Home / Browse projects / Raigarh, Maharashtra / Gajanan Vatika Residency Building -2

Registered No litigation declared Residential / Group Housing project

Gajanan Vatika Residency Building -2

By M/S. WONDER HOMES

RG-MH-04152 · RERA P52000021347 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 47 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 47 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
79 of 95Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

Gajanan Vatika Residency Building -2 is a Residential / Group Housing project by M/S. WONDER HOMES in Raigarh, Maharashtra, registered with MahaRERA as P52000021347 on 24 Jun 2019. Possession is promised by 30 Nov 2026. The completion date has moved by 47 months from the original filing. 16 of the 95 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameGajanan Vatika Residency Building -2
  • TypeResidential / Group Housing
  • Location
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000021347
  • ReraGenie IDRG-MH-04152

Builder

  • NameM/S. WONDER HOMES
  • Entity typePartnership
  • PartnersAJAY BACHUBHAI CHAWDA, JAYANTILAL ARJANBHAI WAGHELA, BHAVESH MAVJIBHAI PATIVALA, CHETAN MAVJIBHAI PATIVALA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2019First promiseDec 2022Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jun 2019
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed88 files

Current status

17%16 of 95 units booked
93.4%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gajanan Vatika Residency Building- 2NA9795095

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Gajanan Vatika Residency Building- 2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,880 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025
LandownerVillageDistrict
Jayshri Suresh KhopeKhopoliRaigarh
Sanjay Suresh KhopeKhopoliRaigarh
Divya Deelip KadavKhopoliRaigarh

Approvals and building plan

Sanctioning authorityKhopoli Municipal Corporation
Permissible FSI4301.02
Proposed, not sanctioned4,301 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDAFFODILS BUILDING PANVELMATHERAN ROAD SECTOR 12 PLOT NO24 NEW PANVEL NAVI MUMBAI PIN 410206
Estimated costRs 6.00 cr
Cost incurredRs 5.61 cr
Work done93.43%
BuildingWingEstimatedIncurred
Gajanan Vatika Residency Building- 2NARs 5.70 crRs 5.31 cr
-NARs 30.00 lakhRs 30.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectC M SAMANT
EngineerSK Consultants & Engineers
EngineerNexus Consultants & Engineer
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantPratiksha Tulshyan & Associates
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh &Associates
PartnerRole in project
M/S. WONDER HOMES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000012882Dec 2022 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons, particularly the pandemic of Covid-19. We have the consent of 66.67% of allottees for purpose of extension of RERA registration period of the said project.

EXT52000025408Dec 2022 → Dec 2025

Reason as filed by the promoterWe sincerely apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to unforeseen issues with procurement, unexpected site conditions, and coordination challenges. Despite these setbacks, we are diligently working to address these challenges and to complete the remaining work. Currently, 78% of the project has been completed. We are in the final stages and intend to apply for the Occupancy Certificate once the remaining work is finished. We are closely monitoring the progress and are taking all necessary steps to ensure the timel

EA23072621843Dec 2022 → Nov 2026

Reason as filed by the promoterwe, M/s. Wonder Homes, hereby declare the following with respect to the project Gajanan Vatika Residency Building -2 bearing registration number P52000021347 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 15-05-2026 and we have also initiated the process for the possession as well. However, there is mismatch occurred in certain details on the MahaRERA profile as compared with the sanctioned plans, such as the sanctioned built-up a

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf10 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A FY-2025-26.pdf23 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A FY-2024-25.pdf23 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A- 2023-24.pdf23 Jul 2026
Form 2A (FY 2019-2020)File: Form 2A- 2019-20.pdf23 Jul 2026
Form 2A (FY 2020-2021)File: Form 2A- 2020-21.pdf23 Jul 2026
Form 2A (FY 2021-2022)File: Form 2A- 2021-22.pdf23 Jul 2026
Form 2A (FY 2022-2023)File: Form 2A- 2022-23.pdf23 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A- 2023-24.pdf23 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A FY-2024-25.pdf23 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A FY-2025-26.pdf23 Jul 2026
Withdrawal Update Form 1File: Form 1 - June 2025.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf31 Mar 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2 - June 2025.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf31 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3- June 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3- Sept 2025.pdf31 Mar 2026
Withdrawal Update Form 3File: Form 3- Dec 2025.pdf31 Mar 2026
Form 1File: Form 1- 31-12-2024.pdf10 Jun 2025
Form 2File: Form 2 311224.pdf10 Jun 2025
Form 3File: Form 3 311224_11zon (1).pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - 31-12-2024.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of QPR - 31-12-24.pdf10 Jun 2025
Form 1File: Form 1 - 31-03-2025.pdf10 Jun 2025
Form 2File: Form 2 310325.pdf10 Jun 2025
Form 3File: Form 3 310325_11zon.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 31-03-2025.pdf10 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of QPR - 31-03-25.pdf10 Jun 2025
Form 5 (FY 2022-2023)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (3).pdf10 Jun 2025
Form 5 (FY 2023-2024)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (1).pdf10 Jun 2025
Certificates of CA (Form 3)File: Form 3 30-09-2024_compressed.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf18 Dec 2024
Declaration in FORM BFile: Form B.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- 30-09-2024.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Wonder Homes.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5- 19-20.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf5 Dec 2024
CERSAI detailsFile: Declaration Of CERSAI.pdf5 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A- 22-23.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf5 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate 23-24.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 23-24.pdf5 Dec 2024
Certificates of CA (Form 3)File: Form 3- Gajanan Vatika Residency Building 2 as on 31-03-2024.pdf11 Oct 2024
Certificates of CA (Form 3)File: Form 3- Gajanan Vatika Residency Building 2 as on 30-06-2024.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Gajanan Vatika Residency Building 2 as on March 2024.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Gajanan Vatika-as on 31st December 2023.pdf26 Mar 2024
Certificates of CA (Form 3)File: Form 3- Gajanan Vatika-as on 31st December 2023.pdf26 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 2019-20_Gajanan Vatika Bldg 2_compressed.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 2020-21_Gajanan Vatika Bldg 2_compressed.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 2021-22_Gajanan Vatika Bldg 2_compressed.pdf20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Gajanan Vatika as on 31-03-2023.pdf6 Jan 2024
Building plan approvalFile: plan copy scan 1,2,3_11zon.pdf5 Dec 2023
Building Plan Approval (IOD)File: plan copy scan 1,2,3_11zon.pdf5 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: letter scan_compressed.pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5_FY 2019-20_Gajanan Vatika Bldg 2_compressed.pdf23 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_FY 2020-21_Gajanan Vatika Bldg 2_compressed.pdf23 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 2021-22_Gajanan Vatika Bldg 2.pdf23 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Wonder Homes 2A 19-20.pdf19 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Wonder Homes 2A 20-21.pdf19 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wonder Homes 2A 21-22.pdf19 Nov 2022
Declaration about Commencement CertificateFile: Format D.pdf16 Nov 2022
Disclosure of sold/ booked inventoryFile: Circular 29.pdf16 Nov 2022
Certificates of CA (Form 3)File: Form 3 - Gajanan Vatika Residency-min.pdf13 Jun 2019
Proforma of Allotment letterFile: Agreement Draft - Wonderhomes (1)(1).pdf13 Jun 2019
Building plan approvalFile: IOD.pdf12 Jun 2019
Building plan approvalFile: IOD 2.pdf12 Jun 2019
Building plan approvalFile: IOD 3.pdf12 Jun 2019
Layout approvalFile: Layout plan.pdf12 Jun 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Gajanan Vatika ResidencyP52000005219Khopoli, RaigarhAug 2017CompletedDec 2021Jun 2018

How this compares with Raigarh

17%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 47 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gajanan Vatika Residency Building -2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khopoli5,900+ in Raigarh

2 kmGajanan Vatika ResidencyCompleted 27Lapsed / revoked 6Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: M/S. WONDER HOMES

M/S. WONDER HOMES has 2 registrations on MahaRERA, including Gajanan Vatika Residency and Gajanan Vatika Residency Building -2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Gajanan Vatika Residency Building -2 is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gajanan Vatika Residency Building -2?

The registered promoter entity is M/S. WONDER HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gajanan Vatika Residency Building -2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gajanan Vatika Residency Building -2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gajanan Vatika Residency Building -2?

The professionals named in the filing: Architect: C M SAMANT; Engineer: SK Consultants & Engineers; Engineer: Nexus Consultants & Engineer; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gajanan Vatika Residency Building -2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gajanan Vatika Residency Building -2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gajanan Vatika Residency Building -2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.