ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GOKUL

Registered No litigation declared Residential / Group Housing project

GOKUL

By NEELKAMAL BUILDERS PRIVATE LIMITED

RG-MH-18425 · RERA P52000077220 · Last updated on MahaRERA portal: 16 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Podiums (if any), 90%
55 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

GOKUL is a Residential / Group Housing project by NEELKAMAL BUILDERS PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000077220 on 31 Jul 2024. Possession is promised by 31 Dec 2028. 35 of the 90 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameGOKUL
  • TypeResidential / Group Housing
  • Location
    • SECTOR-19A
    • KHARGHAR
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077220
  • ReraGenie IDRG-MH-18425

Builder

  • NameNEELKAMAL BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsMANISHA VIJAY KANASE, NARAYAN GUJABA KANSE, KAMAL NARAYAN KANSE
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jul 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed53 files

Current status

39%35 of 90 units booked
29.7%Work done, per cost certificate

Figures as on 16 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKULNA292390090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 90%.

GOKUL: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth90%
Stilt Floor90%
Slabs of Super Structure67%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered132

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,150 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI10319.47
Proposed, not sanctioned10,318 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGALA NO - J-21, MARKET -I, PHASE-II, MASALA MARKET, APMC, VASHI, NAVI MUMBAI-400705
Estimated costRs 57.26 cr
Cost incurredRs 17.02 cr
Work done29.72%
BuildingWingEstimatedIncurred
GOKULNARs 40.08 crRs 17.02 cr
-NARs 17.18 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDIMENSIONS ARCHITECTS PVT LTD
EngineerVINIT STRUCTURAL CONSULTANCY PVT. LTD.
Chartered AccountantPatil Mhatre & Pol LLP
Chartered AccountantGHADI & ASSOCIATES
PartnerRole in project
NEELKAMAL BUILDERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ GOKUL.pdf16 Apr 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ GOKUL.pdf16 Apr 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ GOKUL.pdf16 Apr 2026
Layout approvalFile: PLANS.pdf22 Jan 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ GOKUL.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM 1_ DEC 25_ GOKUL.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_ SEP 25_ GOKUL.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ GOKUL.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_ SEP 25_ GOKUL.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ GOKUL.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ GOKUL.pdf30 Sep 2025
Commencement certificateFile: KHARGHAR GOKUL CC- PDF PRINT.pdf18 Jul 2025
Declaration and undertaking (Annexure A)File: ANNEXURE u0027Au0027 DECLARATION CUM UNDERTAKING.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 FORM 1, 04 04 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 FORM 3 , FINAL 12 04 2025 2.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2, RCC 12 04 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 FORM.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 FINAL 14012025.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 RCC 14 01 2025.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 FORM 1 (From Architect) 1 oct 2024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 FINAL 03102024 (2).pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 RCC 03102024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RCC 6062024.pdf25 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 ANNEXURE A DISCLOSURE OF INTREST OTHER REAL ESTATE ORG -MANISHA KANASE.pdf15 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 12 ANNEXURE A DISCLOSURE OF INTREST OTHER REAL ESTATE ORG -NARAYAN KANASE.pdf15 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 13 ANNEXURE A DISCLOSURE OF INTREST OTHER REAL ESTATE ORG -KAMAL KANASE.pdf15 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 ANNEXURE A DISCLOSURE OF INTREST OTHER REAL ESTATE ORG letter head.pdf3 Jul 2024
Other - TechnicalFile: ANNEXURE 'A' DECLARATION CUM UNDERTAKING.pdf21 Jun 2024
Other - LegalFile: 6 DEED OF MODIFICATION RAGISTcompress.pdf19 Jun 2024
Other - LegalFile: PLOT NO 88 AGREEMENT TO LEAGE.pdf18 Jun 2024
Other - LegalFile: TRIPARTITE AGREEMENT PLOT NO 88( 32 PAGES).pdf18 Jun 2024
Other - LegalFile: AGREEMENT TO LEAGE PLOT NO 89.pdf18 Jun 2024
Other - LegalFile: TRIPRITE AGGREMENT PLOT NO 89.pdf18 Jun 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL C.pdf11 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 5 FORM A DECLARATION OF SEPARATE BANK ACCOUANT final.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (From Architect)_New Format.pdf7 Jun 2024
Layout approvalFile: CC PLAN GOKUL KHARGHAR -PDF PRINT.pdf30 May 2024
Building plan approvalFile: CC PLAN GOKUL KHARGHAR -PDF PRINT.pdf30 May 2024
Copy of the legal title reportFile: FORMAT -A LEGAL TITLE REPORT GOKUL_compressed.pdf30 May 2024
Copy of the legal title reportFile: SEARCH REPORT GOKUL.pdf30 May 2024
Copy of Layout Approval (in case of layout)File: CC PLAN GOKUL KHARGHAR -PDF PRINT.pdf30 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CC PLAN GOKUL KHARGHAR -PDF PRINT.pdf30 May 2024
Proforma of Agreement for saleFile: 8 DRAFT AGREEMENT FOR SALE.pdf30 May 2024
Proforma of Allotment letterFile: 9 DRAFT -ALLOTMENT LETTER.pdf30 May 2024
Deviation Report with respect to model copy of AgreementFile: 7 DEVIATION REPORT AGREEMENT FOR SALE.pdf30 May 2024
PAN CardFile: company pan card pdf.pdf29 May 2024
Details of encumbrances concerned to FinanceFile: CERTIFICATE DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf29 May 2024
Details of encumbrances concerned to LegalFile: CERTIFICATE DECLARATION OF ENCUMBRANCES CONCERNED TO FINANCE.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: KHARGHAR GOKUL CC- PDF PRINT.pdf29 May 2024
Declaration about Commencement CertificateFile: 2 FORM D GOKUL DECLARATION OF CC.pdf29 May 2024
Declaration in FORM BFile: FORM B GOKUL AFFIDAVIT CUM DECLARATION.pdf29 May 2024
Deviation Report with respect to Allotment letterFile: 6 DEVIATION REPORT ALLOTMENT LETTER.pdf29 May 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Neelkamal Sai Datta KrupaPlot No 41, phase-II, navade, navi mumbai56CompletedJan 2014Late, Sep 2014
NEELKAMAL SAI DATTAKRUPAPLOT NO. 41 PHASE II NAWADE NAVI MUMBAI56CompletedDec 2011Late, Sep 2014
NEELKAMAL MANGALMURTIPLOT NO. 16 PHASE II NAWADE NAVI MUMBAI35CompletedJan 2011Late, Aug 2013
NIRMAL NAGARI PHASE - 1GAT NO 117 VILLAGE DERAVALI TALUKA PANVEL DIST RAIGAD168CompletedJan 2011Late, Sep 2013

How this compares with Raigarh

39%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOKUL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARGHAR5,900+ in Raigarh

2 kmGOKULCompleted 34Lapsed / revoked 9Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: NEELKAMAL BUILDERS PRIVATE LIMITED

NEELKAMAL BUILDERS PRIVATE LIMITED has 3 registrations on MahaRERA, including NIRMAL GANESH and NIRMAL POOJA. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GOKUL is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKUL?

The registered promoter entity is NEELKAMAL BUILDERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKUL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKUL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKUL?

The professionals named in the filing: Architect: DIMENSIONS ARCHITECTS PVT LTD; Engineer: VINIT STRUCTURAL CONSULTANCY PVT. LTD.; Chartered Accountant: Patil Mhatre & Pol LLP; Chartered Accountant: GHADI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKUL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKUL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKUL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.