Home / Browse projects / Raigarh, Maharashtra / Geetanjali Beauty Tower CHSL

Registration lapsed No litigation declared Others project

Geetanjali Beauty Tower CHSL

By J M M Homes

RG-MH-30585 · RERA P52000031325 · Last updated on MahaRERA portal: 19 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 18 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
16 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 95%
97 of 164Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

Geetanjali Beauty Tower CHSL is a Others project by J M M Homes in Raigarh, Maharashtra, registered with MahaRERA as P52000031325 on 15 Oct 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 18 months from the original filing. 67 of the 164 units on this registration are recorded sold or booked, and 16 of 44 construction stages are filed complete.

At a glance

Project

  • NameGeetanjali Beauty Tower CHSL
  • TypeOthers
  • Location
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000031325
  • ReraGenie IDRG-MH-30585

Builder

  • NameJ M M Homes
  • Entity typePartnership
  • PartnersJ M Mhatre Infra Private Limited, Chetan Janardan Mhatre
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredOct 2021First promiseDec 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Oct 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2024)
  • Buildings4 building records
  • Documents filed117 files

Current status

41%67 of 164 units booked
71.7%Work done, per cost certificate

Figures as on 19 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A -WingNA15916925
B -WingNA159281846
C -WingNA159281846
D -WingNA1510321547

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A -Wing68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B -Wing68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
C -Wing68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
D -Wing68%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered132
BuildingClosed/CoveredTotal
A -Wing3333
B -Wing3333
C -Wing3333
D -Wing3333

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,445 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Jan 2026
LandownerVillageDistrict
Geetanjali Beauty Tower Co.Op.Hsg.Soc.LtdPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI13510.32
Proposed, not sanctioned9,667 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHdfc Bank Ltd, Nirman Chs , Shop No 3 Sec 13 Khanda Colony, New Panvel, Navi Mumbai Raigad Maharasht
Estimated costRs 49.08 cr
Cost incurredRs 35.17 cr
Work done71.66%
BuildingWingEstimatedIncurred
A -WingNARs 11.66 crRs 8.52 cr
B -WingNARs 11.66 crRs 8.52 cr
C -WingNARs 11.66 crRs 8.52 cr
D -WingNARs 11.66 crRs 8.52 cr
-NARs 2.45 crRs 1.08 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Atul Mhatre
EngineerSK Consultants & Engineerrs
Chartered AccountantVikas Abhang & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
J M M Homes-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000027291Dec 2024 → May 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-05-2025 to complete the project and fulfil all regulatory requirements.

EXT52000028342Dec 2024 → Dec 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. Given the circumstances, we kindly request an extension until 31-12-2025 to complete the project and fulfil all regulatory requirements.

EA06012619308Dec 2024 → Jun 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen circumstances, including procurement issues, financial constraints, and site challenges. Despite these setbacks, we are working diligently to address these issues and complete the remaining work.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Geetanjali_Beauty_Tower_Chsl_Form1_Q1_2026-27_17-07-2026_14-14.pdf19 Jul 2026
Withdrawal Update Form 2File: Geetanjali_Beauty_Tower_Chsl_Form2_Q1_2026-27_17-07-2026_14-14.pdf19 Jul 2026
Withdrawal Update Form 3File: Geetanjali_Beauty_Tower_Chsl_Form3_Q1_2026-27_17-07-2026_10-07_doc1.pdf19 Jul 2026
Withdrawal Update Form 1File: Form 1 - Geetanjali Beauty Tower CHSL as on March 2026.pdf16 May 2026
Withdrawal Update Form 2File: Form 2 - Geetanjali Beauty Tower CHSL as on March 2026.pdf16 May 2026
Withdrawal Update Form 3File: Form 3 - Geetanjali Beauty Tower CHSL as on March 2026.pdf16 May 2026
Withdrawal Update Form 1File: Form 1 - Geetanjali Beauty Tower CHSL as on June 2024.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2 - Geetanjali Beauty Tower CHSL as on June 2024.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3 - Geetanjali Beauty Tower CHSL as on Dec 2025.pdf19 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 - Geetanjali Beauty Tower CHSL for FY 2024-25.pdf29 Dec 2025
Form 1File: Form 1 - Geetanjali Beauty Tower CHSL as on Sept 2025.pdf22 Oct 2025
Form 2File: Form 2 - Geetanjali Beauty Tower CHSL as on Sept 2025.pdf22 Oct 2025
Form 3File: Form 3 - Geetanjali Beauty Tower CHSL as on Sept 2025.pdf22 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Geetanjali Beauty Tower CHSL as on Sept 2025.pdf22 Oct 2025
Form 1File: Form 1 - Geetanjali Beauty Tower CHSL as on June 2025.pdf24 Jul 2025
Form 2File: Form 2 - Geetanjali Beauty Tower CHSL as on June 2025.pdf24 Jul 2025
Form 3File: Form 3 - Geetanjali Beauty Tower CHSL as on June 2025.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Geetanjali Beauty Tower CHSL as on June 2025.pdf24 Jul 2025
Other - TechnicalFile: Project PERT overview (19)_11zon.pdf2 Jun 2025
Other - TechnicalFile: Scan 02 Jun 25 14·48·07.pdf2 Jun 2025
Other - TechnicalFile: PERT Chart GBT.pdf17 May 2025
Declaration in FORM BFile: 2 Form B (1).pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24) (8).pdf6 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 CA Certificate_11zon.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 Engineers certificate_11zon.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: 8 Circular 29_11zon.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Geetanjali Beauty Tower CHSL as on March 2025.pdf18 Apr 2025
Building plan approvalFile: Plans - Geetanjali.pdf13 Feb 2025
Declaration in FORM BFile: Form B Affidavit Cum Declartion (1).pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Geetangali New CC (1).pdf13 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plans - Geetanjali.pdf13 Feb 2025
Declaration about Commencement CertificateFile: declaration about CC Format D (1).pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 27-Jan-2025_11zon.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf10 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23_11zon.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 5 FY 2023-24_11zon.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Geetanjali CHS_11zon.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Geetanjali_11zon.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: booked inventory Geetanjali_11zon.pdf24 Jan 2025
Declaration in FORM BFile: affidavit cum declaration (3).pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Architect Certificate_11zon.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30092024_11zon.pdf21 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate Bank acc.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality 21-22.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality 22-23.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality 23-24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on 31-12-2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Geetanjali Beauty Tower CHSL as on Sep 2024.pdf14 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Revised Form 5_Geetanjali Beauty FY 2023-24.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on Sept 2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Geetanjali Beauty Tower CHSL as on June 2024.pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Geetanjali Beauty Tower CHSL as on March 2024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Geetanjali Beauty Tower CHSL as on March 2024.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Geetanjali Beauty Tower CHSL as on Dec 2023.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Geetanjali Beauty Tower CHSL as on Dec 2023.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Geetanjali Beauty Tower CHSL as on 31-12-2023.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JMM Homes Geetanjali as on June 2023.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JMM Homes Geetanjali as on September 2023.pdf9 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- JMM Homes Geetanjali as on September 2023.pdf5 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- JMM Homes Geetanjali as on September 2022.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Geetanjali Beauty Tower CHSL Dec 22 - Form 2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Geetanjali Beauty Tower CHSL Mar 23 - Form 2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Geetanjali Beauty Tower CHSL Jun 23 - Form 2.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Geetanjali Beauty Tower CHSL Sept 23 - Form 2.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- JMM Homes Geetanjali as on September 2022.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_30-09-2023.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_31-12-2022.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_31-03-2023.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_30-06-2023.pdf2 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_JMM Homes Geetanjali_30-09-2023.pdf2 Nov 2023

How this compares with Raigarh

41%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 18 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Geetanjali Beauty Tower CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmGeetanjali Beauty Tower Completed 246Lapsed / revoked 69Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 469 registered projects within 2 km.

Builder: J M M Homes

J M M Homes has 3 registrations on MahaRERA, including Geetanjali Beauty Tower CHSL and Satyam Shivam Sundhram. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Geetanjali Beauty Tower CHSL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Geetanjali Beauty Tower CHSL is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Geetanjali Beauty Tower CHSL?

The registered promoter entity is J M M Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Geetanjali Beauty Tower CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Geetanjali Beauty Tower CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Geetanjali Beauty Tower CHSL?

The professionals named in the filing: Architect: Architect Atul Mhatre; Engineer: SK Consultants & Engineerrs; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Geetanjali Beauty Tower CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Geetanjali Beauty Tower CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Geetanjali Beauty Tower CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.