEN ACRES

Registered No litigation declared Plotted project

GREEN ACRES

By ZEESHAN SHEIKH

RG-MH-46622 · RERA P50500053557 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
42 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

GREEN ACRES is a Plotted project by ZEESHAN SHEIKH in Nagpur, Maharashtra, registered with MahaRERA as P50500053557 on 10 Nov 2023. Possession is promised by 31 Dec 2027. 0 of the 42 units on this registration are recorded sold or booked.

At a glance

Project

  • NameGREEN ACRES
  • TypePlotted
  • Location
    • VELA
    • HARISHCHANDRA
    • Wela harichandra
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053557
  • ReraGenie IDRG-MH-46622

Builder

  • NameZEESHAN SHEIKH
  • Entity typeOthers
  • ProprietorZEESHAN SHEIKH FEROZ SHEIKH

Key dates

this monthRegisteredNov 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed93 files

Current status

0%0 of 42 units booked
22.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes68%
Water SupplyYes71%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes78%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes3%
Street LightingYes46%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,325 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Sep 2024
LandownerVillageDistrict
ZEESHAN SHEIKHNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI5325.72
Proposed, not sanctioned1 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 45-B, BALAJI PURAM LAV KUSH NAGAR, MANEWADA RING ROAD, NAGPUR-440024
Estimated costRs 1.35 cr
Cost incurredRs 29.75 lakh
Work done22.04%
BuildingWingEstimatedIncurred
-NARs 1.35 crRs 29.75 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM R SHELOTE & ASSOCIATES
EngineerM R SHELOTE & ASSOCIATES
Chartered AccountantSATISH CHOUDHARY
Chartered AccountantHIMESH DEMBLE
PartnerRole in project
ZEESHAN FEROZ SHEIKH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: ARCHITECT CERTIFICATE Jan to Mar.pdf20 Apr 2026
Form 2File: ENGINEER CERTIFICATE Jan to Mar.pdf20 Apr 2026
Form 3File: Chartered Accountant Certlficate Jan to Mar.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD IBOOKED INVENTORY.pdf20 Apr 2026
Form 1File: Form 1 ARCHITECTS CERTIFICATE Oct-25 to Dec-25.pdf27 Jan 2026
Form 2File: Form-2-ENGINEERS CERTIFICATE-Oct-25 to Dec-25.pdf27 Jan 2026
Form 3File: Form-3-Chartered Accountants Certificate-Oct-25 to Dec-25_compressed.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory.pdf27 Jan 2026
Form 1File: Form 1 Q2- July 25 To Sep 25.pdf6 Nov 2025
Form 2File: Form 2 Q2- July 25 To Sep 25.pdf6 Nov 2025
Form 3File: Form 3 Q2-July 25 To Sep 25.pdf6 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discouser Cert -Q2- July 25 To Sep 25.pdf6 Nov 2025
Form 5 (FY 2024-2025)File: GreenAcers Form5 (1).pdf30 Sep 2025
Form 1File: Form-1-April To June 25.pdf12 Sep 2025
Form 2File: Form-2-April To June 25.pdf12 Sep 2025
Form 3File: Form-3- April To June 25.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclouser Certificate-April To June 25.pdf12 Sep 2025
Form 1File: Form-1-Jan 25 To Mar 25.pdf12 Sep 2025
Form 2File: Form-2-Jan 25 To Mar 25.pdf12 Sep 2025
Form 3File: Form-3-Jan 25 To Mar 25.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclouser Certificate -Jan 25 To Mar 25.pdf12 Sep 2025
Form 1File: Form-1-Oct 24 To Dec 24.pdf12 Sep 2025
Form 2File: Form-2-Oct To Dec 24.pdf12 Sep 2025
Form 3File: Form-3-Oct 24 To Dec 24.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclouser Certificate-Oct 24 To Dec 24.pdf12 Sep 2025
OthersFile: Form-2A-Oct To Dec 24.pdf12 Sep 2025
Form 1File: FORM-1-July 24 To Sep 24.pdf12 Sep 2025
Form 2File: FORM-2-July 24 To Sep 24.pdf12 Sep 2025
Form 3File: Form-3-July 24 To Sep 24.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclouser Certificate - July 24 To Sep 24.pdf12 Sep 2025
OthersFile: Form-2A-July 24 To Sep 24.pdf12 Sep 2025
Form 1File: Form-1 -April 24 To June 24.pdf12 Sep 2025
Form 2File: Form-2-April-24 to June-24.pdf12 Sep 2025
Form 3File: Form 3-April-24 to June-24.pdf12 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosuer Certificate-April 24 To June 24.pdf12 Sep 2025
OthersFile: Form-2A-April 24 To June 24.pdf12 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Jan-25 to March-25.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered Accountant's Certilicate-Jan-25 to Mar-25.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Jan-25 to Mar-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory-Jan-25 to Mar-25.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineers Certificate on Quality Assurance-Form-2A-Jan-25 to Mar-25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS CERTIFICATE.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf8 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SITE SUPERVISOR CERTIFICATE.pdf8 Feb 2025
Details of encumbrances concerned to FinanceFile: FINA.pdf4 Feb 2025
Details of encumbrances concerned to LegalFile: FINA.pdf4 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: SEC UNS.pdf4 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosuer of sold unsold-APRIL TO JUNE 24.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Discloser of Sold unsold-JULY TO SEP 24.pdf24 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5-AY-2023-24_compressed.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-Architecture-July-24 to Sep-24-compressed.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-CA-July-24 to Sep-24-compressed.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-ENGINER-July-24 to Sep-24.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A-compressed.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 -Architect-April-24 to June-24.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Final-April-24 to June-24.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2-Eng-April-24 to June-24.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A.pdf7 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC-Form-1-Jan to Mar.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC-Form-1-Jan to Mar.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-Signed-Uploaded.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1.pdf7 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2.pdf7 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf7 Feb 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf7 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf12 Oct 2023
Declaration in FORM BFile: Form-B.pdf23 Sep 2023
CERSAI detailsFile: CERSAI_ON LETTERHEAD.pdf23 Sep 2023
CERSAI detailsFile: CERSAI_ON LETTERHEAD.pdf23 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf23 Sep 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE_PLOT .pdf19 Sep 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf24 Aug 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf24 Aug 2023
Copy of the legal title reportFile: Sale Deed.pdf11 Aug 2023
Copy of the legal title reportFile: Deed of Exchange.pdf11 Aug 2023
Copy of the legal title reportFile: Development Agreement.pdf11 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf11 Aug 2023

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GREEN ACRES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HARISHCHANDRA2,800+ in Nagpur

2 kmGREEN ACRESCompleted 9Lapsed / revoked 7Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: ZEESHAN SHEIKH

ZEESHAN SHEIKH has 1 registration on MahaRERA, including GREEN ACRES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GREEN ACRES is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GREEN ACRES?

The registered promoter entity is ZEESHAN SHEIKH, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GREEN ACRES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GREEN ACRES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GREEN ACRES?

The professionals named in the filing: Architect: M R SHELOTE & ASSOCIATES; Engineer: M R SHELOTE & ASSOCIATES; Chartered Accountant: SATISH CHOUDHARY; Chartered Accountant: HIMESH DEMBLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GREEN ACRES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GREEN ACRES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GREEN ACRES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.