ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / GARDEN COURT-D WING

Registered Litigation declared Residential / Group Housing project

GARDEN COURT-D WING

By RITU DEVELOPERS

RG-MH-06035 · RERA P51700051586 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
62 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

GARDEN COURT-D WING is a Residential / Group Housing project by RITU DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700051586 on 27 Jun 2023. Possession is promised by 31 Mar 2028. 2 of the 64 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameGARDEN COURT-D WING
  • TypeResidential / Group Housing
  • Location
    • NA
    • BHAYANDAR
    • Thane
    • 401101
  • Pincode401101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051586
  • ReraGenie IDRG-MH-06035

Builder

  • NameRITU DEVELOPERS
  • Entity typePartnership
  • PartnersRAJARAM NEKARAM BHATI, BHAVESH MAHENDRA SHETH, GIRISH JAGANNATH PRADHAN HUF
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed69 files

Current status

3%2 of 64 units booked
22.0%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GARDEN COURT D WINGNA171664064

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

GARDEN COURT D WING: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered30
Open Space136

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,916 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
VIRENDRA CHANDRAKANT SHAH HUFBHAYANDARThane
DHIMANT CHANDRAKANT SHAH HUFBHAYANDARThane
HEMANT CHANDRAKANT SHAH HUFBHAYANDARThane
PRASHANT CHANDRAKANT SHAH HUFBHAYANDARThane
PRAMOD GAURI SHANKAR TODIBhandarliThane
SANDEEP GAURI SHANKAR TODIBHAYANDARThane
PRAMILA RAJENDRA LOHIYABHAYANDARThane
MAMTA ANIL JAJODIYABhandarliThane
VIJAY GAURI SHANKAR TODIBHAYANDARThane

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI5924.72
Proposed, not sanctioned5,925 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHAYANDAR WEST
Estimated costRs 25.00 cr
Cost incurredRs 5.50 cr
Work done22.0%
BuildingWingEstimatedIncurred
GARDEN COURT D WINGNARs 24.50 crRs 5.50 cr
-NARs 50.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR GIRSH PRADHAN
EngineerRAJESH DUBEY
Chartered AccountantR D LUKAD
PartnerRole in project
RITU DEVELOPERS-

Litigation declared1

CaseCourtStatus
RC5/0000749/2022/2022Fourth Joint Civil Judge Senior Division And Addl CJM ThaneNext Hearing In September

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf7 May 2026
Withdrawal Update Form 2File: FORM 2.pdf7 May 2026
Withdrawal Update Form 3File: FORM 3.pdf7 May 2026
Withdrawal Update Form 1File: FORM 1_0001.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2_0001.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3_0001.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Withdrawal Update Form 3File: Form 3.pdf25 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_0001.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD RITU DEVELOPERS.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf11 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_0001_3.pdf11 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RITU DEVELOPERS PHASE 2 QA MARCH 24 PDF.pdf17 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PDF_0001.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Icici Rera Acc confirmation.pdf17 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Icici Rera Acc confirmation.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf2 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_0001.pdf2 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_0001.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_0001.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_0001.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD PDF_0001.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_0001.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RD Form 3_0001.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate- FORM 1.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineers Certificate 10102023_0001.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 (16-10-2023).pdf16 Oct 2023
Other - TechnicalFile: LETTER_compressed.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA Certificate for Rera with sign_ new_compressed.pdf7 Jun 2023
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: INDIVIDUAL DISCLOSURE Bhavesh Sheth.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: INDIVIDUAL DISCLOSURE Girish Pradan.pdf5 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: INDIVIDUAL DISCLOSURE Rajaram bhati.pdf5 Jun 2023
Layout approvalFile: 5 Copy of Layout Approval.pdf3 Jun 2023
Building plan approvalFile: 6 Building Plan Approva.pdf3 Jun 2023
PAN CardFile: 1 PAN CARD.pdf3 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUM FINANCE.pdf3 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUM LEGAL.pdf3 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUM FINANCE.pdf3 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUM LEGAL.pdf3 Jun 2023
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval.pdf3 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approva.pdf3 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates.pdf3 Jun 2023
Declaration about Commencement CertificateFile: CC DECLARATION.pdf3 Jun 2023
Declaration in FORM BFile: FORM B .pdf3 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf3 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf3 Jun 2023
CERSAI detailsFile: CERSAI.pdf3 Jun 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf3 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf3 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC .pdf3 Jun 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT DEVIATION.pdf3 Jun 2023
Deviation Report with respect to model copy of AgreementFile: AGREEMENT DEVIATION.pdf3 Jun 2023

How this compares with Thane

3%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GARDEN COURT-D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA7,600+ in Thane

2 kmGARDEN COURT-D WINGCompleted 24Lapsed / revoked 20Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 89 registered projects within 2 km.

Builder: RITU DEVELOPERS

RITU DEVELOPERS has 2 registrations on MahaRERA, including RUDRAA RESIDENCY and GARDEN COURT-D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GARDEN COURT-D WING is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GARDEN COURT-D WING?

The registered promoter entity is RITU DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GARDEN COURT-D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GARDEN COURT-D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GARDEN COURT-D WING?

The professionals named in the filing: Architect: AR GIRSH PRADHAN; Engineer: RAJESH DUBEY; Chartered Accountant: R D LUKAD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GARDEN COURT-D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GARDEN COURT-D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GARDEN COURT-D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.