ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Gagan 138

Completed No litigation declared Residential / Group Housing project

Gagan 138

By GAGANGIRI CONSTRUCTION

RG-MH-75457 · RERA P51800033983 · Last updated on MahaRERA portal: 1 Aug 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
41 of 141Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

Gagan 138 is a Residential / Group Housing project by GAGANGIRI CONSTRUCTION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033983 on 14 Mar 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 100 of the 141 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGagan 138
  • TypeResidential / Group Housing
  • Location
    • BUILDING NO 138 SARITA VIDYA MAHAL CHSL NEHRU NAGAR
    • KURLA EAST
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033983
  • ReraGenie IDRG-MH-75457

Builder

  • NameGAGANGIRI CONSTRUCTION
  • Entity typePartnership
  • PartnersANITA JITENDRA DEWOOLKAR, PARTH JITENDRA DEWOOLKAR, HARSH RAJENDRA DEWOOLKAR, JITENDRA GOVIND DEWOOLKAR
  • Other registrations4 more →
  • Completed1 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed123 files

Current status

71%100 of 141 units booked

Figures as on 1 Aug 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gagan 138NA19191392141

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Gagan 138: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,038 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jul 2025

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI8233.0
Proposed, not sanctioned8,233 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 7 BHARAT ARCH Andheri West MUMBAI 400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR.SONAL AREKAR & ASSOCIATES
EngineerSIHAVAT CONSULTANCY SERVICES
Chartered AccountantP.V DALAL & CO.
PartnerRole in project
GAGANGIRI CONSTRUCTION-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000375207Gagangiri ConstructionMr Kapil Sopan Dhumal10/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Oct 2024

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC Plan_organized.pdf1 Aug 2025
Occupational CertificateFile: Mail B P Cell MHADA Outlook Full O C for Build No 138 Nehru Nagar kurla.pdf4 Jul 2025
Occupational CertificateFile: 138 Final OC.pdf28 Jun 2025
Occupational CertificateFile: Form 4 GC.pdf28 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC 138 Form 1.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3Gagan138 signed.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC 138Form 3.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gc 138 Form 2.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Gc 138 Inventory.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A RERA bldg no 138 14102024.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A RERA bldg no 138 14102024.pdf14 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GC OC 050924.pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC plan 1_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 2_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 3_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 4_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GC OC 050924.pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC plan 1_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 2_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 3_compressed (1).pdf11 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Plan 4_compressed (1).pdf11 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 138 Form 1 Sep 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 138 Form 2 Sep 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 138 Form 3 sep 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 138 Inventory sep 2024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GC form 5 sep 24.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 138 Form 1 Sep 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 138 Form 3 sep 2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 138 Form 2 Sep 2024.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 138 Inventory sep 2024.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GC form 5 sep 24.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC 138 Architech Certificate Form 1.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC 138 Engineer Certificate Form 2.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: GC 138 Inventory.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC 138 CA certificate Form 3.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory GC 24.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 GC.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2.pdf6 Apr 2024
Disclosure of sold/ booked inventoryFile: GC Inventory.pdf6 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 GC.pdf6 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 138 Part OC 1-2.pdf2 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 138 Part OC with plan 1_11zon.pdf2 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 138 Part OC with plan 2_11zon.pdf2 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 138 Part OC with plan 3_11zon.pdf2 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 138 Part OC with plan 4_11zon.pdf2 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 23 Architect certificate_compressed.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC 138.PDF11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC Engineers certificate_compressed.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: GC inventory_compressed.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC CA certificate_compressed.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC Form 2 Sep Engineer certificate.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: GC Sep Inventory.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC Sep 2023 form 3_11zon.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GC Form 5.pdf26 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GC Form 5.pdf26 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf9 Sep 2023
Disclosure of sold/ booked inventoryFile: GC inventory june 2023.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC arc certificate.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GC.pdf17 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC CA certificate june 2023.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC Form 2 Engineer certificate.pdf13 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arc certificate GC.pdf12 Apr 2023
Disclosure of sold/ booked inventoryFile: GC Inventory.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC Form 3 CA certificate.pdf12 Apr 2023
Building plan approvalFile: GC IOA 21022023.pdf24 Mar 2023
Building plan approvalFile: GC IOA ground Floor Plan.pdf24 Mar 2023
Building plan approvalFile: GC IOA 1st 2nd.pdf24 Mar 2023
Building plan approvalFile: GC IOA Plan 4.pdf24 Mar 2023
Building plan approvalFile: GC IOA Plan 3.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: GC IOA 21022023.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: GC IOA ground Floor Plan.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: GC IOA 1st 2nd.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: GC IOA Plan 4.pdf24 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: GC IOA Plan 3.pdf24 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 138 FULL Commencement Certificate.pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 GC Dec 22.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Final Form 2 GC Dec 22.pdf12 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final GC Form 3 CA certificate_.pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final Form1.pdf11 Jan 2023
Disclosure of sold/ booked inventoryFile: GCinventory 06012023 (1).pdf11 Jan 2023

How this compares with Mumbai Suburban

71%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gagan 138 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA EAST6,700+ in Mumbai Suburban

2 kmGagan 138Completed 127Lapsed / revoked 118Other 161Dot size: filed unitsN

Filed coordinates, straight-line distance. 406 registered projects within 2 km.

Builder: GAGANGIRI CONSTRUCTION

Gagangiri Construction has 5 registrations on MahaRERA, including AEROVISTA and Gagan 138. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Gagan 138 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gagan 138?

The registered promoter entity is GAGANGIRI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gagan 138?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gagan 138?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gagan 138?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gagan 138?

The professionals named in the filing: Architect: AR.SONAL AREKAR & ASSOCIATES; Engineer: SIHAVAT CONSULTANCY SERVICES; Chartered Accountant: P.V DALAL & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gagan 138?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gagan 138. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gagan 138 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.