ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Global Enrise

Completed No litigation declared Residential / Group Housing project

Global Enrise

By Global Reality

RG-MH-22787 · RERA P52100034352 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 95%
5 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Global Enrise is a Residential / Group Housing project by Global Reality in Pune, Maharashtra, registered with MahaRERA as P52100034352 on 4 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 75 of the 80 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameGlobal Enrise
  • TypeResidential / Group Housing
  • Location
    • Shivraj Nagar
    • Village Rahatani
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411017
  • Pincode411017
  • RERA no.P52100034352
  • ReraGenie IDRG-MH-22787

Builder

  • NameGlobal Reality
  • Entity typePartnership
  • PartnersIshwar Jumeromal Jhamtani, Pritpal Charansingh Jhamtani

Key dates

this monthRegisteredApr 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed106 files

Current status

94%75 of 80 units booked
82.3%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA121280080

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

Wing A: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed97

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots97
Closed/Covered97

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,673 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Pramod Dattatraya Ursal-Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Muncipal Corporation
Permissible FSI7917.98
Proposed, not sanctioned7,907 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune
Estimated costRs 30.83 cr
Cost incurredRs 25.37 cr
Work done82.28%
BuildingWingEstimatedIncurred
Wing ANARs 25.37 crRs 22.36 cr
-NARs 5.46 crRs 3.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSupa Associates
EngineerDinesh Ochani
EngineerAshish Borase
Chartered AccountantANJK & CO LLP
Chartered AccountantL B Laddha & Co.
PartnerRole in project
Global Reality-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: CC_12_09_2025.pdf29 Jun 2026
Occupational CertificateFile: Layout Approved.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 1.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 2.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 3.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 4.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 5.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 6.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 7.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 8.pdf29 Jun 2026
Occupational CertificateFile: Building Plan 9..pdf29 Jun 2026
Occupational CertificateFile: Building Plan 10.pdf29 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate - 2024-2025.pdf7 Oct 2025
Occupational CertificateFile: Occupancy Certificate.pdf7 Oct 2025
Occupational CertificateFile: Form 4.pdf7 Oct 2025
Occupational CertificateFile: CC Verification Mail to RERA.pdf7 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Global Realty - Sign.pdf4 Oct 2025
Withdrawal Update Form 1File: Architect certificate (2).pdf16 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate pdf.pdf16 Jul 2025
Withdrawal Update Form 3File: ANJK Scan copy pdf.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - March 2025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2025 - Signed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate - March 2025.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - December 2024 - Signed.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 24.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Inventory.pdf17 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 Global Enrise_FY 2023-24.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - September 2024 - Sign.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - June 2024 Signed_11zon.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed.pdf11 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate_11zon.pdf6 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineers Certificate_11zon.pdf6 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Inventory_11zon.pdf6 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - December 2023 Signed_11zon.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certficate.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: DIS Signed.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form 5 Global Enrise_FY 2022-23 Signed.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Form 1 Signed.pdf13 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2.pdf13 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - Signed.pdf13 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Signed_compressed.pdf13 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of inventory.pdf22 Jan 2023
Layout approvalFile: Layout Approval.pdf21 Jan 2023
Building plan approvalFile: Builing Plans (1).pdf21 Jan 2023
Building plan approvalFile: Builing Plans (2).pdf21 Jan 2023
Building plan approvalFile: Builing Plans (3).pdf21 Jan 2023
Building plan approvalFile: Builing Plans (4).pdf21 Jan 2023
Building plan approvalFile: Builing Plans (5).pdf21 Jan 2023
Building plan approvalFile: Builing Plans (6).pdf21 Jan 2023
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (1).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (2).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (3).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (4).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (5).pdf21 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Builing Plans (6).pdf21 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf21 Jan 2023
Declaration about Commencement CertificateFile: CC Declaration GR Final.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate1.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf6 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC Certificate_compressed.pdf4 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf4 Sep 2022
Proforma of Allotment letterFile: REVISED DRAFT AGREEMENT.pdf4 Sep 2022

How this compares with Pune

94%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Global Enrise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivraj Nagar, Village Rahatani13,700+ in Pune

Builder: Global Reality

Global Reality has 1 registration on MahaRERA, including Global Enrise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Global Enrise is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Global Enrise?

The registered promoter entity is Global Reality, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Global Enrise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Global Enrise?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Global Enrise?

The professionals named in the filing: Architect: Supa Associates; Engineer: Dinesh Ochani; Engineer: Ashish Borase; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: L B Laddha & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Global Enrise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Global Enrise. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Global Enrise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.