ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GAT NO 833P VILLAGE- SHINDAVANE

Completed No litigation declared Plotted project

GAT NO 833P VILLAGE- SHINDAVANE

By NILESH GULAB CHOUDHARY

RG-MH-43348 · RERA P52100050600 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
22 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

GAT NO 833P VILLAGE- SHINDAVANE is a Plotted project by NILESH GULAB CHOUDHARY in Pune, Maharashtra, registered with MahaRERA as P52100050600 on 21 Apr 2023. The registration is recorded completed; possession was promised by 8 Oct 2025. The completion date has moved by 22 months from the original filing. 58 of the 80 units on this registration are recorded sold or booked.

At a glance

Project

  • NameGAT NO 833P VILLAGE- SHINDAVANE
  • TypePlotted
  • Location
    • NEAR PUNE SOLAPUR HIGHWAY
    • SHINDAVANE
    • SHINDVANE
    • Haveli
    • Pune
    • 412202
  • Pincode412202
  • RERA no.P52100050600
  • ReraGenie IDRG-MH-43348

Builder

  • NameNILESH GULAB CHOUDHARY
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2023First promiseDec 2023Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion8 Oct 2025
  • Revised completionRevised to 8 Oct 2025 (originally 31 Dec 2023)
  • BuildingsNot stated in filing
  • Documents filed45 files

Current status

72%58 of 80 units booked
0.0%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
VISHWANATH MAHADEV BHANDARI-Belgaum
NILESH GULAB CHOUDHARYSortapwadiPune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI14031.9
Proposed, not sanctioned14,032 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAASHRAM ROAD, URALI KANCHAN, PUNE
Estimated costRs 1.50 cr
Work done0.0%
BuildingWingEstimatedIncurred
-NARs 1.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND N PANCHAL N Panchal
EngineerANILKUMAR KUTE
Chartered AccountantSATPUTE & ASSOCIATES
Chartered AccountantHinge Kale Joshi & Petkar LLP
PartnerRole in project
NILESH GULAB CHOUDHARY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024291Dec 2023 → Dec 2024

Reason as filed by the promoterRespected Sir/Madam, The project is in the final phase of completion and required approvals regarding completion procedures from competent authority is taking time. I am continuously in touch and trying to accelerate the process. However I require more time to address issues beyond my control. I request you to kindly allow extended time till 30.12.2024. I am grateful for your cooperation.

EA21112518397Dec 2023 → Oct 2025

Reason as filed by the promoterWE HAVE RECEIVED THE FULL COMPLETION CERTIFICATE FROM PLANNING AUTHORITY ON 8/10/2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Apr 2026

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: GMAIL COPY.pdf30 Apr 2026
Withdrawal Update Form 1File: Form No 1 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 1File: Form No 1 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 1File: Form No 1 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 2File: Form No 2 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 2File: Form No 2 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 2File: Form No 2 SHINDAVNE.pdf24 Dec 2025
Withdrawal Update Form 3File: Signed Form 3.pdf24 Dec 2025
Withdrawal Update Form 3File: Signed Form 3.pdf24 Dec 2025
Withdrawal Update Form 3File: Signed Form 3.pdf24 Dec 2025
Completion CertificateFile: OC SHINDAVANE.pdf24 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MILIND PANCHAL ARCHITECH.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE OF COST_SHINDVANE 833.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf27 May 2024
Proforma of Agreement for saleFile: AFS140423.pdf14 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviations to APF 1404023final.pdf14 Apr 2023
Layout approvalFile: TSR-pg9and11.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg1and2.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg3and4.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg5and6.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg7and8.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg9and10.pdf1 Apr 2023
Copy of the legal title reportFile: TSR-pg9and11.pdf1 Apr 2023
Copy of Layout Approval (in case of layout)File: TSR-pg9and11.pdf1 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: NGC_ANNEXURE.pdf1 Apr 2023
Other - LegalFile: Land Owner.pdf10 Mar 2023
Other - TechnicalFile: FSI.pdf10 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200254008965_For_Asset_Based_Search_05_12_2022_17_37_14_504.pdf5 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf24 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf23 Nov 2022
Declaration about Commencement CertificateFile: COMMENCEMENT CERT.pdf21 Nov 2022
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_compressed.pdf21 Nov 2022
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER.pdf21 Nov 2022
Layout approvalFile: Sanctioned Plan_compressed.pdf19 Nov 2022
Building plan approval or NA orderFile: ORDER- PMRDA - GAT NO 833- 34-22-23 DATE 21-09-2022_compressed.pdf19 Nov 2022
Details of encumbrances concerned to FinanceFile: 1.pdf19 Nov 2022
Details of encumbrances concerned to LegalFile: 1.pdf19 Nov 2022
Copy of Layout Approval (in case of layout)File: Sanctioned Plan_compressed.pdf19 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: ORDER- PMRDA - GAT NO 833- 34-22-23 DATE 21-09-2022_compressed.pdf19 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: ORDER- PMRDA - GAT NO 833- 34-22-23 DATE 21-09-2022_compressed.pdf19 Nov 2022
Declaration in FORM BFile: Form-B-Nilesh Choudhari_compressed.pdf19 Nov 2022
Declaration in FORM BFile: Form-B-Vishwanath Bhandari_compressed.pdf19 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 3.pdf19 Nov 2022
PAN CardFile: Nilesh Sir-PAN Copy-PDF.pdf15 Nov 2022

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 22 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAT NO 833P VILLAGE- SHINDAVANE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHINDAVANE13,700+ in Pune

Builder: NILESH GULAB CHOUDHARY

NILESH GULAB CHOUDHARY has 1 registration on MahaRERA, including GAT NO 833P VILLAGE- SHINDAVANE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GAT NO 833P VILLAGE- SHINDAVANE is delayed beyond 8 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAT NO 833P VILLAGE- SHINDAVANE?

The registered promoter entity is NILESH GULAB CHOUDHARY, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAT NO 833P VILLAGE- SHINDAVANE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAT NO 833P VILLAGE- SHINDAVANE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAT NO 833P VILLAGE- SHINDAVANE?

The professionals named in the filing: Architect: MILIND N PANCHAL N Panchal; Engineer: ANILKUMAR KUTE; Chartered Accountant: SATPUTE & ASSOCIATES; Chartered Accountant: Hinge Kale Joshi & Petkar LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAT NO 833P VILLAGE- SHINDAVANE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAT NO 833P VILLAGE- SHINDAVANE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAT NO 833P VILLAGE- SHINDAVANE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.