Home / Browse projects / Nashik, Maharashtra / GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD
GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD
RG-MH-61174 · RERA P51600015675 · Last updated on MahaRERA portal: 31 Jan 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD is a Residential / Group Housing project by VEDANT CONSTRUWELL in Nashik, Maharashtra, registered with MahaRERA as P51600015675 on 16 Mar 2018. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameGAYATRIDHAM CO-OP.HOUSING SOCIETY LTD
- TypeResidential / Group Housing
- Location
- LAM ROAD
- NEAR SANSARI NAKA
- SANSARI
- Nashik
- 422101
- Pincode422101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600015675
- ReraGenie IDRG-MH-61174
Builder
- NameVEDANT CONSTRUWELL
- Entity typePartnership
- PartnersMOHAN ARJUN PATEL, NARSHI KANJI PATEL, ANKUR JITENDRA BHAGAT
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on16 Mar 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2022)
- Buildings5 building records
- Documents filed81 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 4 | 0 | 0 | 0 | 0 |
| B WING | NA | 4 | 0 | 0 | 0 | 0 |
| C WING | NA | 4 | 0 | 0 | 0 | 0 |
| D WING | NA | 4 | 0 | 0 | 0 | 0 |
| E WING | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 31 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D WING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 31 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 60% |
| Open Parking | Yes | 0% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| A WING | 12 | 12 |
| B WING | 12 | 12 |
| C WING | 12 | 12 |
| D WING | 12 | 12 |
| E WING | 2 | 2 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GAYATRIDHAM CO-OP HOUSING SOCIETY LTD | SANSARI | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHARAM PAPNEJA |
| Engineer | AMIT DHOLU |
| Chartered Accountant | RAJESH DHOLU AND ASSOCIATES |
| Chartered Accountant | K R DHOLU AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| VEDANT CONSTRUWELL | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSO FAR THERE IS NO ANY APARTMENT BOOKED TILL DATE AND THERE IS NO DEMAND OF FLATS IN THAT AREA WHERE PROJECT IS LOCATED.WE NEED MORE TIME TO COMPLETE THE PROJECT THAN AS WE EXPECTED AT THE TIME OF OBTAINING RERA REGISTRATION.ORIGINALLY WE APPLIED FOR CORRECTION BUT IT IS REJECTED ON DESK 4 STATING REAPPLY UNDER SECTION 7(3) WITH NOC FROM SOCIETY.WE HAVE OBTAINED NECESSARY NOC FROM SOCIETY AND REAPPLYING FOR EXTENSION UNDESR SECTION 7(3).
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Jan 2024
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Adobe Scan 24 Jan 2024.pdf | 31 Jan 2024 |
| Certificates of CA (Form 5)File: Form 5 ON COMPLETION.pdf | 25 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CLARIFICATION FOR QUERY.pdf | 24 Jan 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: COMPLETION CERTIFICATE_compressed.pdf | 10 Jan 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf | 10 Jan 2024 |
| Status of ConveyanceFile: CONVEYANCE DEED_compressed.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certificate sep end2023_compressed.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: inventory sep quater_compressed.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A CONSTRUWELL FINAL.pdf | 22 Sep 2023 |
| Certificates of CA (Form 3)File: REVISED FORM 3 VEDANT CONSEUWELL_compressed.pdf | 22 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CONSTRUWELL FINAL.pdf | 22 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar certif june 2023 vedant construwell_compressed.pdf | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: inventory 30-6-23 vedant construwell.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCH Construwell FINAL.pdf | 19 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CONSTRUWELL FINAL_11zon.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A CONSTRUWELL FINAL.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: inventory CONSTRUWELL Final.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA CONSTRUWELL FINAL_11zon.pdf | 19 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc certificate_compressed.pdf | 6 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory dec quater 2022.pdf | 6 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc certificate.pdf | 8 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: inventory details gayatridham.pdf | 8 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf | 1 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 DEOLALI.pdf | 1 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 7 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2_compressed.pdf | 7 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: INVENTORY 30-6-22.pdf | 7 Jul 2022 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 7 Jul 2022 |
| Certificates of CA (Form 5)File: FORM 5 FINAL_compressed.pdf | 2 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH certificate.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg certificate FORM 2.pdf | 7 Apr 2022 |
| Form 2AFile: quality assurance certificate.pdf | 7 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: vc invetory.pdf | 7 Apr 2022 |
| Certificates of CA (Form 3)File: FORM 3.pdf | 7 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: amit cert_compressed.pdf | 7 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH VC_compressed.pdf | 11 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Details 31122021.pdf | 7 Jan 2022 |
| Certificates of CA (Form 3)File: FORM 3 FINAL VC.pdf | 7 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_compressed.pdf | 8 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf | 8 Oct 2021 |
| Form 2AFile: FORM 2A_compressed.pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: BK (1).pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: BK (2).pdf | 8 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: INVENTORY DETAILS.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: VC FORM 3 30092021.pdf | 6 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VEDANT CONSTRUWELL.pdf | 12 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 3062021.pdf | 9 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A JUNE 21_compressed.pdf | 9 Aug 2021 |
| Certificates of CA (Form 3)File: FORM 3 30062021 VC.pdf | 9 Aug 2021 |
| Form 2AFile: FORM 2A JUNE 21_compressed.pdf | 5 Aug 2021 |
| Form 2AFile: FORM 2A MARCH 21_compressed.pdf | 5 Aug 2021 |
| Certificates of CA (Form 3)File: FORM 3 31321.pdf | 3 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: 29 Jul 2021_compressed.pdf | 29 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 3132021.pdf | 6 Jul 2021 |
| Certificates of CA (Form 5)File: FORM 5 3132021.pdf | 7 Apr 2021 |
| Certificates of CA (Form 3)File: FORM 3 31320 FINAL.pdf | 4 Aug 2020 |
| Certificates of CA (Form 5)File: FORM 5 31320.pdf | 4 Aug 2020 |
| Form 2AFile: 2A CERTIFICATE VEDANT CONSTRUWELL.pdf | 5 Nov 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 31319.pdf | 30 Oct 2019 |
| Form 2AFile: 2A VEDANT CONSTRUWELL.pdf | 2 Aug 2019 |
| Form 2AFile: 2A VEDANT CONSTRUWELL.pdf | 2 Aug 2019 |
| Building plan approvalFile: REVISED APPROVED PLAN 250319.pdf | 25 Mar 2019 |
| Building Plan Approval (IOD)File: REVISED APPROVED PLAN 250319.pdf | 25 Mar 2019 |
| Form 2AFile: 2A VEDANT CONSTRUWELL.pdf | 25 Mar 2019 |
| Certificates of CA (Form 5)File: FORM 5 VEDANT CONSTRUWELL.pdf | 15 Sep 2018 |
| Layout approvalFile: SITE LAYOUT.pdf | 21 Mar 2018 |
| Building plan approvalFile: BUILDING PLAN.pdf | 21 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SITE LAYOUT.pdf | 21 Mar 2018 |
| Building Plan Approval (IOD)File: BUILDING PLAN.pdf | 21 Mar 2018 |
| Layout approvalFile: SITE LAYOUT - OK.pdf | 6 Mar 2018 |
| Building plan approvalFile: BUILDING PLAN-OK.pdf | 6 Mar 2018 |
| PAN CardFile: PAN CARD VEDANT CONSTUWELL-OK.pdf | 6 Mar 2018 |
| Copy of the legal title reportFile: TITLE REPORT - OK.pdf | 6 Mar 2018 |
| Details of encumbrancesFile: No Encumberances Declaration-OK.pdf | 6 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SITE LAYOUT - OK.pdf | 6 Mar 2018 |
| Building Plan Approval (IOD)File: BUILDING PLAN-OK.pdf | 6 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-OK.pdf | 6 Mar 2018 |
| Declaration in FORM BFile: FORM B - OK.pdf | 6 Mar 2018 |
| Certificates of CA (Form 3)File: CA CERTIFICATE-OK-compressed.pdf | 6 Mar 2018 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER-OK.pdf | 6 Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
Keep GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR SANSARI NAKA4,100+ in Nashik
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: VEDANT CONSTRUWELL
VEDANT CONSTRUWELL has 1 registration on MahaRERA, including GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD?
The registered promoter entity is VEDANT CONSTRUWELL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: DHARAM PAPNEJA; Engineer: AMIT DHOLU; Chartered Accountant: RAJESH DHOLU AND ASSOCIATES; Chartered Accountant: K R DHOLU AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAYATRIDHAM CO-OP.HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback