Home / Browse projects / Raigarh, Maharashtra / Gokul Heights

Completed No litigation declared Residential / Group Housing project

Gokul Heights

By SEEMA VIJAY NIKAM

RG-MH-06031 · RERA P52000052367 · Last updated on MahaRERA portal: 13 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
17 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Gokul Heights is a Residential / Group Housing project by SEEMA VIJAY NIKAM in Raigarh, Maharashtra, registered with MahaRERA as P52000052367 on 21 Aug 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 12 months from the original filing. 39 of the 56 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameGokul Heights
  • TypeResidential / Group Housing
  • Location
    • Survey No.163
    • Village Road Ajivali
    • Ajivali
    • Panvel
    • Raigarh
    • 410221
  • Pincode410221
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052367
  • ReraGenie IDRG-MH-06031

Builder

  • NameSEEMA VIJAY NIKAM
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2023First promiseJun 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Aug 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed70 files

Current status

70%39 of 56 units booked
65.2%Work done, per cost certificate

Figures as on 13 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLDG 1 A WingNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

BLDG 1 A Wing: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered14
Open Space43

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Asmita Atmaram KhaneKhargharRaigarh
Neha Atmaram KhaneKhargharRaigarh
Sangeeta KhaneAjivaliRaigarh

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation Limited
Permissible FSI2862.44
Proposed, not sanctioned2,337 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNew Panvel
Estimated costRs 5.75 cr
Cost incurredRs 3.75 cr
Work done65.24%
BuildingWingEstimatedIncurred
BLDG 1 A WingNARs 5.47 crRs 3.57 cr
-NARs 28.77 lakhRs 18.77 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchwayDesigns
EngineerS K Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantVikas Abhang and Associates
PartnerRole in project
SEEMA VIJAY NIKAM-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08072502000Jun 2025 → Jun 2026

Reason as filed by the promoterI apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, I am working diligently to address these issues and complete the remaining work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Gokul Heights as on June 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - Gokul Heights as on June 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 3 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3 - Gokul Heights as on June 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 3File: Form 3 - Gokul Heights as on Sep 2025.pdf13 Jan 2026
Withdrawal Update Form 1File: Form 1 - Gokul Heights as on June 2024.pdf13 Oct 2025
Withdrawal Update Form 2File: Form 2 - Gokul Heights as on June 2025.pdf13 Oct 2025
Withdrawal Update Form 3File: Form 3 - Gokul Heights as on June 2025.pdf13 Oct 2025
Form 1File: Form 1 March 2025.pdf8 Jul 2025
Form 2File: Form 2 - April 2025.pdf8 Jul 2025
Form 3File: Form 3 April 2025.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf8 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf8 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gokul Heights as on March 2025.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on March 2025.pdf10 May 2025
Form 1 - Gokul Heights as on March 202529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gokul Heights as on Dec 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on Dec 2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gokul Heights as on Dec 2024.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on Dec 2024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gokul Heights as on December 2024.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gokul Heights as on December 2024.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gokul Heights as on December 2024.pdf6 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gokul Heights as on December 2024.pdf6 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Gokul Heights_30th Sept 2024- Final.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on Sept 2024.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Gokul Heights_30th Sept 2024- Final.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on Sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GOKUL HEIGHTS Sep 2024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 GOKUL HEIGHTS Sep 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on June 2024.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Gokul Heights_30th June 2024.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Gokul Heights as on June 2024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - GOKUL HEIGHTS as on March 2024.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Gokul Heights as on March 2024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Gokul Heights_31st March 2024.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on December 2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gokul Heights as on December 2023.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - GOKUL HEIGHTS as on DEC 2023.pdf8 Jan 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Gokul Heights.pdf23 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gokul Heights as on Sep 2023.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Gokul Heights_30th Sept 2023_Final.pdf8 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- GOKUL HEIGHTS as on 30-09-2023.pdf4 Dec 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance- Finance.pdf17 Jul 2023
Details of encumbrances concerned to LegalFile: No Encumbrance- Finance.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Gokul Heights.pdf10 Jul 2023
Copy of the legal title reportFile: Final Title Report.pdf8 Jul 2023
Details of encumbrances concerned to FinanceFile: Declaration for no Encumbrance.pdf8 Jul 2023
Details of encumbrances concerned to LegalFile: Declaration for no Encumbrance.pdf8 Jul 2023
Declaration about Commencement CertificateFile: Declration About Commencemnt Certificate.pdf8 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archway Design Form 1.pdf8 Jul 2023
Proforma of Agreement for saleFile: AFS_Gokul Heights_Shree Sarita Heights.pdf8 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 163 Enginee'r Certificate.pdf1 Jul 2023
Proforma of Allotment letterFile: RERA Allotment Letter.pdf28 Jun 2023
Building plan approvalFile: bldg plan reduced.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: bldg plan reduced.pdf26 Jun 2023
Declaration in FORM BFile: Affidavit cum Declaration.pdf26 Jun 2023
Layout approvalFile: Building Approved Plan.pdf25 Jun 2023
PAN CardFile: SEEMA NIKAM - PAN CARD FOR SHREE SARITA ENTERPEISES.pdf25 Jun 2023
Copy of Layout Approval (in case of layout)File: Building Approved Plan.pdf25 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 163 Gokul Heights CC_compressed.pdf25 Jun 2023
CERSAI detailsFile: Cersai Declaration.pdf25 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf25 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Seprate Bank Account.pdf25 Jun 2023
Deviation Report with respect to Allotment letterFile: Details of No Deviation.pdf25 Jun 2023
Deviation Report with respect to model copy of AgreementFile: dbqwklndnqsdlnqld.pdf25 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
SARATHI RESIDENCYP51700005507Bapgaon, ThaneAug 2017CompletedMar 2018Mar 2018

How this compares with Raigarh

70%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gokul Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ajivali5,900+ in Raigarh

2 kmGokul HeightsCompleted 7Lapsed / revoked 4Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: SEEMA VIJAY NIKAM

SEEMA VIJAY NIKAM has 3 registrations on MahaRERA, including SARATHI RESIDENCY and Gokul Heights. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Gokul Heights is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gokul Heights?

The registered promoter entity is SEEMA VIJAY NIKAM, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gokul Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gokul Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gokul Heights?

The professionals named in the filing: Architect: ArchwayDesigns; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: Vikas Abhang and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gokul Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gokul Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gokul Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.