Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
6 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Govind Chintamani is a Others project by Priyal Spaces in Raigarh, Maharashtra, registered with MahaRERA as P52000053263 on 23 Oct 2023. Possession is promised by 31 Dec 2026. 14 of the 20 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameGovind Chintamani
  • TypeOthers
  • Location
    • old thana naka road
    • old panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053263
  • ReraGenie IDRG-MH-06557

Builder

  • NamePriyal Spaces
  • Entity typePartnership
  • PartnersUsha Kiran Raina, Purvi Gandhi, Jayesh Gandhi

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

70%14 of 20 units booked
100.0%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Govind ChintamaniNA7715520

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Govind Chintamani: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed11

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots11
Closed/Covered11

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area451 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jan 2026
LandownerVillageDistrict
Mr Arun Dattatraya GadrePanvelRaigarh
Mr Anil DamlePanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI1170.16
Proposed, not sanctioned1,170 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchshivaji chowk, panvel
Estimated costRs 3.45 cr
Cost incurredRs 3.45 cr
Work done100.0%
BuildingWingEstimatedIncurred
Govind ChintamaniNARs 3.15 crRs 3.15 cr
-NARs 30.00 lakhRs 30.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDevise Design
EngineerDesTech Structural Consultants Bhauso Desai
EngineerJayesh Gandhi
Chartered AccountantViral Jain & Associates
PartnerRole in project
Priyal Spaces-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form No 1 Govind Chintamani 31 03 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form No 2 Govind Chitamani 31 03 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form No 3 Govind Chintamani 31 03 2026.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: form no 2A 2025-26.pdf24 Apr 2026
Withdrawal Update Form 1File: From No 1 31 12 2025 Govind chintamani.pdf4 Feb 2026
Withdrawal Update Form 2File: From No 2 Govind Chintamani 31 12 2025.pdf4 Feb 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate.pdf4 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A_ Govind Chintamani 2024-25.pdf4 Feb 2026
Withdrawal Update Form 1File: Form no 1 Architect certificate 30 06 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate 30 09 2025.pdf3 Feb 2026
Withdrawal Update Form 2File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf3 Feb 2026
Withdrawal Update Form 2File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf3 Feb 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf3 Feb 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 09 2025 Govind Chintamani.pdf3 Feb 2026
Withdrawal Update Form 1File: Form no 1 Architect certificate 30 06 2025.pdf30 Jan 2026
Withdrawal Update Form 1File: Form no 1 Architect certificate 30 06 2025.pdf30 Jan 2026
Withdrawal Update Form 2File: Form No 2 Engineer Certificate 30 06 2025 Govind Chintamani.pdf30 Jan 2026
Withdrawal Update Form 2File: Form No 2 Engineer Certificate 30 06 2025 Govind Chintamani.pdf30 Jan 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf30 Jan 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf30 Jan 2026
Form 2A (FY 2023-2024)File: Form 2A_ Govind Chintamani 2023-24.pdf30 Jan 2026
Form 5 (FY 2023-2024)File: Form 2A_ Govind Chintamani 2023-24.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 15052024.pdf14 Jan 2026
Withdrawal Update Form 1File: Form 1 15052024.pdf14 Jan 2026
Withdrawal Update Form 2File: Form No 2 Engineer Certificate 30 06 2025 Govind Chintamani.pdf14 Jan 2026
Withdrawal Update Form 2File: Form No 2 Engineer Certificate 30 06 2025 Govind Chintamani.pdf14 Jan 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf14 Jan 2026
Withdrawal Update Form 3File: Form No 3 C A Certificate 30 06 2025 Govind Chintamani_compressed.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: Priyal Spaces - Form-5 - FY 24-25.pdf14 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate 24012025.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 certificate 07032025.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Engineer Certificate 31122024.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 161024.pdf11 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 161024_compressed.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 161024.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 15052024.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form No 2 Engineer Certificate 03062024.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062024-compressed.pdf25 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Disclosure RERA.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Priyal Spaces 030624compressed.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1st Slab Completion Final Plot 57_4 .pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 4th slab Completion for Chintamani 57_4.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Plot 57-4 Form 2 Format - No 2.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Plot 57-4 Form 2 Format - No 4.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certicate form Mo 3.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Priyal spaces form no 3-compressed.pdf11 Oct 2023
Copy of the legal title reportFile: Title Report GOVIND CHINTAMANI.pdf7 Oct 2023
Details of encumbrances concerned to FinanceFile: Encrumbrance letter.pdf4 Oct 2023
Details of encumbrances concerned to LegalFile: Encrumbrance letter.pdf4 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Priyal spaces).pdf27 Sep 2023
Other - TechnicalFile: Authenticity of CC from town planning authority PMC.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Finance.pdf18 Sep 2023
Details of encumbrances concerned to LegalFile: Encumbrance Finance.pdf18 Sep 2023
Proforma of Agreement for saleFile: Final Sale Agreement for RERA Chintamani.pdf17 Sep 2023
Proforma of Allotment letterFile: Model form of allotment letter.pdf5 Sep 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Fomat A Seperate Bank Account .pdf5 Sep 2023
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf5 Sep 2023
Layout approvalFile: chintamani0001_compressed.pdf2 Sep 2023
Building plan approvalFile: chintamani_compressed.pdf2 Sep 2023
Copy of Layout Approval (in case of layout)File: chintamani0001_compressed.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: chintamani_compressed.pdf2 Sep 2023
Declaration about Commencement CertificateFile: img20230831_16350217.pdf2 Sep 2023
CERSAI detailsFile: cersai declaration.pdf2 Sep 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for Sale.pdf2 Sep 2023
PAN CardFile: PRIYAL SPACES PAN CARD.pdf31 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: C C Govind Chintamani.pdf31 Aug 2023
Declaration in FORM BFile: Affidavit cum declaration (Priyal Spaces).pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CHINTAMANI_57_4_ARCHITECT_CERT_050723.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_s Certificate Form 1 - Chintamani 57_4.pdf31 Aug 2023

How this compares with Raigarh

70%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Govind Chintamani on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near old panvel5,900+ in Raigarh

2 kmGovind ChintamaniCompleted 182Lapsed / revoked 66Other 162Dot size: filed unitsN

Filed coordinates, straight-line distance. 410 registered projects within 2 km.

Builder: Priyal Spaces

Priyal Spaces has 1 registration on MahaRERA, including Govind Chintamani. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Govind Chintamani is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Govind Chintamani?

The registered promoter entity is Priyal Spaces, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Govind Chintamani?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Govind Chintamani?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Govind Chintamani?

The professionals named in the filing: Architect: Devise Design; Engineer: DesTech Structural Consultants Bhauso Desai; Engineer: Jayesh Gandhi; Chartered Accountant: Viral Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Govind Chintamani?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Govind Chintamani. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Govind Chintamani to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.