Home / Browse projects / Chandrapur, Maharashtra / GOKULDHAM APPARTMENT

Registered No litigation declared Residential / Group Housing project

GOKULDHAM APPARTMENT

By SHRI GAJANAN BUILDERS AND DEVELOPERS

RG-MH-04067 · RERA P50900048172 · Last updated on MahaRERA portal: 14 Aug 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
11 of 11Construction stages doneevery applicable stage filed complete
0 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

GOKULDHAM APPARTMENT is a Residential / Group Housing project by SHRI GAJANAN BUILDERS AND DEVELOPERS in Chandrapur, Maharashtra, registered with MahaRERA as P50900048172 on 15 Dec 2022. Possession is promised by 1 Dec 2026. 16 of the 16 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameGOKULDHAM APPARTMENT
  • TypeResidential / Group Housing
  • Location
    • ALLAPALLI ROAD
    • BAMNI
    • Ballarpur
    • Chandrapur
    • 442701
  • Pincode442701
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50900048172
  • ReraGenie IDRG-MH-04067

Builder

  • NameSHRI GAJANAN BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESH TOGALAYYAJI MUPPAWAR, SAMEER MOHANRAO KENE, MANISH CHANDRAKANT PANDE
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Dec 2022
  • Promised completion1 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

100%16 of 16 units booked
88.3%Work done, per cost certificate

Figures as on 14 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKULDHAM APPARTMENTNA6416016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GOKULDHAM APPARTMENT: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 14 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area669 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authoritySub-Divisional Office Ballarpur
Permissible FSI1786.01
Proposed, not sanctioned1,786 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBATTUWARS BLDG MAIN BUS STAND BALLARPUR 442701
Estimated costRs 3.14 cr
Cost incurredRs 2.77 cr
Work done88.33%
BuildingWingEstimatedIncurred
GOKULDHAM APPARTMENTNARs 3.14 crRs 2.77 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR PARINITA P MESHRAM
EngineerAR PARINITA P MESHRAM
Chartered AccountantMANISH MULCHANDANI
Chartered AccountantA M Dabke & Associates
PartnerRole in project
SHRI GAJANAN BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June-2025 Final.pdf14 Aug 2025
Withdrawal Update Form 2File: Form 2 June-2025 Final.pdf14 Aug 2025
Withdrawal Update Form 3File: Form 3 June-2025 Final.pdf14 Aug 2025
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf30 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf30 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf30 Jul 2025
Form 1File: Form 1 30-sep 2023.pdf8 Jul 2025
Form 2File: Form -2 30 sep 2023.pdf8 Jul 2025
Form 3File: Form 3 Sep-2023.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Sep-23.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Sep-23.pdf8 Jul 2025
Form 1File: Form 1 31-dec-2023.pdf8 Jul 2025
Form 2File: Form-2 31 dec 2023.pdf8 Jul 2025
Form 3File: Form 3 Dec-2023.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-23.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Dec-23.pdf8 Jul 2025
Form 1File: form 1 31-mar-2024.pdf8 Jul 2025
Form 2File: Form- 2 31 march 2024.pdf8 Jul 2025
Form 3File: Form 3 Mar-2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-24.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Mar-24.pdf8 Jul 2025
Form 1File: Form 1 30-jun-2024.pdf8 Jul 2025
Form 2File: Form - 2 30 june 2024.pdf8 Jul 2025
Form 3File: Form 3 June-2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Jun-24.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Jun-24.pdf8 Jul 2025
Form 1File: Form 1 30-sep-2024.pdf8 Jul 2025
Form 2File: Form - 2 30 sep 2024.pdf8 Jul 2025
Form 3File: Form 3 Sep-2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Sep-24.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Form 1 30-sep-2024.pdf8 Jul 2025
Form 1File: Form 1 31-dec-2024.pdf8 Jul 2025
Form 2File: Form - 2 31 dec 2024.pdf8 Jul 2025
Form 3File: Form 3 Dec-2024.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-24.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Dec-24.pdf8 Jul 2025
Form 1File: Form 1 31-mar-2025.pdf8 Jul 2025
Form 2File: Form - 2 31 march 2025.pdf8 Jul 2025
Form 3File: Form 3 Mar-2025.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-25.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Mar-25.pdf8 Jul 2025
Form 2A (FY 2022-2023)File: Form 2- A 31march2023.pdf8 Jul 2025
Form 2A (FY 2023-2024)File: Form - 2 A 31-03-2024.pdf8 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 31march2025.pdf8 Jul 2025
Form 1File: Form-1 31-dec-2022.pdf7 Jul 2025
Form 2File: Form -2 31 dec2022.pdf7 Jul 2025
Form 3File: Form 3 Dec-2022.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-22.pdf7 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Dec-22.pdf7 Jul 2025
Form 1File: Form 1 31-mar 2023.pdf7 Jul 2025
Form 2File: Form - 2 31 march 2023.pdf7 Jul 2025
Form 3File: Form 3 Mar-2023.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-23.pdf7 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration Mar-23.pdf7 Jul 2025
Form 1File: Form 1 30-jun-2023.pdf7 Jul 2025
Form 2File: Form -2 30 june 2023.pdf7 Jul 2025
Form 3File: Form 3 June-2023.pdf7 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Jun-23.pdf7 Jul 2025
Self-declaration of Quarterly ProgressFile: Declaration June-23.pdf7 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf6 Dec 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LETTER.pdf4 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT LETTER.pdf4 Oct 2022
Declaration in FORM BFile: AFFIDAVIT DECLARATION.pdf4 Oct 2022
Proforma of Allotment letterFile: Agreement For Sale Format in RERA.pdf4 Oct 2022
Proforma of Agreement for saleFile: Agreement For Sale Format in RERA.pdf4 Oct 2022
Proforma of Agreement for saleFile: Allotment Letter RERA Format.pdf4 Oct 2022
Proforma of Allotment letterFile: Allotment Letter RERA Format.pdf4 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account.pdf4 Oct 2022
Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT LETTER.pdf4 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION OF AGREEMENT FOR SALE.pdf4 Oct 2022
Layout approvalFile: Building Map.PDF6 Sep 2022
Building plan approvalFile: Building Map.PDF6 Sep 2022
Copy of Layout Approval (in case of layout)File: Building Map.PDF6 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Map.PDF6 Sep 2022
CERSAI detailsFile: CERSAI details.pdf6 Sep 2022
Details of encumbrances concerned to LegalFile: NoEncumbranceCert.pdf15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf15 Jul 2022
PAN CardFile: PAN CARD.pdf13 Jul 2022
Copy of the legal title reportFile: LEGALTITLEREPORT.pdf13 Jul 2022
Declaration about Commencement CertificateFile: Commencementcert.pdf13 Jul 2022

How this compares with Chandrapur

100%of this project is bookeddistrict median 18%
10%of Chandrapur projects moved their completion datethis one has not
39%of Chandrapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.

Keep GOKULDHAM APPARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BAMNI220+ in Chandrapur

2 kmGOKULDHAM APPARTMENTCompleted 2Lapsed / revoked 2Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: SHRI GAJANAN BUILDERS AND DEVELOPERS

SHRI GAJANAN BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including GOKULDHAM APPARTMENT and SHRI GAJANAN PARK APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Chandrapur district page.

Frequently asked questions

What are my rights if GOKULDHAM APPARTMENT is delayed beyond 1 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULDHAM APPARTMENT?

The registered promoter entity is SHRI GAJANAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULDHAM APPARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULDHAM APPARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULDHAM APPARTMENT?

The professionals named in the filing: Architect: AR PARINITA P MESHRAM; Engineer: AR PARINITA P MESHRAM; Chartered Accountant: MANISH MULCHANDANI; Chartered Accountant: A M Dabke & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULDHAM APPARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULDHAM APPARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULDHAM APPARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.