ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / GAJANAN SQUARE

Completed No litigation declared Commercial project

GAJANAN SQUARE

By DINESH EKNATH KHANDRE

RG-MH-13843 · RERA P51600028892 · Last updated on MahaRERA portal: 23 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
13 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 15%
0Complaints at MahaRERAon this registration
Jump to the 170 documents Report an error

GAJANAN SQUARE is a Commercial project by DINESH EKNATH KHANDRE in Nashik, Maharashtra, registered with MahaRERA as P51600028892 on 5 Apr 2021. The registration is recorded completed; possession was promised by 10 Aug 2025.

At a glance

Project

  • NameGAJANAN SQUARE
  • TypeCommercial
  • Location
    • NARAYANBAPU NAGAR CIRCLE
    • NASHIK ROAD
    • Nashik
    • 422101
  • Pincode422101
  • RERA no.P51600028892
  • ReraGenie IDRG-MH-13843

Builder

  • NameDINESH EKNATH KHANDRE
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed4 of 4
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2021PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2021
  • Promised completion10 Aug 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed170 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAJANAN SQUARE ANA30000
GAJANAN EMPIRENA80000
GAJANAN SQUARE CNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 15%.

GAJANAN SQUARE A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GAJANAN EMPIRE29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GAJANAN SQUARE C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed175

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots175
Open Space175

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,748 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5452.67
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDATTA MANDIR CIRCLE, NASHIK ROAD - 422101

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUMIT M KUMATH
ArchitectAJIT KULKARNI
EngineerBHUSHAN SHINTRE
Chartered AccountantSWAPNIL P CHAVAN
Chartered AccountantDILIP PANDURANG PALDE
PartnerRole in project
DINESH EKNATH KHANDRE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Apr 2023

Documents filed170

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 170 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1 ARCHITECT.pdf23 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf23 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf23 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf23 Nov 2025
Form 1File: architech certi.pdf8 Nov 2025
Form 2File: engg cert.pdf8 Nov 2025
Form 3File: ca certi.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: ArchiReracertNOV21.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CER.pdf8 Nov 2025
Form 3File: Form 1 ca certificate.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory.pdf8 Nov 2025
Form 1File: ARCHITECTS CERETIFICATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERT.pdf8 Nov 2025
Form 3File: chartered accountant certificate.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory.pdf8 Nov 2025
Form 1File: FORM 1 architect cerficate.pdf8 Nov 2025
Form 2File: form 2 engg certi.pdf8 Nov 2025
Form 3File: chartered accountant certificate.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold_inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT.pdf8 Nov 2025
Form 2File: FORM 2 JUNE 22.pdf8 Nov 2025
Form 3File: FORM 3 CA.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT.pdf8 Nov 2025
Form 2File: FORM 2 SEPT 22.pdf8 Nov 2025
Form 3File: FORM 3 CA.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT..pdf8 Nov 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE.pdf8 Nov 2025
Form 3File: form-3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: FORM-1ARCHITECTS CERTIFCATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon (10).pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sol inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTI.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTI.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTI.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon (12).pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE_11zon (13).pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERT.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf8 Nov 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2025
Form 2File: FORM 2 ENGG CERTIFICATE.pdf8 Nov 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf8 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERT.pdf12 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERT.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGG CERTIFICATE.pdf12 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf2 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERT.pdf26 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
GAJANAN VILLA APARTMENTDASAK JAIL ROAD NASHIK ROAD 4221017CompletedJan 2021Feb 2019

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAJANAN SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK ROAD4,100+ in Nashik

Builder: DINESH EKNATH KHANDRE

DINESH EKNATH KHANDRE has 4 registrations on MahaRERA, including GAJANAN VILLAS and GAJANAN PARADISE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if GAJANAN SQUARE is delayed beyond 10 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAJANAN SQUARE?

The registered promoter entity is DINESH EKNATH KHANDRE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAJANAN SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAJANAN SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAJANAN SQUARE?

The professionals named in the filing: Architect: SUMIT M KUMATH; Architect: AJIT KULKARNI; Engineer: BHUSHAN SHINTRE; Chartered Accountant: SWAPNIL P CHAVAN; Chartered Accountant: DILIP PANDURANG PALDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAJANAN SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAJANAN SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAJANAN SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.