GOLDEN WINDS Building A Phase 4

By GOLDEN BRICKS DEVELOPERS

RG-MH-11768 · RERA P52100003838 · Last updated on MahaRERA portal: 13 Mar 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 75%
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

GOLDEN WINDS Building A Phase 4 is a Commercial project by GOLDEN BRICKS DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100003838 on 6 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameGOLDEN WINDS Building A Phase 4
  • TypeCommercial
  • Location
    • Porwal Road
    • Lohegaon
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411047
  • Pincode411047
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003838
  • ReraGenie IDRG-MH-11768

Builder

  • NameGOLDEN BRICKS DEVELOPERS
  • Entity typePartnership
  • PartnersMahendra Giridharilal Nahar, Shashikala Ashok Kankariya
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Aug 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed130 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOLDEN WINDS Building A Phase 4NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 75%.

GOLDEN WINDS Building A Phase 4: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 13 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership25

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area288 sq m
Land owned byThe promoter, with other names on the file
Named landowners25
LandownerVillageDistrict
Baban Tukaram MurkuteLOHGAONPune
Sanjay Baban MurkuteLOHGAONPune
Sanjay B MurkuteLOHGAONPune
Rajendra Baban MurkuteLOHGAONPune
Rajendra B MurkuteLOHGAONPune
Nitin Baban MurkuteLOHGAONPune
Nitin B MurkuteLOHGAONPune
Sachin Baban MurkuteLOHGAONPune
Rupali Vilas GarudLOHGAONPune
Pranal Raghunath NaleBhosariPune
Dinesh Uttam TilekarMANJARI BkPune
Deepak Ambadas MaliBhosariPune
Santosh Uttam TilekarMANJARI BkPune
Eknath Balu KhuleLOHGAONPune
Nalini Balasaheb MurkuteLOHGAONPune
Nalini B MurkuteLOHGAONPune
Eknath B KhuleLOHGAONPune
Omkar Balasaheb MurkuteLOHGAONPune
Omkar B MurkuteLOHGAONPune
Sachin B MurkuteLOHGAONPune
Rupali V GarudLOHGAONPune
Pranal R NaleBhosariPune
Dinesh U TilekarMANJARI BkPune
Santosh U TilekarMANJARI BkPune
Deepak A MaliBhosariPune

Approvals and building plan

Permissible FSI1336.76
Proposed, not sanctioned906 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSENAPATI BAPAT ROAD PUNE 411016

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPandit Joshi & Associates
EngineerG A Bhilare Consultants Pvt Ltd
PartnerRole in project
GOLDEN BRICKS DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100003928Dec 2019 → Dec 2020

Reason as filed by the promoterSanction of additional floor led to construction delay

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jan 2022

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: A- Building Rera uploading13.pdf13 Mar 2022
Disclosure of sold/ booked inventoryFile: A- Building Rera uploading13.pdf13 Mar 2022
Architect’s Certificate on Completion of Project (Form 4)File: Form -4 - A --compressed.pdf10 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: IMG-20220105-WA0016.pdf8 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A- Bldg - Certificate.pdf3 Jan 2022
Disclosure of sold/ booked inventoryFile: A-Building DISCOLSURE OF SOLD BOOKED INVENTORY.pdf3 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC_-_GOLDEN_WINDS.pdf14 Oct 2021
Layout approvalFile: GOLDEN_WINDS_1.pdf19 Aug 2021
Layout approvalFile: GOLDEN_WINDS_1.pdf19 Aug 2021
Layout approvalFile: GOLDEN_WINDS_2.pdf19 Aug 2021
Layout approvalFile: GOLDEN_WINDS_3.pdf19 Aug 2021
Building plan approvalFile: GOLDEN_WINDS_1.pdf19 Aug 2021
Building plan approvalFile: GOLDEN_WINDS_2.pdf19 Aug 2021
Building plan approvalFile: GOLDEN_WINDS_3.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: GOLDEN_WINDS_1.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: GOLDEN_WINDS_1.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: GOLDEN_WINDS_2.pdf19 Aug 2021
Copy of Layout Approval (in case of layout)File: GOLDEN_WINDS_3.pdf19 Aug 2021
Building Plan Approval (IOD)File: GOLDEN_WINDS_1.pdf19 Aug 2021
Building Plan Approval (IOD)File: GOLDEN_WINDS_2.pdf19 Aug 2021
Building Plan Approval (IOD)File: GOLDEN_WINDS_3.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC-_BLACK_AND_WHITE.pdf19 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC-_BLACK_AND_WHITE.pdf19 Aug 2021
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 08-07-2021.pdf27 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: A-Build C A Certificate Nov 2019.pdf27 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA 5 2018 19 MAR 19.pdf22 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Golden Bricks Developers - RERA certificate.pdf22 Jul 2021
OtherFile: LHE-0003-17 Revised.pdf13 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A)File: Quality Assurance Certificate 08-07-2021.pdf8 Jul 2021
OtherFile: Partial Completion Certificate_by_Architect.pdf30 Jun 2021
OtherFile: Partial Occupancy_Application A Building.pdf30 Jun 2021
Disclosure of sold/ booked inventoryFile: A- Building Rera uploading-converted.pdf5 Jun 2021
Disclosure of sold/ booked inventoryFile: A- Building Rera uploading-converted.pdf5 Jun 2021
Certificates of CA (Form 5)File: Golden Bricks Developers - RERA certificate.pdf18 Mar 2021
Layout approvalFile: 01-15.pdf14 Mar 2021
Building plan approvalFile: 02-15.pdf14 Mar 2021
Building plan approvalFile: 01-15.pdf14 Mar 2021
Building plan approvalFile: 03-15.pdf14 Mar 2021
Copy of Layout Approval (in case of layout)File: 01-15.pdf14 Mar 2021
Building Plan Approval (IOD)File: 02-15.pdf14 Mar 2021
Building Plan Approval (IOD)File: 01-15.pdf14 Mar 2021
Building Plan Approval (IOD)File: 03-15.pdf14 Mar 2021
Building plan approvalFile: 01-15.pdf11 Mar 2021
Building Plan Approval (IOD)File: 01-15.pdf11 Mar 2021
Building plan approvalFile: Sanction plan 2 of 15.pdf4 Mar 2021
Building Plan Approval (IOD)File: Sanction plan 2 of 15.pdf4 Mar 2021
Certificates of CA (Form 5)File: C A Certificate.pdf20 Nov 2019
Engineers Certificate on Quality Assurance (Form 2A)File: Building A Form 24.pdf17 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA_-_Bldg_-_A.pdf15 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1_1 july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1_1 july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A3_july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A2_july.pdf3 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A_1.pdf13 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A1_1.pdf13 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A2_1.pdf13 May 2019
Copy of the legal title reportFile: Additional Search Report 2019-04-04.pdf4 Apr 2019
Copy of the legal title reportFile: Additional Search Report 2019-04-04 2.pdf4 Apr 2019
Details of encumbrancesFile: Mortgage Deed Part 1.pdf23 Mar 2019
Details of encumbrancesFile: Mortgage Deed Part 1.pdf23 Mar 2019
Details of encumbrancesFile: Mortgage Deed Part 1.pdf23 Mar 2019
Details of encumbrancesFile: Mortgage Deed Part 2.pdf23 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg1.pdf9 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg2.pdf9 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Quality Certificate pg3.pdf9 Mar 2019
OtherFile: A building Plinth Checking_1.pdf30 Jan 2019
Certificates of CA (Form 5)File: CA A1.pdf12 Dec 2018
Certificates of CA (Form 5)File: CA A2.pdf12 Dec 2018
Copy of the legal title reportFile: Title 30-10-2018.pdf17 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: NEW CC 30-10-2018.pdf17 Nov 2018
Layout approvalFile: PROJECT LAYOUT -11.pdf21 Oct 2018
Building plan approvalFile: A BLDG.pdf21 Oct 2018
Copy of Layout Approval (in case of layout)File: PROJECT LAYOUT -11.pdf21 Oct 2018
Building Plan Approval (IOD)File: A BLDG.pdf21 Oct 2018
Layout approvalFile: plan 1-16.pdf10 Mar 2018
Building plan approvalFile: plan 2-16.pdf10 Mar 2018
Copy of Layout Approval (in case of layout)File: plan 1-16.pdf10 Mar 2018
Building Plan Approval (IOD)File: plan 2-16.pdf10 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: 298 Commencement Certificate.pdf10 Mar 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
GOLDEN WINDS Building C Phase 1Survey Number 298 2A Part Opposite D Y Patil Knowledge City Gate Lohegaon Pune 41104716CompletedJan 2017Late, Mar 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOLDEN WINDS Building A Phase 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lohegaon13,700+ in Pune

2 kmGOLDEN WINDS Building A Completed 46Lapsed / revoked 13Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: GOLDEN BRICKS DEVELOPERS

GOLDEN BRICKS DEVELOPERS has 4 registrations on MahaRERA, including GOLDEN WINDS Building B Phase 3 and GOLDEN WINDS Building E Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GOLDEN WINDS Building A Phase 4 is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOLDEN WINDS Building A Phase 4?

The registered promoter entity is GOLDEN BRICKS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOLDEN WINDS Building A Phase 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOLDEN WINDS Building A Phase 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOLDEN WINDS Building A Phase 4?

The professionals named in the filing: Architect: Pandit Joshi & Associates; Engineer: G A Bhilare Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOLDEN WINDS Building A Phase 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOLDEN WINDS Building A Phase 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOLDEN WINDS Building A Phase 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.