Home / Browse projects / Pune, Maharashtra / GHANWAT SQUARE

Completed No litigation declared Commercial project

GHANWAT SQUARE

By SHIVAM DEVELOPERS PVT. LTD.

RG-MH-15385 · RERA P52100025403 · Last updated on MahaRERA portal: 3 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 29 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 85%
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

GHANWAT SQUARE is a Commercial project by SHIVAM DEVELOPERS PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100025403 on 21 May 2020. The registration is recorded completed; possession was promised by 30 Nov 2025. The completion date has moved by 29 months from the original filing.

At a glance

Project

  • NameGHANWAT SQUARE
  • TypeCommercial
  • Location
    • MAHALUNGE
    • Khed
    • Pune
    • 410501
  • Pincode410501
  • RERA no.P52100025403
  • ReraGenie IDRG-MH-15385

Builder

  • NameSHIVAM DEVELOPERS PVT. LTD.
  • Entity typeCompany
  • Managing DirectorsRajendra Popat Ghanwat, Popat Maruti Ghanwat
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects6 →

Key dates

this monthRegisteredMay 2020First promiseJun 2023Revised toNov 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 May 2020
  • Promised completion30 Nov 2025
  • Revised completionRevised to 30 Nov 2025 (originally 30 Jun 2023)
  • Buildings1 building record
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GHANWAT SQUARENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

GHANWAT SQUARE: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Open Space12

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,316 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
SUNIL HARI BHALERAOAndheriMumbai Suburban
DILIP HARI BHALERAOBadlapur (M Cl)Thane
PANDURANG NAMDEO BHALERAOMahalungePune
SMT SUNANDA HARI BHALERAOAndheriMumbai Suburban
SMT JYOTI ANIL BHALERAOBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI1978.15
Proposed, not sanctioned1,378 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGAVI PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectiDEAS AND iMAGES
EngineerASHOK KHONDE
Chartered AccountantMSDN & ASSOCIATES
PartnerRole in project
SHIVAM DEVELOPERS PVT. LTD.-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018402Jun 2023 → Jun 2024

Reason as filed by the promoterDue to some financial issues

EXT52100025165Jun 2023 → Nov 2025

Reason as filed by the promoterDue to shortage of skilled workers, and due to ongoing assembly elections concerned authority were unable to coorperate in processing completion of the said project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 May 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2025

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Ghanwat Square-2025Mar31.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (1).pdf3 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf3 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GHAWAT SQUARE - SANCTION ORDER (COMPLETION CERTIFICATE).pdf21 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 SDPL GS.pdf13 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GC- Form 5.pdf7 Mar 2025
Declaration in FORM BFile: Form -B- Ghanwat square promoter-compressed.pdf4 Mar 2025
Disclosure of sold/ booked inventoryFile: G's sold unsold.pdf4 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS form1 Dt-31-12-24.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS form 2- Engineer certificate Dt-31-12-24.pdf12 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GS form 2a Dt- 31-12-24.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Ghanwat Square-2024Dec31dsc.pdf8 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: from 5 GS.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_GS_2023-24.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-FORM3-SEP 2024.pdf30 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-F3-JUN 2024.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-SEP 24.pdf12 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-SEP 2024.pdf12 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GS-F2A-SEP24.pdf12 Nov 2024
Disclosure of sold/ booked inventoryFile: GS sold unsold.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-JUN 2024.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-JUN 2024.pdf27 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GS-F2A-JUN 2024.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: GS-SU-JUN2024.pdf27 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-SU-JUN2024.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-MAR 24.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-MAR 24.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GS-F2A-MAR 24 1.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: S-U-GS-MAR 2024.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-FORM3-MARHCH 2024.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-DEC 23.pdf26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-DEC 23.pdf26 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GS-F2A-DEC 23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: GS-SOLD UNSOLD- 26 DEC 23.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-F3-DEC 23 (2).pdf26 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GS-F5-FY 2022-2023.pdf3 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GS-F5-FY 2022-2023.pdf30 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_GS_FY_22-23.pdf29 Dec 2023
Declaration in FORM BFile: declaration scan for extension gs.pdf28 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-SEP 2023.pdf28 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GS-F2A-SEP 2023.pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: GS-SOLD UNSOLD- 26 DEC 23.pdf28 Dec 2023
Details of encumbrances concerned to FinanceFile: Icici Mortgage deed 8306-2022.pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: Icici Mortgage deed 8306-2022.pdf26 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-SEP 2023.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: GS-SOLD UNSOLD- SEP 23.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-F3-SEP 2023.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: S-U-GS-JUN 23.pdf4 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-F3-JUN 23.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-JUN 23_compressed.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2- JUN 23.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GS-F2A-JUN 23 1.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-MARCH 2023_compressed.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2-MARCH 2023.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GS-F2A-MARCH 2023.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: S-U-GS-dec 2022.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: S-U-GS-MARCH 2023.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-FORM 3-MARCH 2023.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-SEP22.pdf21 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-F1-DEC22_compressed.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-F2- DEC22.pdf21 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GS-F2A-DEC22.pdf21 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GS-F3-DEC22.pdf21 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS-FORM2-SEP22.pdf27 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GS-FORM2A-SEP22.pdf27 Dec 2022
Disclosure of sold/ booked inventoryFile: GS-SOLDUNSOLD-SEP22.pdf27 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (GS)-SEP22.pdf26 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GS-FORM5APR-21-MAR22.pdf15 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-FORM 1 - JUN 22.pdf27 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GS F2 JUN 22.pdf23 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GS-F2A-JUN 22.pdf23 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2-GS-MARCH 22.pdf21 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F2A-GS- MARCH 22.pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: March 22 sold unsold.pdf19 Jul 2022
Disclosure of sold/ booked inventoryFile: June 22 sold unsold.pdf19 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS-FORM 1-MARCH 22.pdf15 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ghanwat square - march 22_compressed.pdf15 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-Ghanwat Sq-Dec21-DSC.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS F 1 Dec 21.pdf10 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: gs aRTICHECT cERTIFICATE-compressed.pdf8 Jan 2022

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHIVAM CASANr Shivam Majestica Choudhary Park Area Wakad Pune 411 0578CompletedOct 2015Late, Oct 2016
SHIVAM NITYANR SHIVAM MAJESTICA CHOUDHARY PARK AREA WAKAD PUNE-4110578CompletedJan 2015Late, Jul 2015
SHIVAM NITYANR SHIVAM MAJESTICA CHOUDHARY PARK AREA WAKAD PUNE-4110578CompletedJan 2015Late, Jul 2015
GHANWAT PLAZAChakan Talegaon Road Nanekar Wadi Chakan- 410111CompletedSep 2013Late, Aug 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 29 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GHANWAT SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHALUNGE13,700+ in Pune

Builder: SHIVAM DEVELOPERS PVT. LTD.

SHIVAM DEVELOPERS PVT. LTD. has 3 registrations on MahaRERA, including SHIVAM GREENCOURT and GHANWAT SQUARE. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GHANWAT SQUARE is delayed beyond 30 Nov 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GHANWAT SQUARE?

The registered promoter entity is SHIVAM DEVELOPERS PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GHANWAT SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GHANWAT SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GHANWAT SQUARE?

The professionals named in the filing: Architect: iDEAS AND iMAGES; Engineer: ASHOK KHONDE; Chartered Accountant: MSDN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GHANWAT SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GHANWAT SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GHANWAT SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.