Home / Browse projects / Parbhani, Maharashtra / GOKULDHAM HEIGHT
GOKULDHAM HEIGHT
RG-MH-69356 · RERA P51300031088 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 22 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Parbhani registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOKULDHAM HEIGHT is a Residential / Group Housing project by KAILASH DAYARAM JETHWANI in Parbhani, Maharashtra, registered with MahaRERA as P51300031088 on 5 Oct 2021. The registration is recorded completed; possession was promised by 16 Jun 2026. The completion date has moved by 22 months from the original filing. 24 of the 31 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameGOKULDHAM HEIGHT
- TypeResidential / Group Housing
- Location
- PLOT NO 55 AND 56
- S.NO.277/1
- KAREGAON ROAD
- Parbhani (M Cl)
- Parbhani
- 431401
- Pincode431401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51300031088
- ReraGenie IDRG-MH-69356
Builder
- NameKAILASH DAYARAM JETHWANI
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Oct 2021
- Promised completion16 Jun 2026
- Revised completionRevised to 16 Jun 2026 (originally 31 Aug 2024)
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GOKULDHAM HEIGHT | NA | 6 | 6 | 17 | 14 | 31 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
GOKULDHAM HEIGHT: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GOKULDHAM HEIGHT | NA | Rs 3.67 cr | Rs 2.91 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SPIRO DESIGNS |
| Engineer | VInayak Bhange |
| Chartered Accountant | SNGP & Co. |
| Chartered Accountant | ALKESH RAWKA AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| KAILASH DAYARAM JETHWANI | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterLack of Demand and Construction in not yet completed
Reason as filed by the promoterThe details are mentioned in file name Reasoning
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf | 15 Jun 2026 |
| Occupational CertificateFile: 04122016202847.pdf | 15 Jun 2026 |
| Occupational CertificateFile: 04122016202935.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 2024-25 Q4 Sign.pdf | 21 Aug 2025 |
| Form 1File: fORM 1.pdf | 16 Aug 2025 |
| Form 2File: fORM 2.pdf | 16 Aug 2025 |
| Form 3File: F3.pdf | 16 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf | 16 Aug 2025 |
| Declaration and undertaking (Annexure A)File: Annexure A.pdf | 12 Jun 2025 |
| Form 1 | 2 Jun 2025 |
| Form 2File: Form 2 2024-25 Q3.pdf | 2 Jun 2025 |
| Form 3File: Form 3 2024-25 Q3 Sign.pdf | 2 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q3.pdf | 2 Jun 2025 |
| Form 1File: Form 1 2024-25 Q4.pdf | 2 Jun 2025 |
| Form 2File: Form 2 2024-25 Q4.pdf | 2 Jun 2025 |
| Form 3File: Form 3 2024-25 Q4 Sign.pdf | 2 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4.pdf | 2 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Architects Certificate.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Engineer Certificate _1.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form2A_2022.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A_2023.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A_2024.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Pert.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PERT Chart 2 .pdf | 18 Nov 2024 |
| Other - TechnicalFile: PERT Chart 2 .pdf | 18 Nov 2024 |
| Other - TechnicalFile: FORM 1 - Pert.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PERT Chart 2 .pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Pert.pdf | 18 Nov 2024 |
| Other - TechnicalFile: PERT Chart 2 .pdf | 18 Nov 2024 |
| Other - TechnicalFile: FORM 1 - Pert.pdf | 18 Nov 2024 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 8 Nov 2024 |
| Other - TechnicalFile: PERT CHART.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_.pdf | 7 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_LATEST.pdf | 7 Nov 2024 |
| Declaration in FORM BFile: Form B.pdf | 6 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Update 2.pdf | 6 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Update 1.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_30-09-2024.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_31-10-2024.pdf | 6 Nov 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200326576772_For_Asset_Based_Search_05_11_2024_16_23_19_318.pdf | 6 Nov 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK.pdf | 6 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Form 3 Final.pdf | 23 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 23-24.pdf | 23 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 10 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2023.pdf | 10 Oct 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE18052023.pdf | 5 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY27052023.pdf | 5 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 ANNUAL REPORT18052023.pdf | 5 Jun 2023 |
| Proforma of Agreement for saleFile: GetUserDocumentFileContent.pdf | 5 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: DETAILS_OF_ENCUMBRANCES_CONCERNED_TO_LEGAL18052023.pdf | 19 May 2023 |
| Details of encumbrances concerned to LegalFile: DETAILS_OF_ENCUMBRANCES_CONCERNED_TO_LEGAL18052023.pdf | 19 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1_ARCHITECT_CERTIFICATE18052023_11zon.pdf | 19 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_ENGINEER_CERTIFICATE18052023.pdf | 19 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM_2A_2022.pdf | 19 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_OF_INTREST_IN_OTHER_REAL_ESTATE_ORG18052023.pdf | 19 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK_ACCOUNT_FOR_REAL_ESTATE_PROJECTS18052023.pdf | 19 May 2023 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT_LETTER18052023.pdf | 19 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: MODEL_COPY_OF_AGREEMENT18052023.pdf | 19 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert.pdf | 21 Feb 2023 |
| Layout approvalFile: 277 layout plan_compressed.pdf | 30 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: 277 layout plan_compressed.pdf | 30 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Parbhani
Computed across the 29 Parbhani projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
Keep GOKULDHAM HEIGHT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAREGAON ROAD29 in Parbhani
Ganesh Nagar
Akbaroddin Jainulabedin Siddiqui
Mangalmurti Residency
MAHESH BALKISHAN SONI
SMART CITY
IRAJ SIDDIQUI IFTEQARODDIN SIDDIQUI
DHANLAKSHMI APARTMENT
DHANLAKSHMI CONSTRUCTION
VIJAY RESIDENCY
IDEAS BUILDERS AND DEVELOPERS
BOKAN HERITAGE
SWAPANIL CHANDRAKANT BOKAN
See every Parbhani project, with the district possession charts
Builder: KAILASH DAYARAM JETHWANI
KAILASH DAYARAM JETHWANI has 1 registration on MahaRERA, including GOKULDHAM HEIGHT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Parbhani district page.
Frequently asked questions
What are my rights if GOKULDHAM HEIGHT is delayed beyond 16 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOKULDHAM HEIGHT?
The registered promoter entity is KAILASH DAYARAM JETHWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOKULDHAM HEIGHT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOKULDHAM HEIGHT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOKULDHAM HEIGHT?
The professionals named in the filing: Architect: SPIRO DESIGNS; Engineer: VInayak Bhange; Chartered Accountant: SNGP & Co.; Chartered Accountant: ALKESH RAWKA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOKULDHAM HEIGHT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback