ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Ganushet Keni Heritage

Registered No litigation declared Others project

Ganushet Keni Heritage

By Dinesh Manohar Keni

RG-MH-96007 · RERA P52000034093 · Last updated on MahaRERA portal: 3 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Staircases, 95%
31 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

Ganushet Keni Heritage is a Others project by Dinesh Manohar Keni in Raigarh, Maharashtra, registered with MahaRERA as P52000034093 on 24 Mar 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 51 of the 82 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameGanushet Keni Heritage
  • TypeOthers
  • Location
    • Sector -24
    • Taloja
    • Taloje Panchnad
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000034093
  • ReraGenie IDRG-MH-96007

Builder

  • NameDinesh Manohar Keni
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2022First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Mar 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed130 files

Current status

62%51 of 82 units booked
67.6%Work done, per cost certificate

Figures as on 3 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Ganushet Keni HeritageNA2321721082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Ganushet Keni Heritage: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)60%
Plinth100%
Stilt Floor70%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.88%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.39%

Progress on shared amenities15

As on 3 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered73

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI3149.45
Proposed, not sanctioned3,148 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMadhuraaj Bhimashankar Shop No 1 Plot No 13 Sector 19 Taloja Panchanand Phase 1 Mumbai 410208
Estimated costRs 18.00 cr
Cost incurredRs 12.17 cr
Work done67.63%
BuildingWingEstimatedIncurred
Ganushet Keni HeritageNARs 17.10 crRs 11.56 cr
-NARs 90.00 lakhRs 60.87 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerSK Consultants & Engineers
Chartered AccountantNB Sayed & Associates
Chartered AccountantVikas Abhang & Associates
PartnerRole in project
Dinesh Manohar Keni-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30032620439Jun 2026 → Jun 2027

Reason as filed by the promoterWe, Dinesh Manohar Keni, the promoter of the project Ganushet Keni Heritage (Registration No. P52000034093) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. The delay occurred due to procurement issues, financial constraints, and site-related challenges. In addition, adverse weather conditions, particularly rainfall, delayed the plaster work, which subsequently impacted the progress of other related works. Despite these challenges, we are actively

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Ganushet Keni Heritage as on June 2026.pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 - Ganushet Keni Heritage as on June 2026.pdf3 Aug 2026
Withdrawal Update Form 3File: Form 3 - Ganushet Keni Heritage as on June 2026.pdf3 Aug 2026
Form 5 (FY 2024-2025)File: Form 5 Ganushet Keni Heritage FY 2024-25.pdf6 Jun 2026
Withdrawal Update Form 1File: Form 1 - Ganushet Keni Heritage as on March 2026.pdf6 May 2026
Withdrawal Update Form 2File: Form 2 - Ganushet Keni Heritage as on March 2026.pdf6 May 2026
Withdrawal Update Form 3File: Form 3 - Ganushet Keni Heritage as on March 2026.pdf6 May 2026
Layout approvalFile: Plan dated 25-02-2020 (1)-1.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-2.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-3.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-4.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-5.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-6.pdf11 Apr 2026
Building plan approvalFile: Plan dated 25-02-2020 (1)-7.pdf11 Apr 2026
Withdrawal Update Form 1File: Form 1 - Ganushet Keni Heritage as on Dec 2025.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2 - Ganushet Keni Heritage as on Dec 2025.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 - Ganushet Keni Heritage as on Dec 2025.pdf17 Jan 2026
Form 1File: Form 1 - Ganushet Keni Heritage as on Sep 2025.pdf13 Oct 2025
Form 2File: Form 2 - Ganushet Keni Heritage as on Sep 2025.pdf13 Oct 2025
Form 3File: Form 3 - Ganushet Keni Heritage as on Sep 2025.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Ganushet Keni Heritage as on Sep 2025.pdf13 Oct 2025
Form 1File: Form 1 - Ganushet keni Heritage as on March 2025.pdf4 Sep 2025
Form 2File: Form 2 - Ganushet Keni Heritage as on March 2025.pdf4 Sep 2025
Form 3File: Form 3 - Ganushet Keni Heritage as on March 2025.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Ganushet Keni Heritage as on March 2025.pdf4 Sep 2025
Form 1File: Form 1 - Ganushet Keni Heritage as on June 2025.pdf18 Jul 2025
Form 2File: Form 2 - Ganushet Keni Heritage as on June 2025.pdf18 Jul 2025
Form 3File: Form 3 - Ganushet Keni Heritage as on June 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Ganushet Keni Heritage as on June 2025.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganushet keni Heritage as on March 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 of Ganushet Keni Heritage as on 31-12-2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganushet Keni Heritage as on Dec 2024.pdf13 Jan 2025
Details of encumbrancesFile: Encumbrance letter - Ganushet Keni Heritage.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sept 24.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 of Ganushet Keni as on 30-06-2024_compressed.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganushet Keni Heritage as on June 2024.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganushet Keni Heritage as on Sept 2024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganushet Keni Heritage as on Sept 2024.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Ganushet Keni Heritage FY 2023-24.pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june 24.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 20 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ggggggggg.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganushet Keni Heritage as on June 2024.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - Ganushet Keni Heritage as on March 2024.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2021.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2021.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2021.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2021.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2022.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2022.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2022.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 2023.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 2023.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 2023.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 24.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2022.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 2022.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2022.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2022.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2023.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2022.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2022.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2022.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2022.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2022.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2024.pdf24 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf24 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf24 Apr 2024

How this compares with Raigarh

62%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ganushet Keni Heritage on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Taloja5,900+ in Raigarh

2 kmGanushet Keni HeritageCompleted 66Lapsed / revoked 16Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 156 registered projects within 2 km.

Builder: Dinesh Manohar Keni

Dinesh Manohar Keni has 2 registrations on MahaRERA, including Ganushet Keni Heritage and Ganushet Keni Heritage. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Ganushet Keni Heritage is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ganushet Keni Heritage?

The registered promoter entity is Dinesh Manohar Keni, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ganushet Keni Heritage?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ganushet Keni Heritage?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ganushet Keni Heritage?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Vikas Abhang & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ganushet Keni Heritage?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ganushet Keni Heritage. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ganushet Keni Heritage to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.