Home / Browse projects / Thane, Maharashtra / GARDEN ESTATE
GARDEN ESTATE
RG-MH-96547 · RERA P51700011933 · Last updated on MahaRERA portal: 22 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 35 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 30 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GARDEN ESTATE is a Residential / Group Housing project by SHREE BALAJI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700011933 on 1 Sep 2017. Possession was promised by 28 Nov 2023 and is now 35 months past that date. The completion date has moved by 30 months from the original filing. 7 complaints are on record with the regulator.
At a glance
Project
- NameGARDEN ESTATE
- TypeResidential / Group Housing
- Location
- Mauje Mohane
- Ambivali Tarf Chon
- Kalyan
- Thane
- 421102
- Pincode421102
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700011933
- ReraGenie IDRG-MH-96547
Builder
- NameSHREE BALAJI DEVELOPERS
- Entity typePartnership
- PartnersVIJAYNARAYAN SHITLAPRASAD UPADHYAY, RAMNARAYAN SHITLAPRASAD UPADHYAY, BHARAT MALIK, KRISHANK MALIK, VINAYKUMAR SABHAJIT DUBEY
- Other registrations21 more →
- Completed6 of 22
- No longer live12 lapsed, de-registered or revoked
- Past their filed date1
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on1 Sep 2017
- Promised completion28 Nov 2023
- Revised completionRevised to 28 Nov 2023 (originally 28 May 2021)
- Buildings1 building record
- Documents filed78 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GARDEN ESTATE | NA | 8 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.
GARDEN ESTATE: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 92% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42% |
| Sanitary Fittings within the flats / premises | 46% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 13% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 22 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed20
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SHREE BALAJI DEVELOPERS | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to covid-19 Labors are not available as they are mostly from migrant category, so the completion of work is incomplete as compared to what we have predicted at the time of RERA registration and Due to market conditions the disbursement from customers was very low. Due to funds problems the work completed was slow as compared to what we have predicted at the time of RERA registration
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 59.46% allottees for purpose of extension of RERA registration period of the said project.
Reason as filed by the promoterThere was delay in the project due to Covid. We are now expecting the occupancy certificate as the project is entirely completed.
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197163 | Garden Estate Allottees AOP | Shree Balaji Developers | 04/07/2021 |
| CC006000000303228 | M/s. Shree Balaji Developers Ltd. | Mr. Kiran A. Badhekar | 08/11/2022 |
| CC006000000344200 | M/s. Shree Balaji Developers Ltd. | MRS. VANDANA MAHENDRA PATIL | 10/02/2023 |
| CC006000000396039 | MARUTI GANESH TARE | SHREE BALAJI DEVELOPERS | 09/06/2023 |
| CC006000000396800 | RATAN HARISHANKAR VARMA | Shree Balaji Developers | 29/07/2023 |
| CC006000000397238 | MUKUND JAYPRAKASH SATHE | SHREE BALAJI DEVELOPERS | 22/09/2023 |
| CC12501722 | SHREE BALAJI DEVELOPERS | Mr Ratan Harishankar Varma | 26/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Garden Estate for FY 23-24.pdf | 22 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Garden Estate as on December 2024.pdf | 10 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate as on December 2024.pdf | 10 Jan 2025 |
| Certificates of CA (Form 3)File: Final Form 3 - Garden Estate as on 30-09-2024.pdf | 18 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate as on Sept 2024.pdf | 18 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate as on June 2024.pdf | 13 Aug 2024 |
| Certificates of CA (Form 3)File: Form 3 - Garden Estate as on 30-06-2024.pdf | 13 Aug 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf | 20 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: 12 Certificates of CA (Form 3).pdf | 20 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate as on March 2024.pdf | 13 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 - Garden Estate as on 31-03-2024.pdf | 13 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate as on Dec 2023.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: Final Form 3 - Garden Estate as on 31-12-2023.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Garden Estate as on September 2023 - Form 2.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 Garden Estate 30-09-2023.pdf | 18 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Garden Estate FY 22-23.pdf | 25 Sep 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Garden Estate as on June 2023.pdf | 12 Sep 2023 |
| Certificates of CA (Form 3)File: Form 3- Garden Estate as on 30-06-2023.pdf | 12 Sep 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Adobe Scan 06-Jun-2023 (2) (1).pdf | 26 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: de con consultant .pdf | 26 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: maharera garden estate.pdf | 26 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019_2020.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020_2021.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021_2022.pdf | 5 Jun 2023 |
| Declaration in FORM BFile: ReraEasy Affidavit 02062023.pdf | 3 Jun 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 07-11-2022.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 December 2022.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2022.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2021.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2022.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2023.pdf | 30 May 2023 |
| Certificates of CA (Form 3)File: Form 3 March 2023_compressed.pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 17-18.pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 18-19.pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 30 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf | 30 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Garden Estate as on September 2022.pdf | 24 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Garden Estate as on December 2022.pdf | 24 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Garden Estate as on March 2023.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3- Garden Estate as on September 2022.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3- Garden Estate as on December 2022.pdf | 24 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3- Garden Estate as on March 2023.pdf | 24 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Garden Estate (2).pdf | 6 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Garden Estate.pdf | 8 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Garden Estate Form 2A (2019-20).pdf | 3 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Garden Estate FY 2021-22.pdf | 31 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 298.pdf | 12 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate - March 2022.pdf | 10 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Garden Estate - June 2022.pdf | 10 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 Garden Estate- March 2022.pdf | 10 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 Garden Estate- June 2022.pdf | 10 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Garden Estate - 31st March 2021.pdf | 18 May 2022 |
| Certificates of CA (Form 3)File: Form 3 Garden Estate 31st March 2021 - Copy.pdf | 18 May 2022 |
| Declaration about Commencement CertificateFile: Circular 32 Garden Esatate.pdf | 7 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Garden Estate.pdf | 7 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: Circular 29 Garden Estate.pdf | 7 Dec 2021 |
| CERSAI detailsFile: Garden Estate.pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Garden Estate FY 2017-18.pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Garden Estate FY 2018-19.pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Garden Estate FY 2019-20.pdf | 7 Dec 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Garden Estate FY 2020-21.pdf | 7 Dec 2021 |
| Building plan approvalFile: CC REDUCED.pdf | 27 Aug 2017 |
| Building Plan Approval (IOD)File: CC REDUCED.pdf | 27 Aug 2017 |
| Declaration in FORM BFile: SBD.pdf | 27 Aug 2017 |
| Layout approvalFile: PLAN LAYOUT 1 REDUCED.pdf | 25 Aug 2017 |
| Layout approvalFile: PLAN LAYOUT 2.pdf | 25 Aug 2017 |
| PAN CardFile: PAN OF FIRM SBD_5.pdf | 25 Aug 2017 |
| Copy of the legal title reportFile: Title certificate20082017140634.pdf | 25 Aug 2017 |
| Details of encumbrancesFile: ENCUMBRANCE LETTER20082017152017.pdf | 25 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT 1 REDUCED.pdf | 25 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT 2.pdf | 25 Aug 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 25 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate25082017174710.pdf | 25 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg certificate25082017173038.pdf | 25 Aug 2017 |
| Certificates of CA (Form 3)File: ca certificate25082017172740.pdf | 25 Aug 2017 |
| Proforma of Allotment letterFile: draft allotment letter25082017191204.pdf | 25 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 21 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep GARDEN ESTATE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mauje Mohane7,600+ in Thane
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
Godrej Riviera Phase 1
GODREJ PROPERTIES LIMITED
MOHANKHEDA GARDENS
MOHANKHEDA HERITAGE
Ramrajya - Neptune Ekansh D
Neptune Developers Limited
Ramrajya - Neptune Jal Tarang D
Neptune Developers Limited
Ramrajya - Neptune Jal Tarang E
Neptune Developers Limited
Ramrajya - Neptune Udaan B
Neptune Developers Limited
See every Thane project, with the district possession charts
Builder: SHREE BALAJI DEVELOPERS
SHREE BALAJI DEVELOPERS has 22 registrations on MahaRERA, including SHREE RESIDENCY and PNT SQUARE. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that GARDEN ESTATE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GARDEN ESTATE is delayed beyond 28 Nov 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GARDEN ESTATE?
The registered promoter entity is SHREE BALAJI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GARDEN ESTATE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GARDEN ESTATE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for GARDEN ESTATE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in GARDEN ESTATE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback