Completed No litigation declared Others project

GEETANJALI SOLITAIRE

By SIDDHARTH PROGRESSIVE

RG-MH-28003 · RERA P52000025173 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
60 of 149Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

GEETANJALI SOLITAIRE is a Others project by SIDDHARTH PROGRESSIVE in Raigarh, Maharashtra, registered with MahaRERA as P52000025173 on 20 Mar 2020. The registration is recorded completed; possession was promised by 30 Jan 2027. 89 of the 149 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameGEETANJALI SOLITAIRE
  • TypeOthers
  • Location
    • UNNAMED
    • SECTOR-24
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000025173
  • ReraGenie IDRG-MH-28003

Builder

  • NameSIDDHARTH PROGRESSIVE
  • Entity typePartnership
  • PartnersSHAILESH ARDESHANA, SAHEBRAO KHILARI, GEETA ARDESHANA, ANJALI KHILARI
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2020PromisedJan 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Mar 2020
  • Promised completion30 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Current status

60%89 of 149 units booked
98.6%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GEETANJALI SOLITAIRENA252412821149

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

GEETANJALI SOLITAIRE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered76

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Apr 2026
LandownerVillageDistrict
SIDDHARTH ARDESHANAKhargharRaigarh
SHAILESH ARDESHANAKhargharRaigarh
GEETA ARDESHANAKhargharRaigarh
SAHEBRAO SUKHDEO KHILARIKhargharRaigarh
ANJALI KHILARIKhargharRaigarh

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI6475.71
Proposed, not sanctioned6,476 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNES INTERNATIONAL SCHOOL BLDG, MALBAR HILL ROAD, VASANT GARDEN, MULUND WEST, MUMBAI-400082
Estimated costRs 35.92 cr
Cost incurredRs 35.44 cr
Work done98.64%
BuildingWingEstimatedIncurred
GEETANJALI SOLITAIRENARs 30.54 crRs 30.54 cr
-NARs 5.38 crRs 4.89 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectHemant Pandurang Dhavale
EngineerSAMARTH PRADEEPKUMAR AGARWAL
Chartered AccountantDHAVAL RACHCHH
PartnerRole in project
SIDDHARTH PROGRESSIVE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Last Approved Plan.pdf9 May 2026
Building plan approvalFile: Last Approved Plan.pdf9 May 2026
Commencement certificateFile: CC solitaire.pdf9 May 2026
Withdrawal Update Form 1File: Q3-2025-26.pdf9 May 2026
Withdrawal Update Form 2File: Q3-2025-26.pdf9 May 2026
Withdrawal Update Form 3File: FORM 3 GEETANJALI SOLITAIRE_16-01-2026.pdf9 May 2026
Occupational CertificateFile: OC_Solitaire.pdf9 May 2026
Withdrawal Update Form 1File: Q1-2025-26.pdf10 Mar 2026
Withdrawal Update Form 1File: Q2-2025-26.pdf10 Mar 2026
Withdrawal Update Form 1File: Q3-2025-26.pdf10 Mar 2026
Withdrawal Update Form 2File: Q1-2025-26.pdf10 Mar 2026
Withdrawal Update Form 2File: Q2-2025-26.pdf10 Mar 2026
Withdrawal Update Form 2File: Q3-2025-26.pdf10 Mar 2026
Withdrawal Update Form 3File: Q1-2025-26.pdf10 Mar 2026
Withdrawal Update Form 3File: Q2-2025-26.pdf10 Mar 2026
Withdrawal Update Form 3File: Q3-2025-26.pdf10 Mar 2026
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERTIFICATE GEETANJALI SOLITAIRE 31122023.pdf7 Mar 2026
Withdrawal Update Form 2File: FORM-2 ENGINEER CERTIFICATE GEETANJALI SOLITAIRE 31122023.pdf7 Mar 2026
Withdrawal Update Form 3File: FORM -3 Siddharth Progessive_.pdf7 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE GS MARCH 2025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddharth_Progressive_FORM 3 Excel 31032025 (1).pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE GS MARCH 2025.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 30062024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE GS SEP-2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE GS DEC 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddharth_Progressive_Form-3_30-06-24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddharth_Progressive_Form-3_30-09-24.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddharth_Progressive_Form-3_31-12-24.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 30062024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM-2 ENGINEER CERTIFICATE GS SEP-2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CARTIFICATE GS DEC 2024.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 2022-23 GEETANJALI SOLITAIRE.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24 GEETANJALI SOLITAIRE.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE GS MARCH 2024.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA CERTIFICATE GS MARCH 2024.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE GS MARCH 2024.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 30092023.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE GEETANJALI SOLITAIRE 31122023.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 30092023.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE GEETANJALI SOLITAIRE 31122023.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 Siddharth Progessive_.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 Siddharth Progessive_.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 30062023.pdf9 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 30062023.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddharth_Progressive_CA_Certificate_Form_3_compressed.pdf9 Mar 2024
Declaration about Commencement CertificateFile: FORM-1 ARCHITECT CERTIFICATE 30092022.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 30092022.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31122022.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31032023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 30092022.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 31122022.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 31032023.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: q10 cacertificate.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: q10 cacertificate.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: q11 ca certificate.pdf25 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: q12 ca certificate.pdf25 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 30062022.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 30062022.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q9 CA CERTIFICATE.pdf22 Nov 2023
CERSAI detailsFile: Credai.pdf12 Oct 2023
Proforma of Agreement for saleFile: Agreement for sale.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Siddharth Progressive audit report fy 2021-22.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 30062021.pdf4 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE.pdf4 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31122021.pdf4 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT CERTIFICATE 31032022.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 30062021.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 31122021.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE 31032022.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Excel 30062021 pdf.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30092021_compressed.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE 31122021.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf4 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf2 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf2 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30092020.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122020.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032021.pdf1 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 30092020.pdf1 May 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GEETANJALI SUJAYKHARGHAR44CompletedJun 2018Mar 2018

How this compares with Raigarh

60%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GEETANJALI SOLITAIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SECTOR-245,900+ in Raigarh

2 kmGEETANJALI SOLITAIRECompleted 33Lapsed / revoked 11Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: SIDDHARTH PROGRESSIVE

SIDDHARTH PROGRESSIVE has 2 registrations on MahaRERA, including GEETANJALI SUJAY and GEETANJALI SOLITAIRE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GEETANJALI SOLITAIRE is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GEETANJALI SOLITAIRE?

The registered promoter entity is SIDDHARTH PROGRESSIVE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GEETANJALI SOLITAIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GEETANJALI SOLITAIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GEETANJALI SOLITAIRE?

The professionals named in the filing: Architect: Hemant Pandurang Dhavale; Engineer: SAMARTH PRADEEPKUMAR AGARWAL; Chartered Accountant: DHAVAL RACHCHH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GEETANJALI SOLITAIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GEETANJALI SOLITAIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GEETANJALI SOLITAIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.