Home / Browse projects / Pune, Maharashtra / GATHA AARAMBHA PHASE - II

Registered No litigation declared Residential / Group Housing project

GATHA AARAMBHA PHASE - II

By SHUBHARAMBH DEVELOPERS

RG-MH-40178 · RERA P52100045524 · Last updated on MahaRERA portal: 2 May 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

GATHA AARAMBHA PHASE - II is a Residential / Group Housing project by SHUBHARAMBH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100045524 on 24 May 2022. Possession is promised by 30 Dec 2027.

At a glance

Project

  • NameGATHA AARAMBHA PHASE - II
  • TypeResidential / Group Housing
  • Location
    • PALKHI VISAWA DEHU
    • DEHU
    • Haveli
    • Pune
    • 412109
  • Pincode412109
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045524
  • ReraGenie IDRG-MH-40178

Builder

  • NameSHUBHARAMBH DEVELOPERS
  • Entity typePartnership
  • GSTIN27AEIFS0931A1ZE
  • PartnersSHREEDHAR SAMBHAJI MODAK, SUJIT SHANTARAM RAYKAR, VINAYAK DILIP CHAKANKAR, SAMBHAJI DNYANOBA CHAKANKAR, VISHAL RAJENDRA CHAKANKAR, ANIL DASHRATH BADHE, LAXMAN KISAN GAIKWAD
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2022PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 May 2022
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA120000
BUILDING ANA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

BUILDING B65%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed206

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots206
Closed/Covered196
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
BUILDING B985103
BUILDING A985103

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,507 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
SAHADU NAMADEV PARANDVALDEHUPune
VIJAY SAHADU PARANDWALDEHUPune
VINAYAK SAHADU PARANDWALDEHUPune
VAIJAYANTI BALASAHEB ALHATMoshiPune
VANDANA CHANDRAKANT KUDALEDhayari (Part)Pune
VANITA PANDURANG BHUJBALKothrudPune

Approvals and building plan

Permissible FSI14661.57
Proposed, not sanctioned7,642 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYRAJ BUILDING, NEAR KASHIBAI NAVALE HOSPITAL, DHAYARI PHATA, NARHE ROAD, PUNE - 411041

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUGAM ASSOCIATES
EngineerSACHIN SUKUMAR DOSHI
Chartered AccountantJEEVAN KISHOR PATIL
PartnerRole in project
SHUBHARAMBH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 - Form1 - 05-07-2022.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Form1 - 05-04-2025.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 - Form1 - 05-01-2025.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 - Form1 - 05-10-2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 - Form1- 05-07-2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Form1 - 05-04-2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 - Form1- 02-02-2024.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 - Form1 - 05-10-2023.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 - Form1 - 09-09-2023.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 - Form1 - 05-04-2023.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 - Form1 - 05-01-2023.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2 - Form1 - 05-10-2022.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q4 - 2024-25.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3 - 2024-25.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q2 - 2024-25.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 - 2024-25.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q4 - 2023-24.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3 - 2023-24.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 - 2023-24.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q4 - 2022-23.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3 - 2022-23.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q2 - 2022-23.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 - 2022-23.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q2 - 2023-24.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 - Form2.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 - Form2 - 30-09-2023.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 - Form2 - 30-06-2023.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 - Form2 - 31-03-2023.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 - Form2 - 31-12-2022.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2 - Form2 - 30-09-2022.pdf2 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 - Form2 - 30-06-2022.pdf2 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf2 May 2025
Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form2A - 31-03-2023.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form2A - 31-03-2024.pdf2 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Inventory Details.pdf15 Jul 2022
Declaration in FORM BFile: Form B Partner.pdf19 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Updated - CA Certificate.pdf19 May 2022
Layout approvalFile: PLAN_2.pdf16 May 2022
Layout approvalFile: PLAN_3.pdf16 May 2022
Layout approvalFile: PLAN_4.pdf16 May 2022
Layout approvalFile: PLAN_5.pdf16 May 2022
Layout approvalFile: PLAN_1 (MAIN PLAN LAYOUT).pdf16 May 2022
Building plan approvalFile: NA ORDER.pdf16 May 2022
PAN CardFile: PAN CARD.pdf16 May 2022
Copy of the legal title reportFile: SEARCH REPORT.pdf16 May 2022
Details of encumbrancesFile: DETAILS OF ENCUMBRANCES.pdf16 May 2022
Copy of Layout Approval (in case of layout)File: PLAN_1 (MAIN PLAN LAYOUT).pdf16 May 2022
Copy of Layout Approval (in case of layout)File: PLAN_2.pdf16 May 2022
Copy of Layout Approval (in case of layout)File: PLAN_3.pdf16 May 2022
Copy of Layout Approval (in case of layout)File: PLAN_4.pdf16 May 2022
Copy of Layout Approval (in case of layout)File: PLAN_5.pdf16 May 2022
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf16 May 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf16 May 2022
Declaration about Commencement CertificateFile: FORM D.pdf16 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 (ARCHITECT CERTIFICATE).pdf16 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER CERTIFICATE).pdf16 May 2022
CERSAI detailsFile: CERSAI UNDERTAKING.pdf16 May 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf16 May 2022
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf16 May 2022

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GATHA AARAMBHA PHASE - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEHU13,700+ in Pune

2 kmGATHA AARAMBHA PHASE - ICompleted 13Lapsed / revoked 9Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SHUBHARAMBH DEVELOPERS

SHUBHARAMBH DEVELOPERS has 2 registrations on MahaRERA, including GATHA AARAMBHA PHASE - II and OASIS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GATHA AARAMBHA PHASE - II is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GATHA AARAMBHA PHASE - II?

The registered promoter entity is SHUBHARAMBH DEVELOPERS, a partnership as per the filing. Its GSTIN 27AEIFS0931A1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GATHA AARAMBHA PHASE - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GATHA AARAMBHA PHASE - II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GATHA AARAMBHA PHASE - II?

The professionals named in the filing: Architect: SUGAM ASSOCIATES; Engineer: SACHIN SUKUMAR DOSHI; Chartered Accountant: JEEVAN KISHOR PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GATHA AARAMBHA PHASE - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GATHA AARAMBHA PHASE - II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GATHA AARAMBHA PHASE - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.