Ganeshwadi CHS LTD - S.R.A
RG-MH-86111 · RERA P51800010062 · Last updated on MahaRERA portal: 31 Jul 2017
Source: official MahaRERA filing
Red flags
- Registration revoked
- Possession 34 months past the filed date
- 79 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ganeshwadi CHS LTD - S.R.A is a Residential / Group Housing project by Ashok Rajaram Gupta in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010062 on 23 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 79 complaints are on record with the regulator.
At a glance
Project
- NameGaneshwadi CHS LTD - S.R.A
- TypeResidential / Group Housing
- Location
- R.B kadam marg
- Bhatwadi
- Kurla
- Mumbai Suburban
- 400084
- Pincode400084
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010062
- ReraGenie IDRG-MH-86111
Builder
- NameAshok Rajaram Gupta
- Entity typeIndividual
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration revoked
- Registered on23 Aug 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings5 building records
- Documents filed13 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E | NA | 14 | 0 | 0 | 0 | 0 |
| A | NA | 16 | 0 | 0 | 0 | 0 |
| B | NA | 16 | 0 | 0 | 0 | 0 |
| C | NA | 16 | 0 | 0 | 0 | 0 |
| D | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 31 Jul 2017, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Basement (if any), at 25%.
E14%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 25% |
| Podiums (if any) | 0% |
| Plinth | 25% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 31 Jul 2017, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed175
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| E | 12 | 6 | 18 |
| A | 35 | 5 | 40 |
| B | 33 | 5 | 38 |
| C | 34 | 5 | 39 |
| D | 35 | 5 | 40 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dot Architects |
| Engineer | CSE Consultant |
| Partner | Role in project |
|---|---|
| Ashok Rajaram Gupta | - |
Complaints filed with MahaRERA79
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000012333 | Avinash Vishnu Nalawade | Ashok Gupta | 10/02/2020 |
| CC006000000012336 | Neelesh Pansare | Ashok Rajaram Gupta | 12/12/2017 |
| CC006000000012643 | Mrs Jyoti Ashish Deshmukh | Ashok Rajaram Gupta | 06/01/2018 |
| CC006000000044001 | Pravin Pachpute | Ankita Builders and Developers (Ashok Gupta) | 29/03/2019 |
| CC006000000078883 | BALU BHAGUJI KANE | Ankita Builders and Developers | 16/04/2019 |
| CC006000000089707 | Anandkumar Machindranath Borhade and Renuka AnandKumar Borhade | Ankita Builders and Developers | 14/06/2019 |
| CC006000000120987 | Suresh B Pevekar | Ankita Builders and Developers | 15/10/2019 |
| CC006000000171498 | Vijay Pandurang Pawar | Ankita Builders and Developers | 12/11/2019 |
| CC006000000171590 | Anoop K Gupta | Ankita Builders and Developers | 21/11/2019 |
| CC006000000054848 | VIJAY BABAN KANSE | ANKITA BUILDERS AND DEVELOPERS | 14/06/2018 |
| CC006000000058070 | Chaudhary B. Gupta and Nirmala Gupta | Mr. Ashok Gupta of Ankita Builder and Developers | 16/02/2019 |
| CC006000000078262 | SHANTARAM TUKARAM GAVHANE | ASHOK RAJARAM GUPTA | 26/02/2019 |
| CC006000000078263 | SATISH MAHADEV AVHAD | ASHOK RAJARAM GUPTA | 26/02/2019 |
| CC006000000078586 | Rajesh Chaturvedi | Ankita Builders & Developers | 07/04/2019 |
| CC006000000078795 | Sanjay Ghanshyam Chaubey | Ankita Builders and Developers | 07/04/2019 |
| CC006000000079065 | Sudha Rajesh Chaturvedi | M/s Ankit abuilders & Developers | 27/04/2019 |
| CC006000000079075 | Sheela B. Tiwari | M/s Ankita Builders & Developers | 02/06/2019 |
| CC006000000079157 | NANJI DEVRAJ PATEL | ANKITA BUILDERS AND DEVELOPERS | 04/05/2019 |
| CC006000000090126 | GAYATRI MAHAPATRO | ASHOK RAJARAM GUPTA | 14/07/2019 |
| CC006000000090096 | Mr Ghevarchand Madaji Ghansi | M/s Ankita Builders & Developers | 05/08/2019 |
| CC006000000090100 | MR NARAN BHANUSHALI | M/s Ankita Builders & Developers | 05/08/2019 |
| CC006000000090103 | Mrs Lilavati Dayalbhai Bhanushali | M/s Ankita Builders & Developers | 05/08/2019 |
| CC006000000090105 | Mrs Harbai Naran Bhanushali | M/s Ankita Builders & Developers | 05/08/2019 |
| CC006000000100444 | Vinaya G. Padwal | Ashok Rajaram Gupta | 06/08/2019 |
| CC006000000100473 | Manisha Ganyansing Padwal | Ashok Gupta / Ankita Builders and Developers | 09/08/2019 |
| CC006000000100475 | Dallusingh Fakira Chopaday | Ashok Rajaram Gupta | 09/08/2019 |
| CC006000000171515 | Shailaja J Sadvilkar & Pooja J Sadvilkar | Ankita Builders & Developers | 12/11/2019 |
| CC006000000171516 | Sujit K Gupta | Ankita Builders & Developers | 12/11/2019 |
| CC006000000171582 | Sambhaji Damu Korde | MR.ASHOK RAJARAM GUPTA | 20/11/2019 |
| CC006000000171676 | Manish Kumar Gupta & Neelam M Gupta | Ankita Builders & Developers | 26/11/2019 |
| CC006000000171711 | VAISHNAVI VASANTH PAI & VASANTH PADMANABH PAI | ANKITA BUILDERS AND DEVELOPERS | 29/11/2019 |
| CC006000000171840 | Sharad Mohanlal Gupta | ANKITA BUILDERS & DEVELOPERS | 12/12/2019 |
| CC006000000196808 | Sadhna Singh | Ankita Builders & Developers | 22/04/2022 |
| CC006000000192127 | SWATI VIJAY PANSARE | MR ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 10/01/2020 |
| CC006000000192143 | SARITA PRASAD BHOIR | ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 13/01/2020 |
| CC006000000192163 | MR. BABAN DAGDU AWATE | ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVLOPERS | 13/01/2020 |
| CC006000000192164 | MR. MAHADEO KRISHNA GOPALE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 13/01/2020 |
| CC006000000192166 | MRS SHUBHRA SANTOSH LOKHANDE | MR ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 14/01/2020 |
| CC006000000192167 | YOGIRAJ ASHOK NAVALE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192169 | MR SUNIL CHANDRAKANT AUTI | MR ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192177 | MR BHASKAR NARAYAN JADHAV | MR ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192179 | MR. HANUMANT DHONDIBA AWATE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 14/01/2020 |
| CC006000000192180 | MR. NILESH PANDURANG PANSARE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192182 | MR. SAMEER EKNATH PALANDE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192185 | MR. SANDIP KHANDU SHINDE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 14/01/2020 |
| CC006000000192186 | MRS MANISHA ARVIND KAD | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 14/01/2020 |
| CC006000000192189 | MRS SWATI VIJAY PANSARE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 14/01/2020 |
| CC006000000192190 | MR. VIJAY BANDU PANSARE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 14/01/2020 |
| CC006000000192847 | MR. SHANTARAM BALU WALUNJ | MR ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS & DEVELOPERS | 04/03/2020 |
| CC006000000192848 | MR. SANJAY SHANKAR KURKUTE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192849 | MR. RAJESH BHASKAR ANDHALE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192851 | MR. PRAKASH JAYRAM RASAL | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192852 | MR. HARIBHAU KARBHARI BICHARE | MR. ASHOK RAJARAM GUPTA PROP. OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192853 | MR. SAMEER EKNATH PALANDE | MR. ASHOK RAJARAM GUPTA PROP. OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192854 | MR. DAGADU ABAJI PAWADE | MR.ASHOK RAJARAM GUPTA PROP. OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192857 | MR. BHUSHAN BALU KAMATHE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192858 | MR. SACHIN GANGARAM RASAL | MR. ASHOK RAJARAM GUPTA PROP. OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192870 | SHAKUNTALA K. KURKUTE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192871 | MR. SUDHIR NARAYAN MORE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
| CC006000000192872 | SWAPNIL ASHOK NAVALE | MR. ASHOK RAJARAM GUPTA PROP OF M/S. ANKITA BUILDERS AND DEVELOPERS | 04/03/2020 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed13
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrancesFile: Encumbrances.pdf | 31 Jul 2017 |
| Declaration in FORM BFile: Declaration of FORM B.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineer.pdf | 31 Jul 2017 |
| Certificates of CA (Form 3)File: Form 3.pdf | 31 Jul 2017 |
| Building plan approvalFile: IOD.pdf | 30 Jul 2017 |
| Layout approvalFile: Layout Plan.pdf | 30 Jul 2017 |
| PAN CardFile: Pan card-compressed.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: Legal Title Certificate Report.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 30 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Draft Copy of Reservation (Allotment) Letter.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 13 filed documents as one ZIP, foldered, with a manifest
Keep Ganeshwadi CHS LTD - S.R.A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhatwadi6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 272 registered projects within 2 km.
Neumec Srushti
NEUMEC ESTATE DEVELOPER LLP
ANUSAYA
Satre Infrastructure Pvt. Ltd.
RAJANIGANDHA COTTAGE CO-OPERATIVE HOUSING SOCI
JYOTI REAL-TECH PRIVATE LIMITED
CHINTAMANI GLORY
CHINTAMANI REALTY
INDUS
Satre Infrastructure Pvt. Ltd.
JANHAVI ENCLAVE
JANHAVI HOUSING DEVELOPERS PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: Ashok Rajaram Gupta
Ashok Rajaram Gupta has 2 registrations on MahaRERA, including Ganeshwadi CHS LTD - S.R.A and Gandhi Niwas CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Ganeshwadi CHS LTD - S.R.A shows as registration revoked on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Ganeshwadi CHS LTD - S.R.A is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ganeshwadi CHS LTD - S.R.A?
The registered promoter entity is Ashok Rajaram Gupta, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ganeshwadi CHS LTD - S.R.A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Ganeshwadi CHS LTD - S.R.A?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Ganeshwadi CHS LTD - S.R.A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ganeshwadi CHS LTD - S.R.A?
The professionals named in the filing: Architect: Dot Architects; Engineer: CSE Consultant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ganeshwadi CHS LTD - S.R.A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback