Home / Browse projects / Raigarh, Maharashtra / Ganushet Keni Heritage

De-registered No litigation declared Others project

Ganushet Keni Heritage

By Dinesh Manohar Keni

RG-MH-30553 · RERA P52000030785 · Last updated on MahaRERA portal: 13 Aug 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Ganushet Keni Heritage is a Others project by Dinesh Manohar Keni in Raigarh, Maharashtra, registered with MahaRERA as P52000030785 on 13 Sep 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameGanushet Keni Heritage
  • TypeOthers
  • Location
    • Sector -24
    • Taloja Panchnand
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • RERA no.P52000030785
  • ReraGenie IDRG-MH-30553

Builder

  • NameDinesh Manohar Keni
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredSep 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on13 Sep 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA00000
1NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Haresh Manohar KeniTaloje Panchnad Raigarh
Lilabai Manohar KeniTaloje Panchnad Raigarh
Lalita Eknath PatilNavadeRaigarh

Approvals and building plan

Permissible FSI5879.0
Proposed, not sanctioned3,148 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSector - 14, Taloja MH, Panvel - 410208

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerAG Gokhale & Associates
PartnerRole in project
Dinesh Manohar Keni-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganushet Keni Heritage as on June 2024.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june 24.pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june 24.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf12 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate june 24 (1).pdf12 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2021.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2021.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2021.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2021.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2022.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2022.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2022.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2023.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 2023.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 24.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganushet Keni Heritage as on 30th Sep 2021.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganushet Keni Heritage as on 31st Dec 2021.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 21.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2022.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ganushet Keni Heritage Form 3 as on 30th Sep 2021.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate sept 2021.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 2021.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2022.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2022_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2022_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2022_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2023_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 2023_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023_compressed.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2024.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 19-24-TALOJA RERA_compressed.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 of Ganushet Keni Heritage FY 2021-22.pdf30 Sep 2022
OtherFile: Declaration for De-Registration of Project - Ganushet Keni_compressed.pdf12 May 2022
Layout approvalFile: IOD PLAN 19.pdf25 Aug 2021
Building plan approvalFile: IOD PLAN 19.pdf25 Aug 2021
PAN CardFile: PANCARD.pdf25 Aug 2021
Copy of the legal title reportFile: Title-MahaRERA_Keni.pdf25 Aug 2021
Details of encumbrancesFile: Encumbrance Dinesh Keni.pdf25 Aug 2021
Copy of Layout Approval (in case of layout)File: IOD PLAN 19.pdf25 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD PLAN 19.pdf25 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 19.pdf25 Aug 2021
Declaration about Commencement CertificateFile: CC Declaration Dinesh Keni.pdf25 Aug 2021
Declaration in FORM BFile: Form B Promoter Dinesh Keni .pdf25 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GANUSHETH KENI HERITAGE-1-2.pdf25 Aug 2021
Proforma of Allotment letterFile: ATS.pdf25 Aug 2021
Proforma of Allotment letterFile: Allotment Letter.pdf25 Aug 2021

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ganushet Keni Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Taloja Panchnand5,900+ in Raigarh

Builder: Dinesh Manohar Keni

Dinesh Manohar Keni has 2 registrations on MahaRERA, including Ganushet Keni Heritage and Ganushet Keni Heritage. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that Ganushet Keni Heritage shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Ganushet Keni Heritage is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganushet Keni Heritage?

The registered promoter entity is Dinesh Manohar Keni, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganushet Keni Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ganushet Keni Heritage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganushet Keni Heritage?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: AG Gokhale & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganushet Keni Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganushet Keni Heritage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganushet Keni Heritage to a free account