Home / Browse projects / Raigarh, Maharashtra / Godrej Golf Side Estate II
Godrej Golf Side Estate II
By GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED
RG-MH-31560 · RERA P52000079895 · Last updated on MahaRERA portal: 19 Jun 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Golf Side Estate II is a Plotted project by GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000079895 on 28 Mar 2025. The registration is recorded completed; possession was promised by 31 Dec 2028. 113 of the 119 units on this registration are recorded sold or booked.
At a glance
Project
- NameGodrej Golf Side Estate II
- TypePlotted
- Location
- 18.00 mt wide DP road
- Panvel
- Talegaon
- Khalapur
- Raigarh
- 410221
- Pincode410221
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000079895
- ReraGenie IDRG-MH-31560
Builder
- NameGODREJ HILLSIDE PROPERTIES PRIVATE LIMITED
- Entity typeCompany
- CINU70102MH2015PTC263237
- Associate Vice President Region Head MMR TwoPriyamvada Navet
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Mar 2025
- Promised completion31 Dec 2028
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed65 files
Current status
Figures as on 19 Jun 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 21% |
| Water Supply | Yes | 10% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 66% |
| Storm Water Drains | Yes | 89% |
| Landscaping & Tree Planting | Yes | 5% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 10% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 20% |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 41.39 cr | Rs 4.67 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R Design Architects |
| Architect | Urban Analysis & Solutions Consultancy Services |
| Engineer | Rajendra V Joshi |
| Engineer | Mr. Paraag Rode, Vinyasa Consultants |
| Chartered Accountant | AKPJ & Associates |
| Chartered Accountant | B S R & Co. LLP |
| Chartered Accountant | Rupen Dilip Kumar Shah |
| Partner | Role in project |
|---|---|
| GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Mar 2026
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Godrej Golf Side Estate II.pdf | 19 Jun 2026 |
| Completion CertificateFile: RERA_PP2.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Withdrawal Application Golf Side Estate II 2.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 - RERA-GODREJ GOLF SIDE ESTATE-II PANVEL_DEC-25_ Final.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 - Golf Side Estate II.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 GODREJ GOLF SIDE ESTATE-II SEPTu002725.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 PP-2 Sep-25.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: freecompress-Final Form 5 GGSE2 Mar -2025.pdf | 28 Aug 2025 |
| Form 1File: Form 1 PP2-Architect's Certificate.pdf | 19 Jul 2025 |
| Form 2File: Form 2 PP2-Engineer's Certificate.pdf | 19 Jul 2025 |
| Form 3File: Form 3 PP2 CA certificate_June 25.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Golfside Estate II Disclosure of Sold Final.pdf | 19 Jul 2025 |
| Form 2A (FY 2024-2025) | 18 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's certificate_Panvelplotted March 25 (002).pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Plotted 2 31 Mar 25.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ GOLF SIDE ESTATE-II PANVEL_31ST MAR'25.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY - GGS II.pdf | 16 Apr 2025 |
| Building plan approval or NA orderFile: Drawings Final.pdf | 28 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Final layout Letter.pdf | 28 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawings Final.pdf | 28 Mar 2025 |
| Declaration about Commencement CertificateFile: CC Dec.pdf | 28 Mar 2025 |
| Copy of the legal title reportFile: RARA Title Report 240325 - 1-5.pdf | 24 Mar 2025 |
| Copy of the legal title reportFile: RARA Title Report 240325 6-25.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: EC - Finance.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: EC Legal.pdf | 24 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 24 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (48)_compressed.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 24 Mar 2025 |
| Other - LegalFile: 7 12 extract.pdf | 24 Mar 2025 |
| Other - LegalFile: Anx A - Declaration cum undertaking.pdf | 24 Mar 2025 |
| Other - LegalFile: Registration Declaration.pdf | 24 Mar 2025 |
| Other - LegalFile: BR - Estate II.pdf | 24 Mar 2025 |
| CERSAI detailsFile: CERSAI Report - Final.pdf | 24 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Bank.pdf | 24 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report- Allotment Letter.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to LegalFile: EC - Finance.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to LegalFile: EC Legal.pdf | 24 Mar 2025 |
| Other - FinanceFile: BR - Estate II.pdf | 24 Mar 2025 |
| Other - FinanceFile: Registration Declaration.pdf | 24 Mar 2025 |
| Other - TechnicalFile: 7 12 extract.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Anx A - Declaration cum undertaking.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Registration Declaration.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Survey No 23-2 Deed of Conveyance GHPPL.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Survey No 1-3_Deed of Conveyance.pdf | 24 Mar 2025 |
| Other - TechnicalFile: Godrej Hillside Properties Pvt Ltd_Conveyance - Y_compressed.pdf | 24 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS-240325.pdf | 24 Mar 2025 |
| Proforma of Agreement for saleFile: AFS 240325.pdf | 24 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Amit DOI.pdf | 24 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Priyamvada - DOI.pdf | 24 Mar 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B - Bank declaration.pdf | 24 Mar 2025 |
| Layout approvalFile: Layout pg1 Final.pdf | 21 Mar 2025 |
| Building plan approval or NA orderFile: Layout pg 2.pdf | 21 Mar 2025 |
| Building plan approval or NA orderFile: Layout pg 3.pdf | 21 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Layout pg1 Final.pdf | 21 Mar 2025 |
| Proforma of Allotment letterFile: Proforma Allotment Letter - RERA.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 2.pdf | 21 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 3.pdf | 21 Mar 2025 |
| Other - LegalFile: Godrej Hillside Properties Pvt Ltd_Conveyance - Y_compressed.pdf | 21 Mar 2025 |
| Other - LegalFile: Survey No 23-2 Deed of Conveyance GHPPL.pdf | 21 Mar 2025 |
| Other - LegalFile: Survey No 1-3_Deed of Conveyance.pdf | 21 Mar 2025 |
| Other - TechnicalFile: BR - Estate II.pdf | 21 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure Secured and Unsecured Final.pdf | 21 Mar 2025 |
| PAN CardFile: 1 PAN Card (1).pdf | 17 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
Keep Godrej Golf Side Estate II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
Filed coordinates, straight-line distance. 24 registered projects within 2 km.
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED
GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED has 2 registrations on MahaRERA, including Godrej Golf Side Estate and Godrej Golf Side Estate II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Godrej Golf Side Estate II is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Golf Side Estate II?
The registered promoter entity is GODREJ HILLSIDE PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U70102MH2015PTC263237 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Golf Side Estate II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Godrej Golf Side Estate II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Golf Side Estate II?
The professionals named in the filing: Architect: R Design Architects; Architect: Urban Analysis & Solutions Consultancy Services; Engineer: Rajendra V Joshi; Engineer: Mr. Paraag Rode, Vinyasa Consultants; Chartered Accountant: AKPJ & Associates; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Golf Side Estate II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.