Registration lapsed No litigation declared Residential / Group Housing project

GALA NIRVANA

By GALAVANCE INFRABUILD PRIVATE LIMITED

RG-MH-96018 · RERA P51800047812 · Last updated on MahaRERA portal: 22 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
3 of 11Construction stages donefurthest along: Stilt Floor, 50%
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

GALA NIRVANA is a Residential / Group Housing project by GALAVANCE INFRABUILD PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047812 on 28 Nov 2022. Possession was promised by 25 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameGALA NIRVANA
  • TypeResidential / Group Housing
  • Location
    • KEVNIPADA AMBIVALI
    • ANDHERI
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • RERA no.P51800047812
  • ReraGenie IDRG-MH-96018

Builder

  • NameGALAVANCE INFRABUILD PRIVATE LIMITED
  • Entity typeCompany
  • CINU43299MH2023PTC409218
  • GSTIN27AAKCG6759R1ZH
  • PartnersJIGNESH KULIN GALA, YOGESH KULIN GALA

Key dates

10 months past promisethis monthRegisteredNov 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Nov 2022
  • Promised completion25 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed77 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NIRVANA 58NA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

NIRVANA 58: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered54
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,077 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 May 2026
LandownerVillageDistrict
SNEHAL TOWERS CO-OPERATIVE HOUSING SOCIETY LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4388.72
Proposed, not sanctioned3,480 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, KRUSHNA KUNJ, PLOT 148, P K ROAD, MULUND WEST, MUMBAI 400080

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHIM KHATRI
EngineerEPICONS CONSULTANTS PVT LTD
EngineerDONGRE PROJECT MANAGEMENT CONSULTANTS PVT LTD
Chartered AccountantAKASH G SHAH & ASSOCIATES
Chartered AccountantGAJARIA SHAH & ASSOCIATES
PartnerRole in project
GALAVANCE INFRABUILD PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 RERA CERTIFICATE.pdf22 Jan 2026
Form 2File: Form 2 Cost Estimate Snehal Tower 311225.pdf22 Jan 2026
Form 3File: FORM-3 GALAVANCE_ DEC-2025.pdf22 Jan 2026
Disclosure of Sold and Booked InventoryFile: GIPL DISCLOSURE OF SOLD BOOKED INVENTORY 31.12.2025..pdf22 Jan 2026
Form 1File: FORM 1.pdf30 Oct 2025
Form 2File: Form 2 Cost Estimate 300925.pdf30 Oct 2025
Form 3File: FORM 3 GALAVANCE.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY 30092025.pdf30 Oct 2025
Form 1File: FORM 1 GALAVANCE -JUN-25.pdf18 Jul 2025
Form 2File: Form 2 Cost Estimate 300625.pdf18 Jul 2025
Form 3File: FORM 3 GALAVANCE- JUNE-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf18 Jul 2025
Form 1File: FORM 1.pdf28 Jun 2025
Form 2File: FORM 2.pdf28 Jun 2025
Form 3File: FORM 3.pdf28 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf28 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GALAVANCE_ ANN-A_ FORM 1 CERT.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GALAVANCE_FORM-3 CA CERTIFICATE.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUN-23.pdf26 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP-23.pdf26 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC-23.pdf26 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 MAR-24.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A MAR-23.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MAR-23.pdf26 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MAR-24.pdf26 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf8 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf8 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 301224.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 C A CERT_Dec-2024.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE FORM 1.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE.pdf28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 C A CERT_0001.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Cert 300324.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 300624.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_june-24.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE 2024.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Annexure - A Mar-24.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng cert 300324.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_0001_0001.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Annexure - A.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 C A_0001.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE SEPT-23_compressed (3).pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2223.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1Architect Certificate of Percentage of Completion of Work.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate 300623.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE JUNE-23.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GID _ FORM 3 CA CERTIFICATE MARCH-23_com.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A [ANNEXURE C].pdf17 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2023.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect Certificate.pdf28 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Cost Estimate-1.pdf28 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf28 Mar 2023
Proforma of Agreement for saleFile: 22_RERA Draft Agreement.pdf7 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY REGISTRATION CERTIFICATE.pdf7 Nov 2022
Status of ConveyanceFile: CONVEYANCE.pdf7 Nov 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF SALE AGREEMENT (LETTER HEAD).pdf7 Nov 2022
Proforma of Allotment letterFile: Draft Allotment letter.pdf4 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AND RECONCILIATION.pdf13 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf29 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf29 Aug 2022
PAN CardFile: GALA INFRA PAN CARD.pdf18 Aug 2022
CERSAI detailsFile: 1 CERSAI details.pdf18 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow18 Aug 2022
Layout approvalFile: LAYOUT APPROVAL.pdf10 Aug 2022
Building plan approvalFile: BUILDING PLAN APPROVAL B WING.pdf10 Aug 2022
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf10 Aug 2022
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf10 Aug 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCE DECLARATION_LEGAL.pdf10 Aug 2022
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf10 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN APPROVAL B WING.pdf10 Aug 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf10 Aug 2022
Declaration in FORM BFile: FORM B_COMPRESS.pdf10 Aug 2022
Deviation Report with respect to Allotment letterFile: DEVIATION REPORT WITH RESPECT TO MODEL COPY OF ALLOTMENT LETTER.pdf10 Aug 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GALA NIRVANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI6,700+ in Mumbai Suburban

Builder: GALAVANCE INFRABUILD PRIVATE LIMITED

GALAVANCE INFRABUILD PRIVATE LIMITED has 1 registration on MahaRERA, including GALA NIRVANA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that GALA NIRVANA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GALA NIRVANA is delayed beyond 25 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GALA NIRVANA?

The registered promoter entity is GALAVANCE INFRABUILD PRIVATE LIMITED, a company as per the filing. Its CIN U43299MH2023PTC409218 and GSTIN 27AAKCG6759R1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GALA NIRVANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GALA NIRVANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GALA NIRVANA?

The professionals named in the filing: Architect: ASHIM KHATRI; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: DONGRE PROJECT MANAGEMENT CONSULTANTS PVT LTD; Chartered Accountant: AKASH G SHAH & ASSOCIATES; Chartered Accountant: GAJARIA SHAH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GALA NIRVANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GALA NIRVANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GALA NIRVANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.