GAIKWAD RESIDENCY

By NIWARA GROUP

RG-MH-44867 · RERA P51700032676 · Last updated on MahaRERA portal: 13 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 80%
7 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

GAIKWAD RESIDENCY is a Residential / Group Housing project by NIWARA GROUP in Thane, Maharashtra, registered with MahaRERA as P51700032676 on 17 Jan 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 28 of the 35 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameGAIKWAD RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Umbharni Maniwali Road
    • Near Water Tank
    • Chavindra
    • Thane
    • 421102
  • Pincode421102
  • RERA no.P51700032676
  • ReraGenie IDRG-MH-44867

Builder

  • NameNIWARA GROUP
  • Entity typePartnership
  • PartnersReshma Sandeep Gaikwad, Tejshri Hemant Gaikwad, Hemant Baban Gaikwad

Key dates

this monthRegisteredJan 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Jan 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed35 files

Current status

80%28 of 35 units booked
85.2%Work done, per cost certificate

Figures as on 13 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAIKWAD RESIDENCYNA9735035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

GAIKWAD RESIDENCY: 51% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered1
Open Space16

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,060 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
HEMANT BABAN GAIKWADKalyanThane
SANDEEP BABAN GAIKWADKalyanThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI5677.0
Proposed, not sanctioned1,442 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANADHISH GANESH MANDIR RD, MANDA, TITWALA, 421605
Estimated costRs 2.80 cr
Cost incurredRs 2.39 cr
Work done85.22%
BuildingWingEstimatedIncurred
GAIKWAD RESIDENCYNARs 2.66 crRs 2.27 cr
-NARs 14.00 lakhRs 11.93 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVitan Consultants
EngineerKhasnis & Associates
EngineerSK Consultants & Engineers
Chartered AccountantGanesh Gokul Patil
Chartered AccountantNB Sayed & Associates
PartnerRole in project
NIWARA GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13012619431Dec 2025 → Dec 2026

Reason as filed by the promoterWe apologize for the delay in the completion of the project. The delay occurred as the project was registered under RERA on 17/01/2022, and due to the post-COVID impact, the real estate sector was adversely affected. As a result, we received our first booking only around July 2023, which led to low initial sales and subsequent financial constraints. Since this is our first project and we had no prior experience, these challenges further impacted the project timeline. However, we have now stabilized financially, work is progressing efficiently, and we are fully committed to completing the proje

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Dec 25.pdf13 Mar 2026
Withdrawal Update Form 2File: Form 2 - Dec 25.pdf13 Mar 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Certificate_05022024.pdf12 Jan 2026
Withdrawal Update Form 1File: Architect Certificate_05022024.pdf12 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM 2_11zon.pdf12 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE FORM 2_11zon.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 of Gaikwad Residency till 30-09-2025.pdf12 Jan 2026
Withdrawal Update Form 3File: Form 3 of Gaikwad Residency till 30-09-2025.pdf12 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Niwara group FORM3.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3F.pdf9 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_c.pdf29 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: NOTARY.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_05022024.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FORM 2_11zon.pdf14 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf14 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format_Bank Account updation.pdf14 Mar 2024
Copy of the legal title reportFile: Legal Title Report.pdf10 Jan 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf10 Jan 2022
CERSAI detailsFile: CERSAI REPORT.pdf10 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 Jan 2022
Declaration in FORM BFile: Form b 1.pdf23 Dec 2021
Layout approvalFile: layout.pdf22 Dec 2021
Building plan approvalFile: layout.pdf22 Dec 2021
PAN CardFile: niwara group pan.pdf22 Dec 2021
Copy of the legal title reportFile: Title certificate 2.pdf22 Dec 2021
Copy of the legal title reportFile: Title Certificate.pdf22 Dec 2021
Details of encumbrancesFile: encrumbrance certificate.pdf22 Dec 2021
Copy of Layout Approval (in case of layout)File: layout.pdf22 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: layout.pdf22 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf22 Dec 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf22 Dec 2021
Proforma of Allotment letterFile: Provisional Allotment Letter (1).pdf22 Dec 2021

How this compares with Thane

80%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAIKWAD RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Water Tank7,600+ in Thane

Builder: NIWARA GROUP

NIWARA GROUP has 1 registration on MahaRERA, including GAIKWAD RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GAIKWAD RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAIKWAD RESIDENCY?

The registered promoter entity is NIWARA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAIKWAD RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAIKWAD RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAIKWAD RESIDENCY?

The professionals named in the filing: Architect: Vitan Consultants; Engineer: Khasnis & Associates; Engineer: SK Consultants & Engineers; Chartered Accountant: Ganesh Gokul Patil; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAIKWAD RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAIKWAD RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAIKWAD RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.