Home / Browse projects / Nashik, Maharashtra / GOVIND RIVERINE
GOVIND RIVERINE
RG-MH-38364 · RERA P51600053590 · Last updated on MahaRERA portal: 23 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOVIND RIVERINE is a Residential / Group Housing project by GOVIND BHAUSAHEB MADHWAI in Nashik, Maharashtra, registered with MahaRERA as P51600053590 on 10 Nov 2023. Possession is promised by 1 Jan 2028. 1 of the 35 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameGOVIND RIVERINE
- TypeResidential / Group Housing
- Location
- MAKHMALABAD SHIVAR
- Nashik (M Corp.)
- Nashik
- 422003
- Pincode422003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600053590
- ReraGenie IDRG-MH-38364
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Nov 2023
- Promised completion1 Jan 2028
- Revised completionNone
- Buildings2 building records
- Documents filed47 files
Current status
Figures as on 23 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GOVIND RIVERINE WING A | NA | 10 | 10 | 28 | 0 | 28 |
| GOVIND RIVERINE WING B | NA | 10 | 10 | 7 | 0 | 7 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 30%.
GOVIND RIVERINE WING A30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOVIND RIVERINE WING B30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed112
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| GOVIND RIVERINE WING A | 84 | 84 |
| GOVIND RIVERINE WING B | 28 | 28 |
Land and ownership13
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| GOVIND BHAUSAHEB MADHWAI | Nashik (M Corp.) | Nashik |
| GANESH BALASAHEB TIDKE | Nashik (M Corp.) | Nashik |
| PANDHARINATH RAMCHANDRA TIDKE | Chandshi | Nashik |
| TUSHAR PANDHARINATH TIDKE | Chandshi | Nashik |
| PRASHANT KANTILAL TIDKE | Chandshi | Nashik |
| SHIVAM KANTILAL TIDKE | Chandshi | Nashik |
| DEEPAK ANANT TIDKE | Chandshi | Nashik |
| SAGAR SAHEBRAO TIDKE | Chandshi | Nashik |
| NILESH GORAKHNATH TIDKE | Chandshi | Nashik |
| NAMDEV LAXMAN TIDKE | Chandshi | Nashik |
| BALASAHEB KISARAO TIDKE | Chandshi | Nashik |
| RAJENDRA KISAN TIDKE | Chandshi | Nashik |
| HRUSHIKESH RAJENDRA TIDKE | Chandshi | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amar Madhwai & Associates |
| Engineer | Pankaj Madhwai & Asso. |
| Chartered Accountant | Vikas Kisan Hase |
| Partner | Role in project |
|---|---|
| GOVIND BHAUSAHEB MADHWAI | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Jan 2028
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1.pdf | 23 May 2026 |
| Form 2File: Form 2.pdf | 23 May 2026 |
| Form 3File: Form 3 CA Certificate.pdf | 23 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory.pdf | 23 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 Engineer certificate.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 Engineer certificate.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 3 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 1 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf | 1 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect Certificate.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer certificate.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 27 09 2023.pdf | 27 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Seperate Bank Account IFSC.pdf | 27 Sep 2023 |
| Copy of the legal title reportFile: RERA Title - 144-16_compressed.pdf | 11 Aug 2023 |
| Layout approvalFile: Building plan 1_compressed.pdf | 9 Aug 2023 |
| Layout approvalFile: Building plan 2_compressed.pdf | 9 Aug 2023 |
| Building plan approvalFile: Commencement Certificate 16.pdf | 9 Aug 2023 |
| PAN CardFile: PAN.pdf | 9 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrances concerned to Finance AND lEGAL.pdf | 9 Aug 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrances concerned to Finance AND lEGAL.pdf | 9 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Building plan 1_compressed.pdf | 9 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Building plan 2_compressed.pdf | 9 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement Certificate 16.pdf | 9 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 16.pdf | 9 Aug 2023 |
| Declaration about Commencement CertificateFile: Form D DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 9 Aug 2023 |
| Declaration in FORM BFile: Form B.pdf | 9 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 9 Aug 2023 |
| CERSAI detailsFile: CERSAI UNDERTAKING.pdf | 9 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf | 9 Aug 2023 |
| Proforma of Agreement for saleFile: Model Form of Agreement.pdf | 9 Aug 2023 |
| Proforma of Allotment letterFile: Allotment letter.pdf | 9 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: deviations of the allotment letter.pdf | 9 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviations agreement for sale.pdf | 9 Aug 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GOVIND ENCLAVE | 241 2 B 1 6 Nashik | 22 | Completed | Jun 2023 | Dec 2021 |
| GOVIND ELITE | S. No. 320 1 5 321 JATRA NANDUR ROAD Adgaon Nashik | 28 | Completed | Jan 2023 | Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GOVIND RIVERINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAKHMALABAD SHIVAR4,100+ in Nashik
Filed coordinates, straight-line distance. 90 registered projects within 2 km.
THE PLATINUM MALL BY PARKSYDE
JAIKUMAR CONSTRUCTIONS LTD
AVADH UTOPIA
DHATRAK CONSTRUWELL
ROONGTA ELEGANTE APARTMENT
ROONGTA LANDMARKS LLP
Siddhivinayak Trade Center
Dhatrak Constructions
G SQUARE
GIRI ASSOCIATE CONSTRUCTION
SADGURU HOMES
SHREE SADGURU HOMES
See every Nashik project, with the district possession charts
Builder: GOVIND BHAUSAHEB MADHWAI
GOVIND BHAUSAHEB MADHWAI has 8 registrations on MahaRERA, including GOVIND GALAXY and GOVIND PLAZA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if GOVIND RIVERINE is delayed beyond 1 Jan 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOVIND RIVERINE?
The registered promoter entity is GOVIND BHAUSAHEB MADHWAI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOVIND RIVERINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOVIND RIVERINE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOVIND RIVERINE?
The professionals named in the filing: Architect: Amar Madhwai & Associates; Engineer: Pankaj Madhwai & Asso.; Chartered Accountant: Vikas Kisan Hase. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOVIND RIVERINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback