Home / Browse projects / Chandrapur, Maharashtra / GOKULDHAM APPARTMENT
GOKULDHAM APPARTMENT
By SHRI GAJANAN BUILDERS AND DEVELOPERS
RG-MH-04067 · RERA P50900048172 · Last updated on MahaRERA portal: 14 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Chandrapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOKULDHAM APPARTMENT is a Residential / Group Housing project by SHRI GAJANAN BUILDERS AND DEVELOPERS in Chandrapur, Maharashtra, registered with MahaRERA as P50900048172 on 15 Dec 2022. Possession is promised by 1 Dec 2026. 16 of the 16 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameGOKULDHAM APPARTMENT
- TypeResidential / Group Housing
- Location
- ALLAPALLI ROAD
- BAMNI
- Ballarpur
- Chandrapur
- 442701
- Pincode442701
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50900048172
- ReraGenie IDRG-MH-04067
Builder
- NameSHRI GAJANAN BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersRAJESH TOGALAYYAJI MUPPAWAR, SAMEER MOHANRAO KENE, MANISH CHANDRAKANT PANDE
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Dec 2022
- Promised completion1 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 14 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GOKULDHAM APPARTMENT | NA | 6 | 4 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
GOKULDHAM APPARTMENT: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 14 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GOKULDHAM APPARTMENT | NA | Rs 3.14 cr | Rs 2.77 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR PARINITA P MESHRAM |
| Engineer | AR PARINITA P MESHRAM |
| Chartered Accountant | MANISH MULCHANDANI |
| Chartered Accountant | A M Dabke & Associates |
| Partner | Role in project |
|---|---|
| SHRI GAJANAN BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2026
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June-2025 Final.pdf | 14 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 June-2025 Final.pdf | 14 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 June-2025 Final.pdf | 14 Aug 2025 |
| Form 5 (FY 2022-2023)File: Form 5 22-23.pdf | 30 Jul 2025 |
| Form 5 (FY 2023-2024)File: Form 5 23-24.pdf | 30 Jul 2025 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 30 Jul 2025 |
| Form 1File: Form 1 30-sep 2023.pdf | 8 Jul 2025 |
| Form 2File: Form -2 30 sep 2023.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Sep-2023.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Sep-23.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Sep-23.pdf | 8 Jul 2025 |
| Form 1File: Form 1 31-dec-2023.pdf | 8 Jul 2025 |
| Form 2File: Form-2 31 dec 2023.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Dec-2023.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-23.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Dec-23.pdf | 8 Jul 2025 |
| Form 1File: form 1 31-mar-2024.pdf | 8 Jul 2025 |
| Form 2File: Form- 2 31 march 2024.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Mar-2024.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-24.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Mar-24.pdf | 8 Jul 2025 |
| Form 1File: Form 1 30-jun-2024.pdf | 8 Jul 2025 |
| Form 2File: Form - 2 30 june 2024.pdf | 8 Jul 2025 |
| Form 3File: Form 3 June-2024.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Jun-24.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Jun-24.pdf | 8 Jul 2025 |
| Form 1File: Form 1 30-sep-2024.pdf | 8 Jul 2025 |
| Form 2File: Form - 2 30 sep 2024.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Sep-2024.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Sep-24.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Form 1 30-sep-2024.pdf | 8 Jul 2025 |
| Form 1File: Form 1 31-dec-2024.pdf | 8 Jul 2025 |
| Form 2File: Form - 2 31 dec 2024.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Dec-2024.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-24.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Dec-24.pdf | 8 Jul 2025 |
| Form 1File: Form 1 31-mar-2025.pdf | 8 Jul 2025 |
| Form 2File: Form - 2 31 march 2025.pdf | 8 Jul 2025 |
| Form 3File: Form 3 Mar-2025.pdf | 8 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-25.pdf | 8 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Mar-25.pdf | 8 Jul 2025 |
| Form 2A (FY 2022-2023)File: Form 2- A 31march2023.pdf | 8 Jul 2025 |
| Form 2A (FY 2023-2024)File: Form - 2 A 31-03-2024.pdf | 8 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 31march2025.pdf | 8 Jul 2025 |
| Form 1File: Form-1 31-dec-2022.pdf | 7 Jul 2025 |
| Form 2File: Form -2 31 dec2022.pdf | 7 Jul 2025 |
| Form 3File: Form 3 Dec-2022.pdf | 7 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Dec-22.pdf | 7 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Dec-22.pdf | 7 Jul 2025 |
| Form 1File: Form 1 31-mar 2023.pdf | 7 Jul 2025 |
| Form 2File: Form - 2 31 march 2023.pdf | 7 Jul 2025 |
| Form 3File: Form 3 Mar-2023.pdf | 7 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Mar-23.pdf | 7 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration Mar-23.pdf | 7 Jul 2025 |
| Form 1File: Form 1 30-jun-2023.pdf | 7 Jul 2025 |
| Form 2File: Form -2 30 june 2023.pdf | 7 Jul 2025 |
| Form 3File: Form 3 June-2023.pdf | 7 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold of all QTR Jun-23.pdf | 7 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Declaration June-23.pdf | 7 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf | 6 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE LETTER.pdf | 4 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT LETTER.pdf | 4 Oct 2022 |
| Declaration in FORM BFile: AFFIDAVIT DECLARATION.pdf | 4 Oct 2022 |
| Proforma of Allotment letterFile: Agreement For Sale Format in RERA.pdf | 4 Oct 2022 |
| Proforma of Agreement for saleFile: Agreement For Sale Format in RERA.pdf | 4 Oct 2022 |
| Proforma of Agreement for saleFile: Allotment Letter RERA Format.pdf | 4 Oct 2022 |
| Proforma of Allotment letterFile: Allotment Letter RERA Format.pdf | 4 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seprate Bank Account.pdf | 4 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT LETTER.pdf | 4 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION OF AGREEMENT FOR SALE.pdf | 4 Oct 2022 |
| Layout approvalFile: Building Map.PDF | 6 Sep 2022 |
| Building plan approvalFile: Building Map.PDF | 6 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: Building Map.PDF | 6 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Map.PDF | 6 Sep 2022 |
| CERSAI detailsFile: CERSAI details.pdf | 6 Sep 2022 |
| Details of encumbrances concerned to LegalFile: NoEncumbranceCert.pdf | 15 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 15 Jul 2022 |
| PAN CardFile: PAN CARD.pdf | 13 Jul 2022 |
| Copy of the legal title reportFile: LEGALTITLEREPORT.pdf | 13 Jul 2022 |
| Declaration about Commencement CertificateFile: Commencementcert.pdf | 13 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Chandrapur
Computed across the 220+ Chandrapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GOKULDHAM APPARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BAMNI220+ in Chandrapur
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
RISHI PLAZA
PREMKUMAR SADHUMAL MULANI
NIKHIL PLANET
J K BUILDERS AND DEVELOPERS
AK-FLORENZA
ANKLESH NATHUJI KHAIRE
ADTIYA PLAZA
ANKLESH NATTHUJI KHAIRE
AMAN PLAZA
Mohammad Nizam Uddin
ARYAN APPARTMENT - 4
ARYAN DEVELOPERS
See every Chandrapur project, with the district possession charts
Builder: SHRI GAJANAN BUILDERS AND DEVELOPERS
SHRI GAJANAN BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including GOKULDHAM APPARTMENT and SHRI GAJANAN PARK APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Chandrapur district page.
Frequently asked questions
What are my rights if GOKULDHAM APPARTMENT is delayed beyond 1 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOKULDHAM APPARTMENT?
The registered promoter entity is SHRI GAJANAN BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOKULDHAM APPARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOKULDHAM APPARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOKULDHAM APPARTMENT?
The professionals named in the filing: Architect: AR PARINITA P MESHRAM; Engineer: AR PARINITA P MESHRAM; Chartered Accountant: MANISH MULCHANDANI; Chartered Accountant: A M Dabke & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOKULDHAM APPARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback