Future City II
RG-MH-77114 · RERA P50500054314 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Future City II is a Plotted project by Eknath Wasudeo Bhanare in Nagpur, Maharashtra, registered with MahaRERA as P50500054314 on 15 Jan 2024. Possession is promised by 26 Sep 2027. 0 of the 26 units on this registration are recorded sold or booked.
At a glance
Project
- NameFuture City II
- TypePlotted
- Location
- Kamptee road
- Bhilgaon
- Kamptee
- Nagpur
- 440026
- Pincode440026
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500054314
- ReraGenie IDRG-MH-77114
Builder
- NameEknath Wasudeo Bhanare
- Entity typeIndividual
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Jan 2024
- Promised completion26 Sep 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed82 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Eknath Wasudeo Bhanare | Bhilgaon | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NA Plot Without Structure | NA | Rs 2.30 cr | Rs 75.00 lakh |
| - | NA | Rs 2.30 cr | Rs 2.09 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajesh Chhotelal Tripathi |
| Architect | Rajesh Tripathi |
| Engineer | Rajesh Chhotelal Tripathi |
| Engineer | Rajesh Tripathi |
| Chartered Accountant | D P Sarda & Co |
| Chartered Accountant | Padma Vyas |
| Chartered Accountant | Mukund Sarda |
| Partner | Role in project |
|---|---|
| Eknath Wasudeo Bhanare | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Dec 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 26 Sep 2027
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 March26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 March26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 march 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 march 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 20 Oct 2025 |
| Form 2A (FY 2023-2024)File: Form 2A (2023-24).pdf | 17 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A(2024-25).pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: Architects certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: engineer certificate.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: 1 CA Certificate on Project Cost u0026 Fund withdrawal (Form 3).pdf | 16 Oct 2025 |
| Form 1File: Form 1.pdf | 15 Jul 2025 |
| Form 2File: Form 2.pdf | 15 Jul 2025 |
| Form 3File: Form 3.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Table C.pdf | 15 Jul 2025 |
| Form 1File: Form 1.pdf | 15 Jul 2025 |
| Form 2File: Form 2.pdf | 15 Jul 2025 |
| Form 3File: Form 3.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Table C.pdf | 15 Jul 2025 |
| Form 1File: Form1.pdf | 15 Jul 2025 |
| Form 2File: Form 2.pdf | 15 Jul 2025 |
| Form 3File: Form 3.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Table C.pdf | 15 Jul 2025 |
| Form 1File: Form 1.pdf | 15 Jul 2025 |
| Form 2File: Form 2.pdf | 15 Jul 2025 |
| Form 3File: Form 3.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Table C.pdf | 15 Jul 2025 |
| Form 1File: Form 1.pdf | 15 Jul 2025 |
| Form 2File: Form 2.pdf | 15 Jul 2025 |
| Form 3File: Form 3.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Table C.pdf | 15 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 30-06-2024.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certificate 31-03-2024.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate 2.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca Certificate 1.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate 2.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 30-06-2024.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 31-03-2024.pdf | 20 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: SCN2023112079-1.pdf | 2 Jan 2024 |
| Other - TechnicalFile: SCN2023112079-1.pdf | 2 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200289696354_For_Asset_Based_Search_12_12_2023_11_00_37_361.pdf | 12 Dec 2023 |
| CERSAI detailsFile: CERSAI Declaration.pdf | 12 Dec 2023 |
| Copy of the legal title reportFile: null (3).pdf | 11 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: MX-M315NV_20230623_222254.pdf | 11 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: null (4).pdf | 11 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Nitesh CC Verification.pdf | 11 Dec 2023 |
| Declaration in FORM BFile: Form B Nitesh.pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: null (5) (1) (1).pdf | 11 Dec 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow | 11 Dec 2023 |
| Other - LegalFile: Clarification on land area.pdf | 11 Dec 2023 |
| Other - TechnicalFile: ilovepdf_merged (39).pdf | 11 Dec 2023 |
| Other - TechnicalFile: Clarification on land area.pdf | 11 Dec 2023 |
| Declaration about Commencement CertificateFile: MX-M315NV_20231205_151609 (1).pdf | 6 Dec 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MX-M315NV_20231205_151507.pdf | 6 Dec 2023 |
| Proforma of Agreement for saleFile: organized (13).pdf | 6 Dec 2023 |
| Proforma of Allotment letterFile: organized (14) (1).pdf | 6 Dec 2023 |
| Deviation Report with respect to Allotment letterFile: organized (15).pdf | 6 Dec 2023 |
| Deviation Report with respect to model copy of AgreementFile: MX-M315NV_20231205_151556.pdf | 6 Dec 2023 |
| Layout approvalFile: Details of Layout_compressed.pdf | 18 Nov 2023 |
| Building plan approval or NA orderFile: Details of Layout_compressed.pdf | 18 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Details of Layout_compressed.pdf | 18 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Details of Layout_compressed.pdf | 18 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: development agreement_compressed (1).pdf | 18 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final2_compressed.pdf | 10 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: No encumberence certificate.pdf | 9 Nov 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Future City I | Near Gangwani scheme Ranala Road Bhilgaon Nagpur 440026 | Completed | Feb 2022 | Late, Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Future City II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhilgaon2,800+ in Nagpur
Filed coordinates, straight-line distance. 25 registered projects within 2 km.
Swapnapurtee - A Project by NMC
SANDEEP DWELLERS PVT. LTD.
KARAN KOTHARI BUSINESS PARK SHOPPING VILLAGE
KARAN KOTHARI BUSINESS PARK PRIVATE LIMITE
HBA PARK PHASE-I
HBA CONSTRUCTION COMPANY PVT.LTD
OAK SHANTINIKETAN
OAK Constructions
RAI CREST
RAI UDYOG UNITY MEDISCIENCE PRIVATE LIMITE
BHIL CITY 3
MOHAN BAPURAO MAKDE
See every Nagpur project, with the district possession charts
Builder: Eknath Wasudeo Bhanare
Eknath Wasudeo Bhanare has 1 registration on MahaRERA, including Future City II. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Future City II is delayed beyond 26 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Future City II?
The registered promoter entity is Eknath Wasudeo Bhanare, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Future City II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Future City II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Future City II?
The professionals named in the filing: Architect: Rajesh Chhotelal Tripathi; Architect: Rajesh Tripathi; Engineer: Rajesh Chhotelal Tripathi; Engineer: Rajesh Tripathi; Chartered Accountant: D P Sarda & Co; Chartered Accountant: Padma Vyas. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Future City II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.