Home / Browse projects / Raigarh, Maharashtra / GANESH PARK
GANESH PARK
By Ganaraj Builders & Developers
RG-MH-27877 · RERA P52000024418 · Last updated on MahaRERA portal: 15 May 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GANESH PARK is a Residential / Group Housing project by Ganaraj Builders & Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000024418 on 12 Feb 2020. The registration is recorded completed; possession was promised by 31 Mar 2025. The completion date has moved by 27 months from the original filing.
At a glance
Project
- NameGANESH PARK
- TypeResidential / Group Housing
- Location
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000024418
- ReraGenie IDRG-MH-27877
Builder
- NameGanaraj Builders & Developers
- Entity typePartnership
- PartnersPrashant Ramnath Gaikwad, Sujit Sangram Gulve
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on12 Feb 2020
- Promised completion31 Mar 2025
- Revised completionRevised to 31 Mar 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed65 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GANESH PARK | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
GANESH PARK: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed5
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| GANESH PARK CO OPERATIVE HOUSING SOCIETY | Panvel | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ABRAR KHAN ARCHITECTS |
| Engineer | RAHUL SASHTE |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | RUTUJA SAJJAN NARSINGH |
| Chartered Accountant | M/s. Pratiksha Tulshyan & Associates |
| Partner | Role in project |
|---|---|
| Ganaraj Builders & Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of % allottees for purpose of extension of RERA registration period of the said project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jan 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jan 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Apr 2025
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on June 2024.pdf | 15 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on Sep 2024.pdf | 15 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on Dec 2024.pdf | 15 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on March 2024.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Feb 2025.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Dec 2024.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Sep 2024.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on June 2024.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2024.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2023.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2022.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2021.pdf | 15 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2020.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2020.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2021.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2022.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2023.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2024.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on June 2024.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Sep 2024.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Dec 2024.pdf | 15 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Feb 2025.pdf | 15 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Ganesh Park FY19-20.pdf | 15 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Ganesh Park FY21-22.pdf | 15 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - gp.pdf | 4 Apr 2025 |
| Declaration in FORM BFile: Form B -Ganesh Park.pdf | 13 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2024.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 24_11zon.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf | 13 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Ganesh Park as on 31-03-2024 (2).pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ganesh Park Form 5 FY 2021-2022 (1).pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Ganesh Park FY 2022-23.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23_11zon.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Ganesh Park FY 2023-24.pdf | 13 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_11zon.pdf | 13 Aug 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 12 Aug 2024 |
| CERSAI detailsFile: CERSAI.pdf | 12 Aug 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 12 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 12 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ganesh Park .pdf | 7 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganesh Park Sept 2021_compressed.pdf | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GANESH PARK20210928_15315149_1-2_compressed.pdf | 28 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GANESH PARK20210928_15315149_3-end_compressed.pdf | 28 Sep 2021 |
| Declaration about Commencement CertificateFile: Ganesh Park 32.pdf | 25 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganesh Park Form 1.pdf | 25 Sep 2021 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE GANRAJ BUILDERS DEVELOPERS GANESH PARK.pdf | 6 Feb 2020 |
| Proforma of Allotment letterFile: Allotment Letter GANRAJ BUILDERS DEVELOPERS GANESH PARK.pdf | 6 Feb 2020 |
| Copy of the legal title reportFile: TITLE AND SEARCH GANARAJ_compressed (1).pdf | 5 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Ganesh Park.pdf | 3 Feb 2020 |
| Layout approvalFile: SCANNED PLAN.pdf | 28 Jan 2020 |
| Building plan approvalFile: SCANNED PLAN.pdf | 28 Jan 2020 |
| PAN CardFile: pan card ganraj.pdf | 28 Jan 2020 |
| Details of encumbrancesFile: ganraj encumbrance.pdf | 28 Jan 2020 |
| Copy of Layout Approval (in case of layout)File: SCANNED PLAN.pdf | 28 Jan 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: SCANNED PLAN.pdf | 28 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: C C - Ganesh Park.pdf | 28 Jan 2020 |
| Declaration in FORM BFile: form B ganraj.pdf | 28 Jan 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 65 filed documents as one ZIP, foldered, with a manifest
Keep GANESH PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Panvel5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Ganaraj Builders & Developers
Ganaraj Builders & Developers has 1 registration on MahaRERA, including GANESH PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if GANESH PARK is delayed beyond 31 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GANESH PARK?
The registered promoter entity is Ganaraj Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GANESH PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GANESH PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GANESH PARK?
The professionals named in the filing: Architect: ABRAR KHAN ARCHITECTS; Engineer: RAHUL SASHTE; Engineer: SK Consultants & Engineers; Chartered Accountant: RUTUJA SAJJAN NARSINGH; Chartered Accountant: M/s. Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GANESH PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback