Home / Browse projects / Nagpur, Maharashtra / GOKUL ENCLAVE WING-A WING-B

Registration lapsed No litigation declared Residential / Group Housing project

GOKUL ENCLAVE WING-A WING-B

By HARE KRISHNA BUILDERS

RG-MH-03924 · RERA P50500032921 · Last updated on MahaRERA portal: 22 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
17 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

GOKUL ENCLAVE WING-A WING-B is a Residential / Group Housing project by HARE KRISHNA BUILDERS in Nagpur, Maharashtra, registered with MahaRERA as P50500032921 on 2 Feb 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameGOKUL ENCLAVE WING-A WING-B
  • TypeResidential / Group Housing
  • Location
    • ZINGABAI TAKLI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440030
  • Pincode440030
  • RERA no.P50500032921
  • ReraGenie IDRG-MH-03924

Builder

  • NameHARE KRISHNA BUILDERS
  • Entity typePartnership
  • GSTIN27AAUFK7638J1ZH
  • PartnersSHRUTI PANKAJ DHAWAN, KULDEEP SUBHASH MALHOTRA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

22 months past promisethis monthRegisteredFeb 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on2 Feb 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKUL ENCLAVE WING-ANA70000
GOKUL ENCLAVE WING-BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

GOKUL ENCLAVE WING-A83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
GOKUL ENCLAVE WING-B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
GOKUL ENCLAVE WING-A11011
GOKUL ENCLAVE WING-B01010

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,087 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Sep 2024

Approvals and building plan

Permissible FSI3500.0
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCENTRAL BAZAR

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEmanate Designs
ArchitectEMANATE DESIGN ARCHITECTURE PLANNING & INTERIORS
EngineerAaj Engineers and consultants pvt ltd
EngineerSATISH PANDEY
Chartered AccountantCA GITTESH MADDIWAR
Chartered AccountantGitesh Ashok Maddiwar
Chartered AccountantM/s MJM Associates
PartnerRole in project
HARE KRISHNA BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Mar 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form -3.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate A and B_11zon.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE WING A AND B WING.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 19-Apr-2025 1-15 pm.pdf23 Apr 2025
Declaration in FORM BFile: DocScanner 27-Mar-2025 12-46 pm.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 24.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner 10-Feb-2025 1-22 pm.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner 10-Feb-2025 1-10 pm.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOC-20250118-WA0017.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GetUserDocumentFileContent.pdf8 Feb 2025
OtherFile: RECEIPT.pdf24 Jan 2025
Proforma of Agreement for saleFile: afs 24-01-2025.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE SEP 2024 FINAL.pdf4 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Salebook inventry .pdf4 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate .pdf16 Dec 2024
OtherFile: Rera Extension letters.pdf23 Nov 2024
OtherFile: Affidavit wing A.pdf22 Nov 2024
OtherFile: wing A extension letter (1).pdf21 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GOKUL ENCLAVE WING A AND B.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gokul Enclave Wing A B.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 23-Oct-2024 1-52 pm (4).pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Gokul Encalve Wing A and B.pdf1 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CErtificate Sign .pdf1 Aug 2024
Declaration in FORM BFile: Format B Notry 1.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech certificate.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certitifate - final.pdf25 Jun 2024
OtherFile: Format B.pdf25 Jun 2024
OtherFile: fORMAT c .pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf14 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SIGN FORM.pdf14 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Wing A B Form 3.pdf30 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 GOKUL ENCLAVE WING A B 03-07-2023.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 GOKUL ENCLAVE WING A B 02-01-2024.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 GOKUL ENCLAVE WING A B 02-04-2024.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 GOKUL ENCLAVE WING A B 02-10-2023.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate A - B July 2023.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Oct 2023 A b.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AB Jan 2024.pdf17 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AB March 2024.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 1.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate .pdf14 May 2024
OtherFile: letter (2).pdf14 May 2024
Declaration in FORM BFile: Affidevid cum declaration.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf16 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf3 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec-23.pdf18 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DocScanner 23 Feb 2024 1-03 PM (1).pdf11 Mar 2024
Copy of the legal title reportFile: legal title report (1)_11zon.pdf3 Feb 2024
Building plan approvalFile: Scan002-0067 (1)_11zon (1).pdf18 Jan 2024
Building plan approvalFile: Scan002-0068 (1)_11zon (1).pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan002-0067 (1)_11zon (1).pdf18 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan002-0068 (1)_11zon (1).pdf18 Jan 2024
Declaration about Commencement CertificateFile: doc08331320230530204850 (1).pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Gokul Enclave A and B.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec-23.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Final .pdf18 Jan 2024
Layout approvalFile: doc08331320230530204850 (1).pdf2 Sep 2023
Building plan approvalFile: Scan002-0068 (1)_11zon.pdf2 Sep 2023
Building plan approvalFile: Scan002-0067 (1)_11zon.pdf2 Sep 2023
Copy of Layout Approval (in case of layout)File: doc08331320230530204850 (1).pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan002-0068 (1)_11zon.pdf2 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan002-0067 (1)_11zon.pdf2 Sep 2023
OtherFile: DOD NEW NO372_.pdf2 Sep 2023
Layout approvalFile: doc08331320230530204850.pdf14 Aug 2023
Copy of Layout Approval (in case of layout)File: doc08331320230530204850.pdf14 Aug 2023
CERSAI detailsFile: CERSAI.pdf18 Jan 2022
OtherFile: Form D.pdf18 Jan 2022
Building plan approvalFile: sanctioned plan-1.pdf8 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: sanctioned plan-1.pdf8 Jan 2022
Proforma of Allotment letterFile: AGG TO SALE DRAFT.pdf3 Jan 2022
Copy of the legal title reportFile: Format-A Legal Title Report.pdf29 Dec 2021
Copy of the legal title reportFile: search Report_compressed (3).pdf29 Dec 2021
Declaration about Commencement CertificateFile: Format D.pdf29 Dec 2021
Building plan approvalFile: 2.PDF28 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GOKUL HRISHIKESH RESIDENCYPLOT NO 1 SHEET NO 41 NAGPUR1OngoingDec 2024Dec 2024

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GOKUL ENCLAVE WING-A WING-B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ZINGABAI TAKLI2,800+ in Nagpur

Builder: HARE KRISHNA BUILDERS

HARE KRISHNA BUILDERS has 4 registrations on MahaRERA, including SAIRAM and GOKUL ENCLAVE WING-A WING-B. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that GOKUL ENCLAVE WING-A WING-B shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GOKUL ENCLAVE WING-A WING-B is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKUL ENCLAVE WING-A WING-B?

The registered promoter entity is HARE KRISHNA BUILDERS, a partnership as per the filing. Its GSTIN 27AAUFK7638J1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKUL ENCLAVE WING-A WING-B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKUL ENCLAVE WING-A WING-B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKUL ENCLAVE WING-A WING-B?

The professionals named in the filing: Architect: Emanate Designs; Architect: EMANATE DESIGN ARCHITECTURE PLANNING & INTERIORS; Engineer: Aaj Engineers and consultants pvt ltd; Engineer: SATISH PANDEY; Chartered Accountant: CA GITTESH MADDIWAR; Chartered Accountant: Gitesh Ashok Maddiwar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKUL ENCLAVE WING-A WING-B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKUL ENCLAVE WING-A WING-B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKUL ENCLAVE WING-A WING-B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.