Gami Satyam Palacio

By Satyam Ventures Private Limited

RG-MH-18281 · RERA P52000056145 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 60%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Gami Satyam Palacio is a Others project by Satyam Ventures Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000056145 on 16 May 2024. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameGami Satyam Palacio
  • TypeOthers
  • Location
    • Sector - 2
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • RERA no.P52000056145
  • ReraGenie IDRG-MH-18281

Builder

  • NameSatyam Ventures Private Limited
  • Entity typeCompany
  • DirectorsNanji Madeva Choudhary, Mukesh Ganesh Vaid
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Wing , B Wing and C WingNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 60%.

A Wing , B Wing and C Wing: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth60%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1065

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,065
Closed/Covered304
Open Space761

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,143 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI44030.1
Proposed, not sanctioned41,030 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1/3 Hermes Centre, Palm Beach Road, Sector -17, Vashi, Thane -400705

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimension Architects Pvt Ltd
EngineerA G Gokhale and Associates
Chartered AccountantH M Shah and Associates
PartnerRole in project
Satyam Ventures Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Gami Satyam Pallacio As On Mar 2026.pdf3 Jun 2026
Form 2File: Form-2 Gami Satyam Pallacio As On Mar 2026.pdf3 Jun 2026
Form 3File: Form-3 Gami Satyam Pallacio As On Mar 2026.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf3 Jun 2026
Self-declaration of Quarterly ProgressFile: CC (2).pdf3 Jun 2026
OthersFile: Plan (4).pdf3 Jun 2026
Form 1File: FORM-1 Satyam Ventures Pvt. Ltd..pdf27 May 2026
Form 2File: Gami Satyam Pallacio Form 2 as on march 2026.pdf27 May 2026
Form 3File: Gami Satyam Pallacio Form 3 as on march 2026_compressed.pdf27 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Satyam Palacio as on march 2026.pdf27 May 2026
Form 1File: Form 1 - Gami Satyam Palacio as on June 2025.pdf13 May 2026
Form 2File: Form 2 - Gami Satyam Palacio as on June 2025.pdf13 May 2026
Form 3File: Form 3 - Gami Satyam Palacio as on June 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Satyam Palacio as on June 2025.pdf13 May 2026
Form 1File: Form 1 - Gami Satyam Palacio as on Sep 2025.pdf13 May 2026
Form 2File: Form 2 - Gami Satyam Palacio as on Sep 2025.pdf13 May 2026
Form 3File: Form 3 - Gami Satyam Palacio as on Sep 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Satyam Palacio as on Sep 2025.pdf13 May 2026
Form 1File: Form 1 - Gami Satyam Palacio as on Dec 2025.pdf13 May 2026
Form 2File: Form 2 - Gami Satyam Palacio as on Dec 2025.pdf13 May 2026
Form 3File: Form 3 - Gami Satyam Palacio as on Dec 2025.pdf13 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Gami Satyam Palacio as on Dec 2025.pdf13 May 2026
Proforma of Agreement for saleFile: AFS - Gami Satyam Palacio.pdf12 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 GAMI SATYAM PALACIO.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 GAMI SATYAM PALACIO.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 GAMI SATYAM PALACIO.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Palacio - June 2024.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Palacio - Sep 2024.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Palacio - Dec 2024.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Satyam Palacio as on June 2024_compressed.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Satyam Palacio as on September 2024_compressed.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Gami Satyam Palacio as on December 2024_compressed.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Satyam Palacio as on June 2024.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Satyam Palacio as on September 2024.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gami Satyam Palacio as on December 2024.pdf11 Apr 2025
Other - TechnicalFile: 2 Other - Technical (16).pdf13 May 2024
Layout approvalFile: plan page 1 satyam (1) (2).pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TPO(NM K)_202333_2-2.pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TPO(NM K)_202333_3-3.pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TP PG 4 (1).pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TPO PG 5.pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TPO(NM K)_202333_6-7.pdf9 May 2024
Building plan approvalFile: CIDCO_BP-18548_TPO(NM K)_202333_8-end.pdf9 May 2024
Copy of Layout Approval (in case of layout)File: plan page 1 satyam (1) (2).pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TPO(NM K)_202333_2-2.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TPO(NM K)_202333_3-3.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TP PG 4 (1).pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TPO PG 5.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TPO(NM K)_202333_6-7.pdf9 May 2024
Building Plan Approval / NA Order for plotted developmentFile: CIDCO_BP-18548_TPO(NM K)_202333_8-end.pdf9 May 2024
Other - LegalFile: AGREEMENT TO LEASE (1)-1-30.pdf9 May 2024
Other - LegalFile: AGREEMENT TO LEASE (1)-31-58.pdf9 May 2024
Other - TechnicalFile: declaration regarding commercial count.pdf9 May 2024
Copy of the legal title reportFile: Short Title_Satyam Ventures Pvt Ltd_Gami Satyam_08052024_compressed.pdf6 May 2024
Declaration in FORM BFile: Affidavit cum Declaration_0001.pdf6 May 2024
CERSAI detailsFile: ilovepdf_merged (38).pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 (41) (1).pdf6 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (35).pdf6 May 2024
Proforma of Agreement for saleFile: AFS_ Gami Satyam Palacio_Satyam Ventures Pvt Ltd_04052024.pdf6 May 2024
Proforma of Allotment letterFile: AL_Gami Satyam Palacio_Satyam Ventures Pvt Ltd_04052024.pdf6 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow6 May 2024
Deviation Report with respect to Allotment letterFile: Deviation report Allotment letter.pdf6 May 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT-AGREEMENT FOR SALE.pdf6 May 2024
Other - TechnicalFile: 1 Other - Technical (15).pdf6 May 2024
PAN CardFile: COMPANY PAN CARD.pdf4 May 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER_0001.pdf4 May 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER -Legal_0001.pdf4 May 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER_0001.pdf4 May 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER -Legal_0001.pdf4 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Copy (2).pdf4 May 2024
Declaration about Commencement CertificateFile: Commencement Certificate_0001.pdf4 May 2024

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gami Satyam Palacio on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kharghar5,900+ in Raigarh

Builder: Satyam Ventures Private Limited

Satyam Ventures Private Limited has 2 registrations on MahaRERA, including GAMI SATYAM BUSINESS AVENUE and Gami Satyam Palacio. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Gami Satyam Palacio is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gami Satyam Palacio?

The registered promoter entity is Satyam Ventures Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gami Satyam Palacio?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gami Satyam Palacio?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gami Satyam Palacio?

The professionals named in the filing: Architect: Dimension Architects Pvt Ltd; Engineer: A G Gokhale and Associates; Chartered Accountant: H M Shah and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gami Satyam Palacio?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gami Satyam Palacio. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gami Satyam Palacio to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.