ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Gajanan Plaza

Completed No litigation declared Mixed project

Gajanan Plaza

By BALIRAM GAJANAN OWALEKAR

RG-MH-03150 · RERA P52000021312 · Last updated on MahaRERA portal: 29 Jul 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2023Possession promisedregistration recorded completed
8 of 11Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 5%
0 of 1Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 30 documents Report an error

Gajanan Plaza is a Mixed project by BALIRAM GAJANAN OWALEKAR in Raigarh, Maharashtra, registered with MahaRERA as P52000021312 on 21 Jun 2019. The registration is recorded completed; possession was promised by 16 Apr 2023. 1 of the 1 unit on this registration is recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameGajanan Plaza
  • TypeMixed
  • Location
    • URAN BELAPUR ROAD
    • ULWE NAVI MUMBAI
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000021312
  • ReraGenie IDRG-MH-03150

Builder

  • NameBALIRAM GAJANAN OWALEKAR
  • Entity typeIndividual

Key dates

this monthRegisteredJun 2019PromisedApr 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jun 2019
  • Promised completion16 Apr 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed30 files

Current status

100%1 of 1 units booked

Figures as on 29 Jul 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAJANAN PLAZANA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 5%.

GAJANAN PLAZA73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered6

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area320 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Gajanan Pilaji OwalekarUlaweRaigarh
Prabhakar Gajanan OwalekarTargharRaigarh
MR BALIRAM GAJANAN OWALEKARUlaweRaigarh

Approvals and building plan

Permissible FSI1.5
Proposed, not sanctioned2 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No S14 Ground floor Ulwe Commercial Complex Sector 19 A Ulwe Dist Raigad Navi Mumbai 410206

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRIARCH DESIHN STUDIO
EngineerAbhinandan Ajit Desai
PartnerRole in project
BALIRAM GAJANAN OWALEKAR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jan 2022

Documents filed30

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 530.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: page 1 (1).pdf11 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf10 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Feb 2023
Proforma of Agreement for saleFile: Proforma of the allotment letter and agreement for sale (Baliram Owalekar).pdf8 Feb 2023
PAN CardFile: Pan Card (1).pdf7 Feb 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances.pdf7 Feb 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certificates of CA.pdf7 Feb 2023
Deviation Report with respect to Allotment letterFile: Proforma of the allotment letter and agreement for sale (Baliram Owalekar).pdf7 Feb 2023
Other - LegalFile: Change in Promoter.pdf7 Feb 2023
Declaration about Commencement CertificateFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf3 Feb 2023
Architect’s Certificate on Completion of Project (Form 4)File: ARCHITECT CERTIFICATE Form 4.pdf3 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 530 OC.pdf11 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf31 May 2021
Copy of the legal title reportFile: legal title report.pdf26 Nov 2019
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf25 Nov 2019
Declaration in FORM BFile: FORM B_compressed_compressed 123.pdf24 Jun 2019
Certificates of CA (Form 3)File: Certificates of CA.pdf6 Jun 2019
Copy of the legal title reportFile: Copy of the legal title report.pdf5 Jun 2019
Details of encumbrancesFile: Details of encumbrances.pdf5 Jun 2019
Declaration in FORM BFile: Declaration in FORM B.pdf5 Jun 2019
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf5 Jun 2019
Layout approvalFile: Copy of Layout Approval.pdf8 May 2019
Building plan approval or NA orderFile: Building Plan Approval.pdf8 May 2019
Copy of Layout Approval (in case of layout)File: Copy of Layout Approval.pdf8 May 2019
Building Plan Approval (IOD)File: Building Plan Approval.pdf8 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificates.pdf8 May 2019

How this compares with Raigarh

100%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gajanan Plaza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ULWE NAVI MUMBAI5,900+ in Raigarh

Builder: BALIRAM GAJANAN OWALEKAR

BALIRAM GAJANAN OWALEKAR has 1 registration on MahaRERA, including Gajanan Plaza. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Gajanan Plaza is delayed beyond 16 Apr 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gajanan Plaza?

The registered promoter entity is BALIRAM GAJANAN OWALEKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gajanan Plaza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Gajanan Plaza?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gajanan Plaza?

The professionals named in the filing: Architect: TRIARCH DESIHN STUDIO; Engineer: Abhinandan Ajit Desai. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gajanan Plaza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gajanan Plaza. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gajanan Plaza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.