Home / Browse projects / Raigarh, Maharashtra / FUTURE SKY
FUTURE SKY
By FUTURE INFRA
RG-MH-97237 · RERA P52000046707 · Last updated on MahaRERA portal: 23 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
FUTURE SKY is a Residential / Group Housing project by FUTURE INFRA in Raigarh, Maharashtra, registered with MahaRERA as P52000046707 on 30 Aug 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date.
At a glance
Project
- NameFUTURE SKY
- TypeResidential / Group Housing
- Location
- PLOT NO. 38
- T.P.S. - 01
- VILLAGE AKURLI
- TALUKA - PANVEL
- Akurli
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000046707
- ReraGenie IDRG-MH-97237
Builder
- NameFUTURE INFRA
- Entity typePartnership
- GSTIN27AAHFF4420C1ZW
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersDEVRAJ GOKUL RAVARIA, GOKAR BHURA PATEL, PARESH RAVJI PATEL, TEJSHI MADEVA CHAMARIYA, MAYUR DEVRAJ RAVARIA, ROHIT LALJI PATEL
- Other registrations2 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on30 Aug 2022
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| FUTURE SKY | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
FUTURE SKY: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEEPAK P THAKARE |
| Engineer | SUBRAMANYA RAO |
| Chartered Accountant | DEEPAK GOVIND PATEL |
| Partner | Role in project |
|---|---|
| FUTURE INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March25.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA.pdf | 1 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf | 1 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-FY 23-24-FUTURE SKY-F.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-FY 23-24-FUTURE SKY-F.pdf | 21 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 4 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf | 4 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 4 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 4 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 FUTURE INFRA ARCHITECTS CERTIFICATE.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 FUTURE INFRA ENGINEERS CERTIFICATE.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 - Future Infra-signed.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Architects Certificte.pdf | 1 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Project Future Sky.pdf | 29 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 - Future Infra.pdf | 27 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assusrance proj future sky.pdf | 16 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations FUTURE SKY.pdf | 16 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-FY 22-23-FUTURE SKY.pdf | 30 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 1 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 23 Jun 2023 |
| Proforma of Agreement for saleFile: New Sale Agreement.pdf | 11 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Encumbrance Letter-bank.pdf | 11 Jan 2023 |
| Details of encumbrancesFile: Encumbrance_Certificate.pdf | 21 Nov 2022 |
| Proforma of Allotment letterFile: Allotment Letter_Future Sky.pdf | 18 Aug 2022 |
| Proforma of Allotment letterFile: Project AFS-Changed-17-08-2022.pdf | 18 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report.pdf | 18 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report.pdf | 18 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate-08072022.pdf | 9 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Encumbrance Letter-bank-OK.pdf | 9 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Cheque.pdf | 9 Jul 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrace Letter.pdf | 2 Jul 2022 |
| Layout approvalFile: file_1.pdf | 23 Jun 2022 |
| Layout approvalFile: file_2.pdf | 23 Jun 2022 |
| Layout approvalFile: file_3.pdf | 23 Jun 2022 |
| Layout approvalFile: file_4.pdf | 23 Jun 2022 |
| Building plan approvalFile: file_1.pdf | 23 Jun 2022 |
| Building plan approvalFile: file_2.pdf | 23 Jun 2022 |
| Building plan approvalFile: file_3.pdf | 23 Jun 2022 |
| Building plan approvalFile: file_4.pdf | 23 Jun 2022 |
| PAN CardFile: Pan Card Future Infra.pdf | 23 Jun 2022 |
| Copy of the legal title reportFile: Title Report.pdf | 23 Jun 2022 |
| Details of encumbrancesFile: Encumbrace Letter.pdf | 23 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: file_1.pdf | 23 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: file_2.pdf | 23 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: file_3.pdf | 23 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: file_4.pdf | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: file_1.pdf | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: file_2.pdf | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: file_3.pdf | 23 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: file_4.pdf | 23 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC FUTURE SKY PLOT NO 38.pdf | 23 Jun 2022 |
| Declaration about Commencement CertificateFile: Form D - Commencement Certificate.pdf | 23 Jun 2022 |
| Declaration in FORM BFile: Form B_Devraj.pdf | 23 Jun 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECTS CERTIFICATE.pdf | 23 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_ENGIRING CERTIFICATE.pdf | 23 Jun 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 23 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep FUTURE SKY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILLAGE AKURLI, TALUKA - PANVEL5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: FUTURE INFRA
FUTURE INFRA has 3 registrations on MahaRERA, including FUTURE SKY and Future Crown. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that FUTURE SKY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if FUTURE SKY is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of FUTURE SKY?
The registered promoter entity is FUTURE INFRA, a partnership as per the filing. Its GSTIN 27AAHFF4420C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in FUTURE SKY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for FUTURE SKY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at FUTURE SKY?
The professionals named in the filing: Architect: DEEPAK P THAKARE; Engineer: SUBRAMANYA RAO; Chartered Accountant: DEEPAK GOVIND PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in FUTURE SKY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback