ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / GANGA SHANKAR HEIGHTS

Registered No litigation declared Others project

GANGA SHANKAR HEIGHTS

By Vikrant Anil Turekar

RG-MH-29737 · RERA P52000029379 · Last updated on MahaRERA portal: 18 Nov 2026

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 40 months, 4 of them under MahaRERA's automatic 4-month extension
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 40 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 82%
38 of 45Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

GANGA SHANKAR HEIGHTS is a Others project by Vikrant Anil Turekar in Raigarh, Maharashtra, registered with MahaRERA as P52000029379 on 29 May 2021. Possession is promised by 30 Jan 2027. The completion date has moved by 40 months from the original filing, 4 of them under MahaRERA's automatic 4-month extension for the West Asia conflict. 7 of the 45 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGANGA SHANKAR HEIGHTS
  • TypeOthers
  • Location
    • Sector -R4
    • Pushpak New
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000029379
  • ReraGenie IDRG-MH-29737

Builder

  • NameVikrant Anil Turekar
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2021First promiseSep 2023Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2021
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 30 Sep 2023)
  • Buildings1 building record
  • Documents filed58 files

Current status

16%7 of 45 units booked
95.0%Work done, per cost certificate

Figures as on 18 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANGA SHANKAR HEIGHTSNA8840545

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 82%.

GANGA SHANKAR HEIGHTS: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.72%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.23%

Progress on shared amenities15

As on 18 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area670 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Shri Bama Shankar PatilKolhi koparRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI1003.63
Proposed, not sanctioned1,004 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch19A, Suyog Arcade, B Wing Plot No -279 Sector -23 Juinagar
Estimated costRs 4.40 cr
Cost incurredRs 4.18 cr
Work done95.0%
BuildingWingEstimatedIncurred
GANGA SHANKAR HEIGHTSNARs 4.40 crRs 4.18 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerB S SUKHTANKAR
EngineerNoor Mohammed
EngineerKOMAL PAWAR
Chartered AccountantRUTUJA NARSINGH & ASSOCIATES
Chartered AccountantKONAKANCHI & ASSOCIATES
Chartered AccountantMs K HEMANT & CO
Chartered AccountantCA Manish Kumar
Chartered AccountantMs. S A A N & CO
PartnerRole in project
Vikrant Anil Turekar-

Extensions3

A revised date filed with the regulator does not change the possession date in your agreement for sale. Commentary on the order notes that a buyer's right to interest for delay under section 18 of RERA may still stand; that question has not been tested.

MahaRERA order of 7 Aug 2026Sep 2026 → Jan 2027

Granted by MahaRERA, not applied for by the promoterMahaRERA's order of 7 August 2026 extended the completion date of eligible registered projects by four months, treating the West Asia conflict as force majeure. Promoters did not have to apply for it.

EXT52000018869Sep 2023 → Sep 2024

Reason as filed by the promoterWe are under process of completion of our project we need extension till 29 sep 2024

EXT52000027200Sep 2023 → Sep 2026

Reason as filed by the promoterWe have mentioned in details why we delay our project and how we can complete our project till 30-09-2026

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12606384Uttam Bhagoji HaradeVikrant Anil Turekar01/10/2026
CC12605917RAJENDRA KASHINATH PATILVikrant Anil Turekar11/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf18 Nov 2026
Form 5 (FY 2023-2024)File: FORM 5 VIKRANT SIGNED.pdf18 Nov 2026
Form 5 (FY 2024-2025)File: FORM 5 GANGA HEIGHTS 24-25.pdf18 Nov 2026
Form 5 (FY 2025-2026)File: FORM 5 GANGA HEIGHTS 25-26.pdf18 Nov 2026
Withdrawal Update Form 1File: Form 1 30-09-2026 1.pdf17 Nov 2026
Withdrawal Update Form 2File: Form 2 30-09-2026.pdf17 Nov 2026
Withdrawal Update Form 3File: Form 3 Ganga Shankar Heights 30-09-2026.pdf17 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 1File: FORM 1.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 2File: FORM 2.pdf14 Nov 2026
Withdrawal Update Form 3File: Form 3 converted.pdf14 Nov 2026
Withdrawal Update Form 3File: Form 3 converted.pdf14 Nov 2026
Withdrawal Update Form 3File: Form 3 converted.pdf14 Nov 2026
Withdrawal Update Form 3File: FORM 3.pdf14 Nov 2026
Withdrawal Update Form 3File: FORM 3.pdf14 Nov 2026
Withdrawal Update Form 3File: FORM 3.pdf14 Nov 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf1 Oct 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf1 Oct 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf1 Oct 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE and LEGAL.pdf21 Jan 2024
Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE and LEGAL.pdf21 Jan 2024
Declaration about Commencement CertificateFile: declaration about comm cert.pdf21 Jan 2024
Declaration in FORM BFile: Form B.pdf21 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf21 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf21 Jan 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf21 Jan 2024
CERSAI detailsFile: CERSAI Search Report.pdf21 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest in other real estate organization.pdf21 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf21 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf21 Jan 2024
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf21 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla_1.pdf21 Jan 2024
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf21 Jan 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf21 Jan 2024
Declaration in FORM BFile: FORM B PROMOTER VIKRANT NOTARISED.pdf9 Apr 2021
Copy of the legal title reportFile: Title_Ganga Shankar Heights_Revised.pdf6 Apr 2021
Proforma of Allotment letterFile: agreement for Sale_Ganga Shankar Heights.pdf6 Apr 2021
Proforma of Allotment letterFile: Allotment letter_Ganga Shankar Heights.pdf6 Apr 2021
Layout approvalFile: plan 213.pdf3 Apr 2021
Building plan approvalFile: plan 213.pdf3 Apr 2021
PAN CardFile: vikrant pan card.pdf3 Apr 2021
Details of encumbrancesFile: encumbrance vikrant .pdf3 Apr 2021
Copy of Layout Approval (in case of layout)File: plan 213.pdf3 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: plan 213.pdf3 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: cc 213.pdf3 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GANGA SHANKAR HEIGHTS.pdf3 Apr 2021

How this compares with Raigarh

16%of this project is bookeddistrict median 28%
21%of Raigarh projects moved their completion datethis one moved by 40 months
25%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANGA SHANKAR HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pushpak New5,900+ in Raigarh

Builder: Vikrant Anil Turekar

Vikrant Anil Turekar has 2 registrations on MahaRERA, including SHREE VILLA and GANGA SHANKAR HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GANGA SHANKAR HEIGHTS is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANGA SHANKAR HEIGHTS?

The registered promoter entity is Vikrant Anil Turekar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANGA SHANKAR HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GANGA SHANKAR HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GANGA SHANKAR HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANGA SHANKAR HEIGHTS?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: B S SUKHTANKAR; Engineer: Noor Mohammed; Engineer: KOMAL PAWAR; Chartered Accountant: RUTUJA NARSINGH & ASSOCIATES; Chartered Accountant: KONAKANCHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANGA SHANKAR HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANGA SHANKAR HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANGA SHANKAR HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.