GODHAWARI HEIGHTS
RG-MH-71227 · RERA P52600049319 · Last updated on MahaRERA portal: 9 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.
See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GODHAWARI HEIGHTS is a Residential / Group Housing project by HANMANTU KOMARAYYA BURA in Solapur, Maharashtra, registered with MahaRERA as P52600049319 on 7 Feb 2023. The registration is recorded completed; possession was promised by 31 Oct 2024.
At a glance
Project
- NameGODHAWARI HEIGHTS
- TypeResidential / Group Housing
- Location
- Kasbe Solapur
- Gandhi nagar
- Solapur (M Corp.)
- Solapur North
- Solapur
- 413005
- Pincode413005
- RERA no.P52600049319
- ReraGenie IDRG-MH-71227
Builder
- NameHANMANTU KOMARAYYA BURA
- Entity typeIndividual
- Other registrations3 more →
- Completed2 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on7 Feb 2023
- Promised completion31 Oct 2024
- Revised completionNone
- Buildings1 building record
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GODHAWARI HEIGHTS | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
GODHAWARI HEIGHTS: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed58
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sandeep Subhash Kungulwar | Solapur (M Corp.) | Solapur |
| Satish Subhash Kungulwar | Solapur (M Corp.) | Solapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAVIRAJ MARKANDEYA SAMLETI |
| Engineer | RAVIRAJ MARKANDEYA SAMLETI |
| Chartered Accountant | CA RAJENDRA K BURA |
| Partner | Role in project |
|---|---|
| HANMANTU KOMARAYYA BURA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 11 Jul 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Godavari plan.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate godavari 2023.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate godavari 2024-03.pdf | 9 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate Godhawari 2024-04.pdf | 9 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: architect certificate Godhawari form 4.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate Godhawari 2023.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate Godhawari 2024-03.pdf | 9 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate Godhawari 2024-04_.pdf | 9 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: GODAVARI cc.pdf | 9 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Godavari plan.pdf | 9 Dec 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Dod 1_11zon.pdf | 9 Dec 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Dod 2_11zon.pdf | 9 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: q3 of 2024 godhawari.pdf | 22 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godawari Form 3 June 24_compressed.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godavari F1 Q4 23.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godavari f1 Q1.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godavari F1 OC.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: godavari f2 Q4.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godavari F2 Q1.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godavari F2 OC.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Godavari F 2A 23-24.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure - Godhawari Heights - 12-23.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure - Godhawari Heights - 03-24.pdf | 11 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC godavari bura.pdf | 11 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 SCANNED (1).pdf | 27 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 3 23.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 06 23.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 09 23.pdf | 25 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 31032023 (2).pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 30062023.pdf | 24 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 30092023.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f2 31032023.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: f2 30062023.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 30092023.pdf | 24 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Godawari Heights (1).pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Godawari 31032023.pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Godhawari Heights 30-6-23.pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Godhawari Heights 30-9-23 (1).pdf | 24 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bura Bank Account.pdf | 2 Feb 2023 |
| Other - FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf | 2 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 10 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bura CA.pdf | 11 Oct 2022 |
| Proforma of Allotment letterFile: Allotment Letter Flat Bura.pdf | 11 Oct 2022 |
| Proforma of Agreement for saleFile: Allotment Letter Flat Bura.pdf | 11 Oct 2022 |
| CERSAI detailsFile: Godawari CERSAI.pdf | 10 Oct 2022 |
| Layout approvalFile: SMC Municipal Final Layout_11zon.pdf | 2 Oct 2022 |
| Building plan approvalFile: 10 SMC.pdf | 2 Oct 2022 |
| Copy of the legal title reportFile: bura rera_11zon.pdf | 2 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: encmb finance bura.pdf | 2 Oct 2022 |
| Details of encumbrances concerned to LegalFile: legan encumb bura.pdf | 2 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: SMC Municipal Final Layout_11zon.pdf | 2 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 10 SMC.pdf | 2 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: SMC Building Permission Letter.pdf | 2 Oct 2022 |
| Declaration about Commencement CertificateFile: declaration about com bura.pdf | 2 Oct 2022 |
| Declaration in FORM BFile: bura FB_11zon.pdf | 2 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1 Bura.pdf | 2 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2 Bura.pdf | 2 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F2A bura.pdf | 2 Oct 2022 |
| Proforma of Agreement for saleFile: Agreement to sale Flat bura.pdf | 2 Oct 2022 |
| Proforma of Allotment letterFile: Agreement to sale Flat bura.pdf | 2 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Flat Bura.pdf | 2 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: deviation ATS bura.pdf | 2 Oct 2022 |
| PAN CardFile: 5 (2).pdf | 26 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Solapur
Computed across the 550+ Solapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
Keep GODHAWARI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gandhi nagar550+ in Solapur
Niyojit Shri Somvanshiya Sahastrarjun Kshatriy
Anukarati Homes Private Limited
NAKSHATRA HEIGHTS
GAYATRI BUILDERS AND DEVELOPERS
Kaveri Heights
Gayatri Developers
PADMAWATI REJENCY
GURAPPA MALLIKARJUN KAPSE
SURYA COMPLEX
SURESH AMBADAS MITTHAKOL
PRAJAY HEIGHTS
JAYKANT CONSTRUCTION
See every Solapur project, with the district possession charts
Builder: HANMANTU KOMARAYYA BURA
HANMANTU KOMARAYYA BURA has 4 registrations on MahaRERA, including BHAGIRATHI HEIGHTS and SARASWATHI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.
Frequently asked questions
What are my rights if GODHAWARI HEIGHTS is delayed beyond 31 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GODHAWARI HEIGHTS?
The registered promoter entity is HANMANTU KOMARAYYA BURA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GODHAWARI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GODHAWARI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GODHAWARI HEIGHTS?
The professionals named in the filing: Architect: RAVIRAJ MARKANDEYA SAMLETI; Engineer: RAVIRAJ MARKANDEYA SAMLETI; Chartered Accountant: CA RAJENDRA K BURA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GODHAWARI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback