Home / Browse projects / Mumbai Suburban, Maharashtra / GALA NIRVANA
GALA NIRVANA
By GALAVANCE INFRABUILD PRIVATE LIMITED
RG-MH-96018 · RERA P51800047812 · Last updated on MahaRERA portal: 22 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GALA NIRVANA is a Residential / Group Housing project by GALAVANCE INFRABUILD PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047812 on 28 Nov 2022. Possession was promised by 25 Dec 2025 and is now 10 months past that date.
At a glance
Project
- NameGALA NIRVANA
- TypeResidential / Group Housing
- Location
- KEVNIPADA AMBIVALI
- ANDHERI
- Mumbai Suburban
- 400058
- Pincode400058
- RERA no.P51800047812
- ReraGenie IDRG-MH-96018
Builder
- NameGALAVANCE INFRABUILD PRIVATE LIMITED
- Entity typeCompany
- CINU43299MH2023PTC409218
- GSTIN27AAKCG6759R1ZH
- PartnersJIGNESH KULIN GALA, YOGESH KULIN GALA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on28 Nov 2022
- Promised completion25 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIRVANA 58 | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.
NIRVANA 58: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 15% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 15% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SNEHAL TOWERS CO-OPERATIVE HOUSING SOCIETY LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHIM KHATRI |
| Engineer | EPICONS CONSULTANTS PVT LTD |
| Engineer | DONGRE PROJECT MANAGEMENT CONSULTANTS PVT LTD |
| Chartered Accountant | AKASH G SHAH & ASSOCIATES |
| Chartered Accountant | GAJARIA SHAH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GALAVANCE INFRABUILD PRIVATE LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 RERA CERTIFICATE.pdf | 22 Jan 2026 |
| Form 2File: Form 2 Cost Estimate Snehal Tower 311225.pdf | 22 Jan 2026 |
| Form 3File: FORM-3 GALAVANCE_ DEC-2025.pdf | 22 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: GIPL DISCLOSURE OF SOLD BOOKED INVENTORY 31.12.2025..pdf | 22 Jan 2026 |
| Form 1File: FORM 1.pdf | 30 Oct 2025 |
| Form 2File: Form 2 Cost Estimate 300925.pdf | 30 Oct 2025 |
| Form 3File: FORM 3 GALAVANCE.pdf | 30 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY 30092025.pdf | 30 Oct 2025 |
| Form 1File: FORM 1 GALAVANCE -JUN-25.pdf | 18 Jul 2025 |
| Form 2File: Form 2 Cost Estimate 300625.pdf | 18 Jul 2025 |
| Form 3File: FORM 3 GALAVANCE- JUNE-25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 18 Jul 2025 |
| Form 1File: FORM 1.pdf | 28 Jun 2025 |
| Form 2File: FORM 2.pdf | 28 Jun 2025 |
| Form 3File: FORM 3.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf | 28 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GALAVANCE_ ANN-A_ FORM 1 CERT.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALAVANCE_FORM-3 CA CERTIFICATE.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN-23.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP-23.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC-23.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR-24.pdf | 26 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A MAR-23.pdf | 26 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MAR-23.pdf | 26 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MAR-24.pdf | 26 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 8 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf | 8 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 301224.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 C A CERT_Dec-2024.pdf | 29 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE FORM 1.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE.pdf | 28 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 C A CERT_0001.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert 300324.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 300624.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_june-24.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024.pdf | 23 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Annexure - A Mar-24.pdf | 1 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert 300324.pdf | 1 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_0001_0001.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Annexure - A.pdf | 27 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_0001.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE SEPT-23_compressed (3).pdf | 28 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2223.pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architect Certificate of Percentage of Completion of Work.pdf | 17 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 300623.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE JUNE-23.pdf | 17 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GID _ FORM 3 CA CERTIFICATE MARCH-23_com.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A [ANNEXURE C].pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2023.pdf | 10 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect Certificate.pdf | 28 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate-1.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 28 Mar 2023 |
| Proforma of Agreement for saleFile: 22_RERA Draft Agreement.pdf | 7 Nov 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf | 7 Nov 2022 |
| Status of ConveyanceFile: CONVEYANCE.pdf | 7 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF SALE AGREEMENT (LETTER HEAD).pdf | 7 Nov 2022 |
| Proforma of Allotment letterFile: Draft Allotment letter.pdf | 4 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AND RECONCILIATION.pdf | 13 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 29 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf | 29 Aug 2022 |
| PAN CardFile: GALA INFRA PAN CARD.pdf | 18 Aug 2022 |
| CERSAI detailsFile: 1 CERSAI details.pdf | 18 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 18 Aug 2022 |
| Layout approvalFile: LAYOUT APPROVAL.pdf | 10 Aug 2022 |
| Building plan approvalFile: BUILDING PLAN APPROVAL B WING.pdf | 10 Aug 2022 |
| Copy of the legal title reportFile: TITLE CERTIFICATE.pdf | 10 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf | 10 Aug 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION_LEGAL.pdf | 10 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf | 10 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL B WING.pdf | 10 Aug 2022 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 10 Aug 2022 |
| Declaration in FORM BFile: FORM B_COMPRESS.pdf | 10 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO MODEL COPY OF ALLOTMENT LETTER.pdf | 10 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GALA NIRVANA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI6,700+ in Mumbai Suburban
PEARL UNIVERSE
CHANDIWALA ENTERPRISES PRIVATE LIMITED
PRANAMI BLISS
Pranami Neev Realty Limited
Alpine Primo
ALPINE INFRAHEIGHTS LLP
NAMAN HABITAT
SHREE NAMAN DEVELOPERS PVT LTD
Vantage
Rolland Spaces Private Limited
Nasar Enclave Sale Building A and B Wing
M/s. Nasar Associates
See every Mumbai Suburban project, with the district possession charts
Builder: GALAVANCE INFRABUILD PRIVATE LIMITED
GALAVANCE INFRABUILD PRIVATE LIMITED has 1 registration on MahaRERA, including GALA NIRVANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that GALA NIRVANA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if GALA NIRVANA is delayed beyond 25 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GALA NIRVANA?
The registered promoter entity is GALAVANCE INFRABUILD PRIVATE LIMITED, a company as per the filing. Its CIN U43299MH2023PTC409218 and GSTIN 27AAKCG6759R1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GALA NIRVANA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GALA NIRVANA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GALA NIRVANA?
The professionals named in the filing: Architect: ASHIM KHATRI; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: DONGRE PROJECT MANAGEMENT CONSULTANTS PVT LTD; Chartered Accountant: AKASH G SHAH & ASSOCIATES; Chartered Accountant: GAJARIA SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GALA NIRVANA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback