Completed No litigation declared Residential / Group Housing project

GANESH PARK

By Ganaraj Builders & Developers

RG-MH-27877 · RERA P52000024418 · Last updated on MahaRERA portal: 15 May 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

GANESH PARK is a Residential / Group Housing project by Ganaraj Builders & Developers in Raigarh, Maharashtra, registered with MahaRERA as P52000024418 on 12 Feb 2020. The registration is recorded completed; possession was promised by 31 Mar 2025. The completion date has moved by 27 months from the original filing.

At a glance

Project

  • NameGANESH PARK
  • TypeResidential / Group Housing
  • Location
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000024418
  • ReraGenie IDRG-MH-27877

Builder

  • NameGanaraj Builders & Developers
  • Entity typePartnership
  • PartnersPrashant Ramnath Gaikwad, Sujit Sangram Gulve

Key dates

this monthRegisteredFeb 2020First promiseDec 2022Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2020
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GANESH PARKNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

GANESH PARK: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed5

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots5
Closed/Covered5

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area556 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GANESH PARK CO OPERATIVE HOUSING SOCIETYPanvelRaigarh

Approvals and building plan

Permissible FSI1209.63
Proposed, not sanctioned1,210 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBALAJI BHAVAN, NEAR BHAJI MARKET, PANVEL 410 206

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectABRAR KHAN ARCHITECTS
EngineerRAHUL SASHTE
EngineerSK Consultants & Engineers
Chartered AccountantRUTUJA SAJJAN NARSINGH
Chartered AccountantM/s. Pratiksha Tulshyan & Associates
PartnerRole in project
Ganaraj Builders & Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000024597Dec 2022 → Mar 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of % allottees for purpose of extension of RERA registration period of the said project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2025

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on June 2024.pdf15 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on Sep 2024.pdf15 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on Dec 2024.pdf15 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Ganesh Park as on March 2024.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Feb 2025.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Dec 2024.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on Sep 2024.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on June 2024.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2024.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2023.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2022.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2021.pdf15 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ganesh Park as on March 2020.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2020.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2021.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2022.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2023.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2024.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on June 2024.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Sep 2024.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Dec 2024.pdf15 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on Feb 2025.pdf15 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Ganesh Park FY19-20.pdf15 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Ganesh Park FY21-22.pdf15 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - gp.pdf4 Apr 2025
Declaration in FORM BFile: Form B -Ganesh Park.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Ganesh Park as on March 2024.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 24_11zon.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Ganesh Park as on 31-03-2024 (2).pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ganesh Park Form 5 FY 2021-2022 (1).pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 of Ganesh Park FY 2022-23.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23_11zon.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Ganesh Park FY 2023-24.pdf13 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24_11zon.pdf13 Aug 2024
Declaration about Commencement CertificateFile: Format D.pdf12 Aug 2024
CERSAI detailsFile: CERSAI.pdf12 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf12 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Ganesh Park .pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ganesh Park Sept 2021_compressed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GANESH PARK20210928_15315149_1-2_compressed.pdf28 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GANESH PARK20210928_15315149_3-end_compressed.pdf28 Sep 2021
Declaration about Commencement CertificateFile: Ganesh Park 32.pdf25 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ganesh Park Form 1.pdf25 Sep 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE GANRAJ BUILDERS DEVELOPERS GANESH PARK.pdf6 Feb 2020
Proforma of Allotment letterFile: Allotment Letter GANRAJ BUILDERS DEVELOPERS GANESH PARK.pdf6 Feb 2020
Copy of the legal title reportFile: TITLE AND SEARCH GANARAJ_compressed (1).pdf5 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Ganesh Park.pdf3 Feb 2020
Layout approvalFile: SCANNED PLAN.pdf28 Jan 2020
Building plan approvalFile: SCANNED PLAN.pdf28 Jan 2020
PAN CardFile: pan card ganraj.pdf28 Jan 2020
Details of encumbrancesFile: ganraj encumbrance.pdf28 Jan 2020
Copy of Layout Approval (in case of layout)File: SCANNED PLAN.pdf28 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SCANNED PLAN.pdf28 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: C C - Ganesh Park.pdf28 Jan 2020
Declaration in FORM BFile: form B ganraj.pdf28 Jan 2020

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 27 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GANESH PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

Builder: Ganaraj Builders & Developers

Ganaraj Builders & Developers has 1 registration on MahaRERA, including GANESH PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if GANESH PARK is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GANESH PARK?

The registered promoter entity is Ganaraj Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GANESH PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GANESH PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GANESH PARK?

The professionals named in the filing: Architect: ABRAR KHAN ARCHITECTS; Engineer: RAHUL SASHTE; Engineer: SK Consultants & Engineers; Chartered Accountant: RUTUJA SAJJAN NARSINGH; Chartered Accountant: M/s. Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GANESH PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GANESH PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GANESH PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.